From: route@monster.com
Sent: Friday, September 11, 2015 7:42 PM
To: hg@apeironinc.com
Subject: Please review this candidate for: Outside Plant Engineer
This resume has been forwarded to
you at the request of Monster User xapeix03
|
|||||||
|
|||||||
|
|
|
||||||
|
||||||
Professional with hands-on experience, being able to
strike a successful between logic ˑ intuition ˑ creativity Seasoned
strategic, tactical and operational professional with extensive expertise leading the full scope of
onsite inspections. Impeccable business acumen with outstanding technical
skills and verifiable experience overseeing multi-faceted budgets. Talent for
leading others, restructuring teams, and managing change to deliver
excellence. Areas of Expertise:
Cerritos College ■ Cerritos, CANew Horizons ■ Culver City, CA RWM fiber Optics Certification(64128 Configuration/
Trouble Shooting Windows Server
2008) RSO Card (OSCA) TWIC Card Open Water Diver (PADI)
Network Infrastructure Certification National Association of communication Contractors
(NACC)Guard / Gun / Baton /CPR & First Aid / Mace • Category 5e & 6 Technician CertificationPC 832
/ Excel Security Academy Grad. • Fiber Optic Technician Certification
TRINITY THREE CO. LLC 2014-Present TRANSPORTATION MANGER Scheduling, inventory, daily production records
& logs, customer care, account management, & quality
control. CHC CONSULTING, LLC 2012 –
2014 INSPECTIONS/ ENGINEERING/ FIELDER Performed duties ranging from minor to increasingly
difficult. Completed site walks in an effort to survey MPOE equipment in
order to update AT&T records regarding new equipment for business
systems. Problem solving, maintained fielding’s and drawings for JPA and
Ocalc, JPA & GO95 jobs; personally oversaw and ensured the completion of
assigned projects ensuring that timelines were met. VERIZON2008 – 2012 ISP/OSP ENGINEER & SITE ACQUISITION MANAGER Tasks included monitoring and completion of assigned
engineering projects off-site for the Verizon organization. Drafted hub
designs, initiated FIOS redline drawings for MDU’s, MTU’s DOR’s BAU’s and
cell sites. Personally engineered NOOF projects FTTP QC and W.O. Release.
Further, created, released and maintained JPA F48 projects, IV APP, AAIS updates
and PAR/ER SME’s. Prepared proposals for external plant projects permit
paperwork for completion of builds; performed site walks as well as price
cost documentation for work orders. Acted and operated as lead engineer for
Verizon Business 405 freeway expansion project. AT&T2006 – 2008 CELL SITE, OSP & SPOC ENGINEER/ INSPECTOR Generated and completed the designs of cell and
microwave sites. Verified and completed the billing process while
simultaneously inspecting and monitoring the completion of the build.
Performed test and turn-up for fiver and copper cell sites. Utilized personal
knowledge of with support of AT&T database and equipment in order to
build sites, to include but not limited to: Ericson, ALU RF, LTE, RF, GSM and
NIU’s. EMMA CORPORATION2004 – 2006 SITE SUPERINTENDENT Solely responsible for safety and technology project
with Los Angeles Unified School District (LAUSD) Oversaw personnel
performance, prepared work schedules for electricians, carpenters, and
communication technicians from inception to completion of project.
Successfully interpreted blue prints, completion of pertinent office
paperwork while simultaneously performed fiber and copper technician duties
as needed. Performed the following test protocols in order to ensure proper
functioning of worked completed: Megar, Fluke and OTDR. In addition, fiber
termination (multi-single and ribbon) fusion splice, electrical, test on
transformers and electrical panels. |
||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Languages: |
Languages |
Proficiency Level |
|
English |
Fluent |
|
|
|