From: route@monster.com
Sent: Friday, September 11, 2015 1:26 PM
To: hg@apeironinc.com
Subject: Please review this candidate for: osp
This resume has been forwarded to
you at the request of Monster User xapeix03
|
|||||||
|
|||||||
|
|
|
||||||
|
||||||
|
John Pak gunny0212@yahoo.com 951-491-4982
3538 Morro Hill Road Hemet, California 92545 OBJECTIVE Seeking a position as a Project /
Construction Manager where I can continue to grow and professionally merge my
values, enthusiasm and experience to provide professional direction and
become a valuable asset to my company.
PROFESSIONAL PROFILE ·
Strength in
management with outstanding organizational and project coordinating skills
over 20 years of Military experience and 15 years of wireless experience ·
Competent in
working within a budget and able to prioritize workload meetings, exceeding
expectations without sacrificing quality and creativity ·
Extremely
competent with a proven record of success in assuming increasing levels of
responsibilities and performs well under pressure ·
Proficient at
compliance with government regulations and codes ·
Skilled in problem
solving, communication, interpreting concepts and reporting performance ·
Supportive
team member; actively participating in creating a good working environment ·
Highly
motivated and self-confident BUILDING AND CONSTRUCTION PROFILE ·
Fourteen plus
years of professional construction / wireless network experience. ·
Successfully
bid and negotiated contracts of up to12 million dollars and up to 125 jobs
per year. ·
Attend
seminars and trade shows to monitor construction and wireless industry
trends. ·
Experience in
caissons, foundation pads, cement, block, structural roof re-enforcement,
steel framing, TI's/T3’s and stealth design and installation. ·
Promote
safety by OSHA standards. ·
Proven track
record for quality work and project management. PROFESSIONAL CREDENTIALS Project Manager K&S
Communication T-Mobile/AT&T/Sprint 2.5 Project) Buena Park. Ca Dec 2013- May 2015 In charge of Planning, Training and
directing the New / Modification construction project, AT&T /
T-Mobile Small cell project, Closeout, while tracking the progress of
construction operations such as arrival and utilization of materials,
supplies, tools, machinery, equipment, order BOM for cell site, SOW for
project. ·
Reviewed all
drawings to ensure that all required standards and details, including
conditions of submittal and approval, are included in drawing sets as
required Participated in preliminary sites. ·
Walks to
insure that proposed site designs could be built within acceptable financial
constraints, Create SOW and BOM for modification of cell sites. ·
Perform and /
or directly oversee all activity relating to installation, fabrication or
construction work, train new CM’s and inspect all cell sites for QA walk. ·
Communicate
regularly and work closely with Techs, PC CM and PM to ensure overall quality
and timely completion of jobs. ·
Direct CM’s ,
crew and individuals on sites; ensure each person is aware of SOW for the
workday and the timeframe for completion; communicate and carry out quality
expectations ·
Practice,
teach, and enforce all applicable safety rules, policies and procedures,
continuously watch for report or correct unsafe working conditions or
behaviors as appropriate. Ensure accidents/incidents are promptly reported
and investigated ·
Within 1 ½
years months I have save $350K on material and made profit margin of 32% per
project and complete the job earlier or within time period Construction Manager Ericsson
(T-Mobile /AT&T Project) Irvine, CA June 2012 – Dec 2013 Is in charge of Planning, Training and directing
the construction project, while tracking the progress of construction
operations such as arrival and utilization of materials, supplies, tools,
machinery, equipment, order BOM for cell site, SOW for project. ·
Reviewed all
drawings to ensure that all required standards and details, including
conditions of submittal and approval, are included in drawing sets as
required Participated in preliminary sites. ·
Walks to
insure that proposed site designs could be built within acceptable financial
constraints, Create SOW and BOM for modification of cell sites. ·
Perform and /
or directly oversee all activity relating to installation, fabrication or
construction work, and inspect all cell sites for QA walk. ·
Communicate
regularly and work closely with Techs, PC and PM to ensure overall quality
and timely completion of jobs. ·
Direct crew
and individuals on sites; ensure each person is aware of SOW for the workday
and the timeframe for completion; communicate and carry out quality
expectations ·
Practice,
