From: route@monster.com
Sent: Friday, September 11, 2015 7:40 PM
To: hg@apeironinc.com
Subject: Please review this candidate for: Outside Plant Engineer
This resume has been forwarded to
you at the request of Monster User xapeix03
|
|||||||
|
|||||||
|
|
|
||||||
|
||||||
|
Michael L. Hill 519 Grandview,
Newton, KS, 67114 316-706-4693 June-1991 –
December 1993 Non
Commissioned Officer, U.S. Marine Corps. Dec 1996 – May
2002 Light-Line
Inc., Crew Chief Planning,
maintaining, coordinating, installations, troubleshooting and repairs of new
and existing fiber optic networks, and scheduling crew shifts, work
production, and acting as a liaison between contractors and office across the
United States. Worked on live fiber (hot cuts)/restorations. ISP
(inside plant) and OSP (outside plant) installations including aerial
systems.. Trained/supervised over a dozen technicians; coordinated with other
crew chiefs on larger builds. Clients
included: MCI, Quest, Williams, IXC, Frontier, Adelphia/Comcast, Union
Pacific, Burlington Northern, Southern Pacific, CSX, Conrail, Amtrak, Global
Crossing and Level 3 communications. Specific
Technical Skills: Fluke power meters, Gnettest/CMA 4000/TD3000 and
Techranger OTDRs, Fujikari, Sumitomo & Fitel Splicing Equipment, Siecor,
Thomas and Betts, ADC, Telect, 3M, Preform, Captel and Lucent
Enclosures,Nortel, Foundry and Cisco Switch Installs. Sept 2002
-April 2005 TAD
Technical/Ark Systems, Lead Technician Oversaw over
30 crew members for network installs for U.S. Airforce Medical and Dental
facilities across the United States. Cat 3, 4, 5 + 6 cable instatllion.
Print preparation and distribution amongst crews; delegation of job duties to
crew members; quality assurance and reporting. Familiar with construction
methods and Bicsi Standards April
2005-January 2007 Light-Saber
Communications, Inc., Proprietor/Field Supervisor Subcontractor
for Verizon on fiber to premise in Florida, responsible for planning,
scheduling, and coordinating installations and repairs, including work on
live fiber (hot cuts)/restorations and Multi Dwelling Unit (MDU)
installation. ISP (inside plant) and OSP (outside plant) installations.
Managed 3-2 man crews. April
2007-August 2008 Contract
Engineer for AT&T U-verse system Fiber to the
node design, dedicated phone line design, design proofing and field surveys October
2008-April 2010 Mill Tel,
Inc, Installer References:
Available upon request |
|
|
|||||||||||||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||||||
|
|