From: route@monster.com
Sent: Friday, September 11, 2015 7:55 PM
To: hg@apeironinc.com
Subject: Please review this candidate for: Outside Plant Engineer
This resume has been forwarded to
you at the request of Monster User xapeix03
|
|||||||
|
|||||||
|
|
|
||||||
|
||||||
|
RESUME Name:
Franklin V. Columna Address:
3124 Bloomingdale Villas CT Brandon,
Florida 33511 Tel.
No.:
Home (813) 653-0789
Cell (813) 766-2871 E-Mail:
franklin.columna@yahoo.com SUMMARY Has
8 years experience in Design/engineering of Fiber Optic and Copper Cable
Network in USA and 10 years experience in Project Management and 10 years in
Outside Plant Engineering Management in the Philippines
WORK
EXPERIENCE April
15,2013 to June 14, 2013 RJE
Telecom,LLC-Walk Out Engineer Gathered
field data necessary for the provision of fiber optic cable to
buildings including inspection of building communication’s room
,existing path and verification of available entrance conduits. March
23, 2012 to Oct.1, 2012 Progressive
Communication Services, Inc – OSP Engineer Designed/
Engineered Verizon‘s Fiber Optic/ Copper Cable Network projects
including removal of cable attachments from power poles/rerouting to buried
installation and prepared its permit requirements in Florida May
9, 2011 to March 16, 2012 Engineering
Associates Technical Services, Inc- OSP Engineer Designed/Engineered
Windstream’s Fiber Optic Cable Network for Remote Switches and cell sites
projects in Florida and Fiber Ring in Georgia and prepared its permit
requirements April
4, 2011- May 5, 2011 Lambic
Telecom – OSP Engineer Designed/Engineered
Windstream’s Fiber Optic Cable Network for Remote Switches and cellsites projects
in Georgia August
22, 2005 to March 25, 2011 Progressive
Communication Services, Inc. – OSP Engineer Designed/
Engineered Verizon’s Fiber to the Premises (FTTP) Projects (Feeder and
Distribution) including FOC provisioning for Cell Sites projects in Florida
and South Carolina and prepared its permit drawings Designed/Engineered
AT&T’s Fiber Optic Cable provisioning for Video Ready Access Device and
Cell sites , F2 conditioning and Pair Bonding projects in Chicago and
Indiana and prepared its permit requirements April
5, 2004 – Aug. 5,
2005
Ameriss
Corp. – OSP Engineer Designed/
Engineered Verizon’s FTTP Feeder and Distribution Projects in Florida and
prepared its permit requirements Aug.24,
1971- Dec. 31, 2003 Philippine
Long Distance Telephone Co Senior
Manager(1993-2003) Responsible for the project management of
the company’s Telecom Network Expansion Project from design/engineering,
installation/construction, testing/acceptance to commissioning of Outside
Plant, Subscriber Loop Plant and Inside Plant Networks and
construction/acceptance of Exchange/Central Office buildings Manager
1983-1993 Responsible for the design/engineering of Feeder and
Distribution Cable Network, Fiber in The Loop and Inter Office Trunk Cable
projects including its associated manholes and conduits,setting up of
guidelines and standards and creation/ development of System Practices on
Outside Plant Engineering Design and Construction and preparation of Bidding
and Contract documents including technical specifications and Evaluation of
Bids and Recommendation to Award Supervisor/Engineer
1971-1983 Supervised/ designed/engineered Outside Plant Network . EDUCATION Graduate
in B.S. Mechanical Engineering
Mapua
Institute of Technology 1969- Philippines COMPUTER LITERACY Microsoft Outlook, Word, Excel,
Power Point, Microstation, Blue Beam TECHNICAL
TRAININGS AND SEMINARS among others Construction
Management……………Ateneo University - Phil. Loop
Network Evolution ..................... AT&T Bell Lab - USA Power
Line Interference Solutions …………… SNC - USA Engineering
of Outside Plant Network….. Ericsson – Singapore Developments
and Trends in ISDN …….. Siemens - Germany External
Plant Work shops……Asia Pacific Telecommunity – Thailand Outside
Plant Engineering ……………………….NTT – Japan Outside
Plant Seminars ………………….Raychem – USA International
Wire & Cable Symposiums……………USA Underground
Systems
IEEE
|
|
|
||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Languages: |
Languages |
Proficiency Level |
|
English |
Fluent |
|
|
|