From: route@monster.com
Sent: Friday, September 11, 2015 7:49 PM
To: hg@apeironinc.com
Subject: Please review this candidate for: Outside Plant Engineer
This resume has been forwarded to
you at the request of Monster User xapeix03
|
|||||||
|
|||||||
|
|
|
||||||
|
||||||
|
DENNIS A. WAGNER 132 Brayton St Carey, OHIO 43316 (419) 396-4069 HOME (419)788-9350 CELL buckeyedwa2000@yahoo.com OBJECTIVE: To find solid employment with a
progressive, company. Learn as much as I can to benefit the company
where I can use my strong communication, computer and organizational skills. 04/2013-Present
Ameritraining OSP ENGINEER While working for Ameritraing I
ran fiber to ODOT poles and ran fiber for cell sites. I got my own permits and did all
required field notes. Places mux and FTB for businesses in Ohio and Michigan
for ATT. 04/2011-04/2013 ECSM
OSP ENGINEER While at ECSM I engineered fiber
to the tower for Verizon, AT&T. Did pole audits for Windstream to
make sure the other companies could get on safely. Did road moves, pole
audits for Sunesys, large copper jobs and small copper jobs both for
Windstream and Centurylink. 07/08-04/2011
Mountain LTD OSP ENGINEER PROJECT MANAGER While working with Verizon I did
Lite spans and place fiber. To placing either aerial or buried
cable. Did regular engineer for telephone from pricing to inquiring my
own right of ways from state to local. While working at Mountain LTD WAS
Project manager on larger jobs. I was responsible for the overall management
of the specific project (s) and insuring that the technical solutions and
schedules were implemented in a timely manner. Responsible for all aspects of
the project including cost schedules, documentation preparation and customer
interaction; 02/06-
07/08 Gibson and Assoc. OSP
ENGINEER PROJECT MANAGER While working for Gibson doing
FTTP for Verizon in Virginia and Penn. I QC all jobs from beginning to
end before going out the door to Verizon. While planning for Verizon I placed
hubs in safe and easy access places. While at Gibson and assoc. I did most of the MDU'S from
small apartment complexes to large 4-10 buildings in a Apartment complex. I was a
Project Manager; I was responsible for the overall management of the specific
project (s) and insuring that the technical solutions and schedules were
implemented in a timely manner. Responsible for all aspects of the project
including cost schedules, documentation preparation and customer interaction;
Ensures that all control gates are met on schedule; Performs organizational
wide integration planning and interfaces to other functional systems; ensures
that the project team members are fully utilized or are made available to
support other agency projects to meet the agency billability requirements. I
AutoCAD all my jobs per Verizon specs. 11/04-02/06
RJE TELECOM OSP ENGINEER PROJECT MANAGER I engineered major road moves
from moving entire pole lines to placing new fiber to a new remote.
Moved 900 pair cable from the air and engineered to go buried. Had to move a
cross box and relocated all cables coming from the remote to all homes it is
serving. Located new right-of-way and placed all cable within the
right-of-way to service home, including new drops and services to the homes.
I engineered new fiber from CO to the remote to feed a new sub-division.
Fiber was buried, underground or aerial to feed homes and cross-box. I did my
own measuring with a height stick and wheel. Inspected All fiber cable while being
placed in the ground. I engineered FTTP from the feeder to the hub,
from distribution fiber to placing the hand hole in the yard. Near the end of
the project, they placed me in project manager position and handled all of
the duties a project manager does. I engineered FTTP using my engineering
skills. I engineered small fiber all the way up to 432 fibers to feed either
business to large subdivisions placing a new hub and fiber according to the
house count. Placing hand holes in the right-of-way to service the
homes. I did my own measuring from height of the existing cable to each span
measurement. I inspected all buried fiber being put in the ground to make
sure was within required depth. While at Ameriss I was a Project
Manager I was responsible for the overall management of the specific
project (s) and insuring that the technical solutions and schedules was
implemented in a timely manner. I was responsible for all aspects of the
project including cost schedules, documentation preparation and customer
interaction; Ensures that all control gates are met on schedule; Performs
organizational wide integration planning and interfaces to other functional
systems; ensures that the project team members are fully utilized or are made
available to support other agency projects to meet the agency a billability
requirements. While being a Project manager they handed me larger jobs
to handle to get them done in a timely matter , under budget and always on
time. 10/92-11/04. HARRIS-MCBURNEY
LEXINGTON KY DETAILED ENGINEER Lexington I prepared outside work
orders with detailed construction drawings, pricing data sheets, material and
labor specifications, engineering design, permits, cut over sequence,
transmission design and facility exhaust information. Also conduct final
inspection of completed projects prior to final closing by construction to
ensure quality standards are met. Perform engineering analysis of outside
plant distribution facilities through records review initiate work orders
activity to ensure that plant are adequate to meet customer service
requirements secure and record right-of-way and easements associated with
outside plant work orders. I worked with state of the-art computer programs
such as cpms, icgs, wpg, mark and sources. While I was in Lexington I
engineered cable for cell sites and other wireless products. I ran cable for
t1 and dsl transmitting lines. I unloaded pairs or placed repeaters for
the t1 span line while at GTE I did road moves from buried cable to moving
poles. Also while working for GTE south did jobs from a new subdivision to
upgrading larger subdivision placed aerial, buried, fiber cable. Placed
larger pair gain units from cross-boxes, musks and smu. design a new
subdivision from cable to where to place the pedestals for the whole
subdivision this position had allot of responsibilities to have everything
done in a timely matter in accordance with company objectives and policies to
provide the highest quality service at the lowest possible cost. Got my maps
and other needed materials From icgs, mark runs and other
computer programs gte uses to get the job done. 5/88-10/92 D.O.CREASMAN KILGORE,
TEXAS DETAILED ENGINEER I engineered jobs from placing
drops to extend the cable for a new home. The larger job there was I
engineered a 900 pair cable from a remote to upgrade a tailor park and get
ready for a new housing development. Engineered a fiber from c.o. to c.o.
while working in Texas use a probe and toner to follow out a pair from either
a remote to home or c.o. to the pedestal. Used a probe and toner to fine the
pair all the way to the end. While at this job received a lot of knowledge of
all aspects of outside plant engineering. 8/83-8/88 GTE MARION, OHIO I engineered in Marion I drafted
to keep the plant up to date. Drew on Mylar maps to keep Ohio current with
the cable that was placed out in the field. EDUCATION: GRADUATE OF CAREY HIGH SCHOOL
WITH A 3.85 GPA ASSOCIATE DEGREE, MECHANICAL
ENGINEERING |
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Languages: |
Languages |
Proficiency Level |
|
English |
Fluent |
|
|
|