teach, and enforce all applicable safety rules, policies and procedures,
continuously watch for report or correct unsafe working conditions or
behaviors as appropriate. Ensure accidents/incidents are promptly reported
and investigated ·
Upon
completion of project I have saved $1.7 million dollars’ worth of material
and save over $600K worth of man hours. ·
PM Wireless Division - ANGELES
CONTRACTOR, INC. Buena Park, CA. Dec. 2009 - June. 2012 ·
Participated
in preliminary site walks to insure that proposed site designs could be built
within acceptable financial constraints. ·
Actively
participated in meetings with other managers, vendors, and team members to
review the status of each project and implement changes as necessary to
ensure timely project completion. ·
Checked all
Sweep, PIM for all coax lines and Fiber test for LTE. Also performed
all Bid walks and submitted bids to wireless communication companies. ·
In charge of
Motorola project in South Korea with US Department of Defense on R56 project
for Homeland ·
While working
with ACI I have controlled and close each project earlier or within time line
and make profit of 28% per year and saved material cost of $300K annually Construction Mgr. Glotel (T-Mobile)
Simi Valley,
California
May 2008 – March 2009 Responsible for the financial performance,
and execution for all T-Mobile Construction Projects, Collaborating closely
with Senior Management, Project Management, and the Sales/Marketing
Organizations. Responsible for the construction of new cell sites and
integrations for T-Mobile. Accurately projected and ensured that all
assigned tasks were completed on or before projected dates. ·
Participated
in preliminary site walks to insure that proposed site designs could be built
within acceptable financial constraints. ·
Personally
reviewed all drawings to ensure that all required standards and details,
including conditions of submittal and approval, are included in drawing sets
as required. ·
Actively
participated in meetings with other managers, vendors, and team members to
review the status of each project and implement changes as necessary to
ensure timely project completion ·
In charge of
20 General contractor building 150 cell site which cost average of $125K to
$285K per site. Construction Mgr. McBride
Electric Menifee, California
June 2007 – May 2008 In charge of building new cell site
integrations for all Wireless Communication Companies. Customers included
Cingular, T-Mobile, Metro PCS, Sprint and Nextel. Checked all sweep
tests of all coax lines and TMA’s. In charge of all Audits for wireless
communication companies. Also performed all Bid walks and submitted bids to
wireless communication companies. Construction Mgr. Inland Valley
Construction Bloomington, California Nov. 2005 – June 2007 In charge of building new cell site
integrations for all Wireless Communication Companies. Customers included
Cingular, T-Mobile, Metro PCS, Sprint and Nextel. Checked all sweep
tests of all coax lines and TMA’s. In charge of all Audits for wireless
communication companies. Also performed all Bid walks and submitted bids to
wireless communication companies. Area Mgr. AT&T / Cingular
Wireless San Bernardino, California
Nov. 2000 – Nov. 2005 It was my responsibility to service and
troubleshoot Ericsson RBS 2000 Base Stations. Responsible for testing and
troubleshooting T1, T3, Micro Cell and Microwave equipment. Performed
preventative maintenance on all cell sites, coordinated all Wireless
Technicians and Contractors work on assigned cell sites. Followed-up and
checked after work on all modifications on assigned cell sites. Significantly
reduced all call drop rates for Los Angeles market. Drop call rating from
2.79 to 1.25 within first 10 months period ·
Ericsson GSM
2000 Certified ·
Ericsson
CMS40 Certified ·
SBC Center
for Learning Hi-Cap Certified ·
Harris Micro
star Certified ·
Eltek
Rectifier AEON Gold Power System U.S. Marine Corps Gunnery Sergeant “Retired”June
1980 – June 2000 ·
In charge of
U.S. Combat Marines for overseas deployment ·
Mountain /
Cold weather Warfare instructor Bridgeport CA ·
Jungle
warfare “Army Ranger Program” Panama / Philippines ·
Desert
Warfare / survival training Instructor ·
Marine
Security Force U.S. Embassy Ghana ·
Marine
Security Force U.S. Embassy Chile ·
State Department
Counter Terrorism School FBI Academy ·
Marine Corps
Special Operations Unit camp Pendleton CA ·
IBM School of
Sales /Recruiting ·
US Marine
Corps recruiter Kennesaw Georgia TECHNICAL TRAINING |
|
|
||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Languages: |
Languages |
Proficiency Level |
|
English |
Fluent |
|
|
Korean |
Fluent |
|
|
Spanish |
Intermediate |
|
|
|