* Microsoft Office: Word, Excel,
Visio, Outlook, Project, Power point
CERTIFICATION
· Ericsson
RBS LTE Certified
· Ericsson
RBS UMTS Certified
· Ericson MS
RBS 6000 CDMA/LTE
· MA
Commissioning, MAVE Commissioning
· Project
Management Professional PMP (In view)
· PE (In
view)
PROFESSIONAL
EXPERIENCE
Samsung Network Services America
IMP Engineer.
LTE/CDMA: Samsung–
Sprint/Region 3; Region 10Jul. 2013-Mar. 2015
·
Migration of NV from legacy BTS (MetroCell)/Lucent to
Samsung MMBS (Multi Media Base Station). Migration of over 150 Cell sites.
·
Conducting Migration 1 and M 2 on TDM, fiber and Micro
wave with various configurations.
·
Configured and supported Cisco ASR 901 routers
installation, upgrading the Cisco IOS image, Install AdvancedMetroIPAccess
license, and scripts and troubleshot.
·
Installed 4G expansion of 2.5 MHz TDD LTE DU shelves,
commissioned and ATPed
·
Conducted over T1 cabling and troubleshooting for over 120
sites
·
Conducted Acceptance Test Procedure (ATP) for over 200
sites
·
Troubleshooting and alarm clearing on the MMBS and BBU
cabinets
Avion Systems. GA, USASep.
2012-Jul. 2013
PM/Lead Engineer.
LTE/CDMA: Ericsson
– Sprint/FL
·
Installation,
commissioning and integration of LTE RBS 6102; RBS 6201 Cabinets with and
without BBU.
·
Perform
hotslide on the legacy BTS (MetroCell).
·
Perform the
1xVoice RBS integration, verify the DBA is up, voice carriers and
sectors are taking voice traffics, activating the AEM card and verify that
the DBA EVDO is Blossom and taking data traffics.
·
Perform NV
migration from the legacy BTS (MetroCell) to RBS (DBA), and verify the DBA
and the AEM card is up, voice and data carriers are enabled/fully_blossom,
and taking traffics.
·
Perform the
1xVoice RBS and DOM Daisy Chain migration from the legacy BTS
(MetroCell) to the RBS (DBA), and verify the DBA is up, voice carriers and
sectors are blossom and taking voice traffics, and data calls on the
MetroCell.
·
Perform an
SIU cutover
·
Perform
SIU/DOM Daisy Chain cutover
·
Perform the
SIU integration that will convert the T1s to Ethernet backhaul via the SP
210/310.
·
Integrations
on 4G LTE DULs on fiber Backhaul, and 3G 1900/800 DULs with SIU on T1, with
various configuration; Temp Ground Mount , Tower Mount, Full build.
·
Upgrade 3G,
4G Software Packages on the DUL and ensuring right connections are made from
the DUL to the XMU, and to the SP210/310 and SIU in the case of SIU
conversion.
·
Perform
hardware upgrade on the Legacy BTS (MetroCell) from DCG to eDCG.
·
Troubleshooting
and clearing of alarms on the Legacy BTS (MetroCell) and RBS (DBA) shelf.
·
Performing
QScoping of SP in the BOX.
·
Prepare
engineering documentation for site activity to E///.
LTE: Ericsson
– Sprint/TX
·
Coordinates site activities and ensure that all team
members working to meet the Project goals.
·
Ensure all E/// and customer safety guidelines and
procedures are followed during the project.
·
Prepare status report on the progress of project for E///.
·
Supervise, coordinate the activities of team members
·
Prepare daily schedules and ensure that they are followed.
·
Attend progress meetings and conference.
·
Troubleshoot any problem as required during the project.
· Prepares
regular interval progress reports as required by the project
· Prepare
documentation for the Battery audit, track change order, write claims, order
and return materials.
Quanta Wireless Solutions-TX,
USAMar. 2012- Sep 2012
Engineer.
