Stan Ruiter 1104 Shiraz Blvd Amarillo Texas 79124 (360)
836-2248 s.ruiter@yahoo.com stanruiter@gmail.com SUMMARY
OF QUALIFICATIONS Senior
Project Manager with more than 25 years of management and engineering
experience More than 20 years splicing and construction experience seeks
Outside Plant Operations Director, Project Management, Construction
Management, or similar position. ·
Exemplary performance record with world-class employers and
clients including Verizon, Windstream, CenturyTel, PacBell, AT&T, and
Lockheed Martin, NTS. ·
Skills include project administration from design to
completion, contractor selection and contract negotiations and supervision of
the contractors,GIS Mapping, budget management, and staff management and
evaluation. ·
Excellent communication, problem-solving, and management
skills; completes projects April on
time and within budget while maintaining strong team morale and building
excellent client relationships. January 2015 to present RW Communications OSP Engineering
manager Carlsbad and SE New Mexico BAU Engineering. Direct contract engineers
on daily assignments, design projects and place into Windstream’s Job Trac
program. Meet with Customers to identify problems or projects and resolve
them. April 2014 to present design engineer OSP GW Comm. Amarillo
Texas Design fiber routes for AT&T and Windstream. DLC cut overs and
building entrance design. April 2013-March 2014 design engineer project manager ID
Consulting Amarillo and Abilene Texas. Design fiber routes for
construction and permitting for NTS fiber project. Mapping routes utilizing
Google Earth and GIS Maps. Manage the overall project. March 2013 – March 3013 - Manage project OSP Design Engineer
ACRS Vinita Oklahoma Stake and design FTTH backbone, and laterals for Rural
Electric Co-op. July
2012,- December 2012 OSPM design Engineer Engineering Associates Sherwood
Oregon, routine BAU work orders, Fiber to the cell ,RT sites and any and all
project handed down by Century Link Jan
2012 to July 2012 Project Engineer TE Connectivity West Virginia, Ohio, and
Pennsylvania. Manage the Design and build out of fiber to the cell. Verify
and GPS backbone and laterals utilizing Google Earth and Delorme Mapping for
GIS mapping of routes and way points. Managed and Scheduled crews and
materials for the project. Design
and build GIS maps for routes and splice points verify all slack loops and
document on GIS maps. Oversee all construction and inspector personnel for
quality and safety issues.Supervise the construction and installation of all
cabinets and electronics. Supervise all splicing and scheduling of equipment
placing Attend biweekly progress meetings update Windstream. For
recommendations please call Bo Slawson at 770-548-9830 or 678355-6484 April
2011 to December 2011, Design OSP Engineer Huntsville Alabama On premise OSP
engineer AT&T. Take field notes, design fiber and copper distribution
routes with BSTCAD. Design VRAD applications Design replacement cable routes
for storm damage or growth.Design fiber routes to cell sites both aerial and
underground to provide fiber at the cell site.Design GPON networks for
Greenfield applications and FTTN for Brownfield applications. Resolve out of
net problems and provide solutions for new service orders where no
service exists. November
2010 April 2011. QA/QC manager CONUS. Lead quality control engineer fiber
project across the US and overseas Hyperion Inc. Dispatch and supervise QA
engineers for Brac and other projects for the US Army worldwide. Make sure
projects were covered at all times. Insure daily and weekly meetings and
reports were attended to. July
2010 to October 2010 Signal Solutions principal engineer design and oversee
the construction of network cable routes fiber and copper.Document and
archive. February
2009 Shifflette and Associates to July 2010. Bend Ore. Installation and
implementation of radios and other
equipment at cell sites. Do all the testing on CCU”S. Install and test
Batteries turn up sites and do final inspection. .Spokane design back haul
fiber to forty two cell sites get all right of way information and get all
permit information and drawings get permits from the various city county
state railroads etcetera. August
2008 to Febuary2009-Schifflette Joint Partners Design engineer, New York, New
York design FTTP building entrances and ISP for MDU’S for references call Joe
C Stewart IV 951-212-4654. March
2008 – August 2008 OSP Planning Engineer Qwest Communications Albuquerque
N.M. Research
and implement solution to ongoing need for infrastructure and electronics for
VRAD. For references and recommendations please call Rodney d. Lewin Manager
of planning and engineering New Mexico 505-245-6142 Aug
2008- March 2008 design / route engineer Time Warner Telecom, Albuquerque M
N. Engineer and design route extensions and building entrance cables. Oversee
construction by contractors and Time Warner personnel. Interface with
customers to resolve conflicts and reassure clients.Design FTTN solutions for
overlay of existing subdivisions and TFFH for new (or greenfield
subdivisions) Jun 2007 to
July2008 BAU design Engineer RJE Phoenix Arizona Attended a two week course
on OSPFM, design fiber to the cell fiber to the node and bau copper
facilities as needed. May
2007 ARES training Fresno Ca January2007to
April 2007 route engineer AT&T Riverside Ca. August
2005 to December 2006 OSP Design Engineer on premise for Verizon Ca. In
charge of two ACOS, San Jacinto and Valle Vista for all OSP design and build
also all Dor’s (delayed service orders request). Design FTTH for new
subdivisions ( greenfield) and overlay on existing (brownfield) subdivisions. May
2004-July 2005 Amerris FTTP Riverside Ca. senior design engineer for Verizon
Ca. perform field verification and detail engineering for the FTTP program. . January
2004-May 2004 Cendera Technology Design Engineer Verizon fiber to the home
Santa Monica Ca. Provide field verification and design feeder routes for the
FTTP project May
2003-November 2003 Nationwide Engineering project manager San Francisco bay
area. Manage a team often to twelve OSP Engineers on Comm Cast Projects.
