Jack Dwyer
6608 Indian Trail Sanger, TX 76266
(903) 816-4338
Email: Jdwyer1967@hotmail.com
OBJECTIVE: Seeking a position with a company that
has an opportunity for advancement on proven merit.
EMPLOYMENT:
Jan 12 to Pres.
Utility Relocation Superintendent
Bluebonnet
Contractors- North Richland Hills, Tx
Coordinate construction activities. Direct field and subcontractor
personnel to meet schedule and production goals, schedule field personnel
assignments, order materials, inspect construction work as necessary. Ensure
safety is carried out throughout the construction process. Ensure compliance
with quality requirements and standards.
Sep. 06 to Dec 11 Construction Coordinator
Verizon Southwest – Lewisville, TX
Inspect Outside Service Plant (OSP) Construction
work performed by contractors including substructure, placing and splicing.
Ensure timely completion of work orders, inspect for safety and adherence to
Verizon practices and procedures. Coordinate with developers and inspect
developer provided conduit. Participate in pre-bid and pre-construction meetings.
Make certain contractors invoices and as-builts are submitted in a timely
manner. Approve invoices and unit changes , ensure correct payment and
account codes for work performed and process CWR's as necessary.
May 05.-Sep. 06. Field Engineer
Tek Systems – Dallas, TX
Produce comprehensive outside plant engineering
documentation for
underground facilities. Implement Verizon OSP
engineering standards in
accordance with FTTP upgrade. Assist with
permitting of routes in
compliance with governing municipality. Revise
work prints to accommodate permitting authority changes, provide construction
updated copies for proper billing. Make recommendations for changes in
running line or construction methodologies due to knowledge of or experience
in environmental conditions, construction access by crews, or congestion of
utilities.
Apr.04-May 05. OSP Engineer
Ameriss – Dallas, TX
Produce comprehensive outside plant engineering
documentation for aerial and
underground facilities. Implement Verizon OSP
engineering standards in
accordance with FTTP upgrade. Perform inspection
of the OSP feeder and
distribution facility for efficient cost
effective design. Assist with permitting
of routes in compliance with governing
municipality. Support construction underway, assist contractor with running
line changes, hub & hand-hole placement.
Feb 03-Mar04 Construction Inspector
Leslie and Assoc.- Cedar City, UT
Inspect contractors installation of water system
upgrade for Moapa Valley Water District in Overton, NV as required by funding
agency. Document construction underway of main line and residential water
services (pvc, ductile, poly) oversee installation of Fire Hydrants &
Vaults. Supervise chlorination and testing of new water lines to meet AWWA
requirements for drinking water. Oversee restoration of asphalt and concrete,
compaction requirements, re-seeding. Maintain accurate records for owner
(as-builts). Attend meetings, review change orders.
Sep. 02-Feb. 03 Equipment Operator
Henkels and Mccoy - Lewisville, TX
Operate trencher / plow, backhoe for installation
of telephone line (copper & fiber ) & installation of peds. Drive
tractor-trailer to transport equipment to various jobs. Maintain accurate
paperwork for equipment maintenance, project
billing and crew hours. Supervise (3) man labor
crew. OSHA trained in excavation safety.
Dec 01-Sep.02
Const. Superintendent
Patton Management Group - Roswell, GA
Maintain control of OSP activities surrounding
given worksites; maintain accurate records of construction underway in order
to support the requirements of the project contract. Accounts for own and
subcontractors’ work performed at any phase of construction and provides
written correspondence to the team, the owner and governmental agencies as
required during installation of PF. Net fiber optic cable along existing
AT&T Right-of-way.
Mar.01-Dec.01 Lead OSP Engineer,
Adesta Communications - Golden, CO
Accurately interpret underground utility records
in order to prepare engineering field notes in sufficient clarity and detail
to facilitate conversion to CADD programs. Make recommendations for changes
in running line or construction methodologies due to knowledge of or
experience in environmental conditions, construction access by crews, or
congestion of utilities. Actively participated in the engineering, permitting
and construction process to support the requirements of the project contract.
Supervised a team of (8) inspectors for Adesta Communications CDOT project.
Jun.99-Mar. 01 OSP Engineer
Cleveland Inspection Services - Cleveland, OK
OSP and permit engineering on both metro and
cross-country fiber optic projects. This included red lining, but not limited
to field drawings of the routes necessary for the most efficient and cost
effective build of each project as contractor for Adesta Communications CDOT
project.
References available upon request