LTE: Ericsson
– AT&T/TX
·
Commissioning and integration of LTE DUL solution,
including installing GPS antenna
·
Scratch Load Basic package, site specific configuration
scripts
·
Prepare and terminate transport on SIAD to DUL
·
Call testing including. CSFB and PSAP SIM
·
Alarm Clearing and Troubleshooting
UMTS Ericsson – AT&T/TX
·
UMTS 1st, 2nd, 3rd, 4th, and 5th Carrier Commissioning and
Integration DUW solution.
·
UMTS 3rd and 5th Carrier Installation, Commissioning and
Integration OBIF solution
·
UMTS 1st, 2nd, 3rd and 4th Carrier installation,
commissioning and Integration on AT&T project.
·
Node-B Alarms/Faults Troubleshooting, RSSI and VSWR
troubleshooting.
·
Smart Laptop integration of UMTS 1C, 2C, 3C, 4C and 5C and
troubleshooting where necessary on AT&T projects
· Review
site specific configuration scripts to confirm it accuracy for integration.
· Verify
Transport to OSS and Troubleshoot when necessary.
· Performing
a split power integration
· Creation
of sites Close out package reports and customer presentation.
· Hardware
installation, Commissioning, configuration and integration of Node B
Avion Systems. GA, USAJul.
2010-Mar.2012
Engineer.
UMTS 1st, 2nd, 3rd and 4th
Carrier Commissioning and Integration AT&T
· F1 &
F2 Commissioning & Integration of UMTS RBS 3206/3106/3418/3518
· Terminate
AC/DC and power up Node. Scratch Load Basic package, site specific
configuration scripts.
· Verify
Transport to OSS and Troubleshoot when necessary.
· Prepare
and terminate T1 cables to Node-B, Coordinate with NIC & ATT switch on
Integration
· Alarm
verification and testing. Circuit /Packet/E911 Call testing on all sectors.
· Upgrading
SW on the Node using FTP program and EMAS.
· Preformed
Ericsson WCDMA/LTE Equipment installation, commissioning, and integration and
troubleshooting for AT&T, Metro PCS and Verizon Projects.
· Hardware
installation, Commissioning, configuration and integration of Node B, eNode
B.
Commscope/MPCS
· Install UL
approve component to wireless Integrated Electronics Outdoor Cabinets, and
ensure that Cabinets confirm to Underwriters Laboratory (UL) standards
UMTS 1st, 2nd and 3rd Carrier upgrade AT&T Scoping
(Equipment Engineering)
· Review
cell site survey document and upload to Client Data base (Siterra).
· Create
accurate and executable Scope of Work (SOW) for the required site
construction/ modifications based on documented information made available,
such as RFDS sheets, Site Survey sheet, site photos, and construction
document and populate them in an OOM.
· Create the
Bill of Materials (BOM) that accompanies this SOW taking into account any and
all site nuances such as number of lines, or number of sectors.
· Quote the
SOW and submit these quotes as required for starting the budget creation and
material ordering
process
· Modify the
quote as required per the Project Manager (PM) through the life of the
project
·
Design the configuration of AT&T cell sites in the
Gulf States Region, about (Ericsson 3G sites).
·
Determine the layout, equipment/parts/cabling needed,
appropriate power supply, and convert into AutoCAD drawings where necessary
then place orders.
LTE (Long
Term Evolution) / 4G
Ericsson
- MPCS/Verizon FL
·
Installation, commissioning and integration of LTE 6201
Cabinets including Commscope enclosure with or without BBU. Install ac/dc and
transport conduits, terminate ac or dc cables and power up equipment.
·
Prepare and terminate T1/ETH cables to E-NodeB,
·
Scratch Load Basic package, site specific configuration
scripts.
·
SIU integration
·
Deblock S1 interface and cells, coordinate with NIC and
troubleshoot when necessary.
·
Alarm verification and testing. Data Packet Call testing
on all sectors.