Design solutions for MDU’s Construction Manager / Project Engineer June
2002 – March 2003 Lockheed Martin, Hawaii Assess,
design, and manage construction of new screening and monitoring areas at
various airports as part of Transportation Security Administration Strategic
Airport Security Rollout (TSA-SASR) Project. Project Manager Jan.
2002 – June 2002 Perot Systems, Napa, CA Audited
and mapped existing infrastructure for the replacement and upgrade of a large
hospital’s switch and IT system; completed product on time and under budget. Site Manager March 2001 Teletech Plus, Inc., Fallon, NV As
server farm project site manager / OSP/ISP engineer I supervised and oversaw
the server farm construction and fiber optic cabling, racking, and
installation of RICS and L700 Storage Tech Units. Design and build ISO routes
and implement the roll over from the legacy net to the NMIC net. I met with
Navy, Marine Corps and General Dynamics Supervisors and other contractors on
a daily basis to map out and strategize daily operations. I managed and
coordinated logistics and supply. I supervised Teletech Plus and other
contractors in the installation of computer floors and all components of the
server farm and supervised a 24-person OSP engineering staff. Worked closely
with site transition and distribution manager to overcome many project
challenges. Managed the installation of straight shot osp fiber network. I
managed the installation of hubs and all isp cable routes,cable trays and
cable fiber terminals. I have letters of recommendations for this project. Project Manager 9Nov. 2000 – Mar. 2001 Westshares, Inc., Millbrae, CA Special
Project Engineer RCN Provide detailed field notes and design cable routes for
distribution to the customer, along with building entrance cables and hubs. OSP / Project / Design Engineer July 1999 – Nov. 2000 AT&T Local Services, Oakland, CA Supervised
multiple and concurrent fiber optic network construction projects. Supervised
and trained engineers and fiber splicers’ office staff of eleven. Engineered
San Francisco International Airport sonnet ring (56 miles). Prepared bid
documents, secured bids, and oversaw construction of project, including the
splicing of fiber and fiber tie-ins; supervised turn-up and prepared
completion documents. Held weekly update meetings with Airport commission,
Contractors, and AT&T counterparts. Senior Design Engineer, Quality Control Jan.
1999 – July 1999 Parsons Brinkerhoff (Aerotek), Livermore, CA Prepared
field drawings for permitting railway crossings, Cal Trans crossings, aqua
ducts, wetlands, and navigable waterways, evaluating and referencing GPS data
and field drawings. Completed all routes. Senior Design Engineer Aug. 1998 – Jan. 1999 BHC Engineering, Inc. Engineered
and designed routes from El Paso, TX to Yuma, AZ; Phoenix, AZ to Tucson, AZ; Sacramento
supervised four crews of three surveyors each. Construction Manager Jan. 1998 – Aug. 1998 Bell Atlantic, San Jose, CA Supervised
contract splicers and linemen on Pac Bell T&E contracts managing crews of
30-40 and a sub-contract company with 24 employees. Coordinated scheduling
with Pac Bell supervisors. Splicer / Splicing Supervisor Feb. 1995 – Oct. 1996 Volt Telecom, Millbrae, CA. Promoted
to supervisor within two months of hire.Oversaw and dispatched 20-30
splicers. Prepared as builds and completion reports. Partner / Vice President Oct. 1993 – Dec. 1994 CSR Cable Construction & Eng.,
Santa Cruz, CA Managed
all estimating and construction for Pac Bell and GTE contracts. Manager / Estimator Nov. 1992 – Aug. 1993 Primetime Cable Construction Operations,
Rancho Cucamonga, CA Expanded
service offerings by securing Pac Bell contracts in Southern and Northern
California. Managed 30-50 splicers and linemen. Estimated all bids,
maintained a good rapport with client representatives, conducted routine
field walks, and prepared completion reports. Operations Manager / Estimator Apr. 1991 – Nov. 1992 Macco Construction & Communications, Southern
California Managed
force of 50-60 splicers and linemen. Estimated 1991 Butler Communications, Santa Rosa, CA managed a
force of six maintenance splicers and twenty construction splicers. Maintenance and Construction Supervisor / Splicer / Splicing
Foreman Feb. 1981 – Dec. 1988 ATU, Anchorage, Alaska Previous
experience includes: OSP Supervisor, VITELCO, Saint Croix, US Virgin
Islands Operations Manager/Splicing Supervisor, GTE,
Beaverton, OR United States Army six years with an honorable
discharge. SGT-E5 Top Secret Crypto clearance. EDUCATION
/ TRAINING Project Management Certification Program, Villanova University – Currently
enrolled Fundamental Engineering and Management, GTE,
two years Electronic Engineering and Drafting, Clark College, Vancouver, WA, two
years GPS Level 3, Vo
Carta, Walnut Creek, CA Numerous
one- and two-day Safety and Product short courses Software
skills include: Microsoft Windows NT,
Microsoft Office, CAD 2006, and Visio 2007,auto cad 2008, ICGS,RAMS, Lotus
Notes, IDDS AAIS and other Verizon programs AT&T OSP-FM, BST Cad,MS
Project. |
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Languages: |
Languages |
Proficiency Level |
|
English |
Advanced |
|
|
|