·
Alarm Clearing and Troubleshooting
MTN Nigeria Communications Ltd. Lagos, Nigeria.Sep.
2007-Feb2010
Design Engineer/PM.
·
Develop the specification for introduction of 3G network
to MTN Nigeria
·
Develop site build solution that reduce cost of site build
by 40%
·
Develop Collocation Specification for National Operators
in Nigeria.
·
Develop specification and schematic design for deployment
of Worldwide Interoperability for Microwave Access (WiMAX) technology in MTN
Nigeria.
·
Conduct field survey, recommend solution for Fiber Optic
Cable (Plant) route protection
·
Conduct trial for the migration from BTS 3012/RBS 2206
& BTS 312/RBS 2202 (Indoor Cabinet) to BTS 3900A/RBS 2116 (Outdoor Unit)
and develop the specification for the migration.
·
Conduct trial for the migration of the RF 7/8” cable from
Copper coaxial cable to 7/8” FXL780 Coaxial Cable aluminum.
·
Conduct trial for the migration from Dual band Antenna to
Triband Antenna, the installation and configuration of the Remote Electrical
Tilt (RET)
·
Conduct trial to determine the performance and
profitability of installing Tower Mounted Amplifier (TMA)
·
Specify Design requirement for Tower to be purchased and
conduct Tower audit to ascertain suppliers’ compliance with MTN N
specification.
·
Specify the criteria for acceptance of pile
construction/installation
·
Conduct trial for Diesel Consumption reduction initiative
·
Develop specification for Aerial Cable installation
·
Develop specification for installation RDLU that will be
used for FTTx
·
Develop a Yellowatt Security Bunker/Flat Packed
specification, a security initiative to prevent fuel theft
WorleyParsons-DeltaAfrik
Engineering Limited. Lagos, NigeriaNov. 2006-August 2007
Cad Designer-Civil / Structural
Projects: Delta South Quarters Project (Chevron Nigeria Ltd.); Oso-Condensate
Pipeline Replacement Project (MPN); Etim Asasa Development Project (MPN)
·
C.A.D. design of Riser Guard and Riser Clamps, Mezzanine
Deck Extension, Cellar & Sump Deck Extension, Antenna platform framing,
grating & handrail, Equipment & Pipe support and generating Material
Take off (MTO) for it
EGYPRO NIG.
LTD. Lagos, Nigeria/IHSDec. 2002 – Oct. 2006
Engineer
·
Conduct Technical Site Survey (Field Survey) for over 120
BTS cell sites
·
Supervise the subsurface investigation
·
Executed daily operations of preparing of civil,
structural and site location drawings of cell sites on AUTOCAD and other
software packages
·
Making as built drawings, Cell site Grounding drawings and
site documentations of Cell sites handled by the company with AUTOCAD and
others software packages
·
Coordinates construction scheduling of BTS/MSc Cell Sites
for Mobile Telecommunication.
·
Generating and maintaining document control system
·
Setting up and maintaining a library\archive of all Site
documents
·
Establishing and implementing document distribution
matrices to ensure that key project documents, including drawings are issued
to the appropriate parties within and without the company for review approval
or information as appropriate
·
Conducts Site Survey and inspection for Proposed &
As-Built Layout on various Cell Site /Central Office.
EDUCATION
Federal
University of Technology, Akure, Ondo State, Nigeria
Post
Graduate Diploma (PGD) Civil Engineering (Structures) 2000-2002
The Federal Polytechnic, Bida, Niger State, Nigeria
Higher
National Diploma (HND) Civil Engineering (Structures) 1994-1998
PROFESSIONAL
MEMBERSHIP
Project Management Institute. (P.M.I.)
American Society of Civil Engineers (ASCE)
Training
MTN/MDATA Solutions - 8335 Academy Rd, Ellicott City, MD 21043 USA
P.M.P. Exam preparatory course
American Red Cross
First Aid, CPR and AED Certified
Excellent References
Available Upon Request