From: route@monster.com
Sent: Friday, September 11, 2015 7:39 PM
To: hg@apeironinc.com
Subject: Please review this candidate for: Outside Plant Engineer
This resume has been forwarded to
you at the request of Monster User xapeix03
|
|||||||
|
|||||||
|
|
|
||||||
|
||||||
|
Ashanti Shakur: Telecom Technician 1568 Longfellow Avenue Bronx NY 10460 Home:
347-820-6614 Mobile:
914-226-1302 EXPERIENCE: Central Station Alarms- 07/2010 – Present I currently work as a part time consultant and
technician for Central Station testing and installing electronic
telecommunication equipment and hardware. · My
duties range from terminating UTP and shielded Cat 5, 5e and 6, RG6/9
coaxial, single mode fiber LC/SC, installing wireless access point, routers,
hubs, running patch cords, T1 demarcations, cable pair
qualifying, network troubleshooting and 24x7 service call-out. · Equipment
used- TRS SERIES RG 6-59 – Single Drop Trimmer – Cordless drill – Universal
400x Inspection scope- CrimpALL- Fiber One Shot Pro- Link Runner AT Network
Auto Tester- Link Runner Duo Ethernet Tester- 990 DSL Copper Pro Test Set-
Intelli Tone Digital Pro Toner and Probe- Air Check Wi-Fi Tester- and
Fujikura fiber fusion Machine. EXPERIENCE: VERIGENT Staffing:
04/2012 - 08/2012 I worked as a short term contractor for VERIGENT
on various assignments including APPLE Retail POS System upgrades
installing wireless routers, switches, Cat 5 terminations and FOH & BOH
terminations, PANERA BREAD building phone closets and installing Wireless
Access Points, & BRONX LEBANON HOSPITAL installing AVAYA 2410
& 2420 Digital phones. EXPERIENCE: Verizon Communications- 08/1995- 06/2010 OSP Technician – 1995- 2010 · I was a
cable splicer splicing PIC (Poly) and Pulp (Lead) cable, 25 pair to 3600 pair
Clock to Block, cable locating, cable pressurization and cable
troubleshooting and cable locates. · Spliced
single and multimode fiber with Sumitomo, Fluke and Fujikura fusion machines,
installed fiber in MDU’s, OTDR testing, 24x7 fiber recovery call-out. · Built
Token Ring loops, back-up fiber loop, T1 install, Central Office
OC3-OC12-OC48 Terminations, Cross connects and Testing. · Central
Office racking, cabling, lacing and Power terminations (CO Battery), power
cords, power outlets, Air Dryer and compressor rewire from 220v to 110 · Central
Office Chiller emergency response 24x7 · T1 to
Cell Site build test and install. · Manhole
testing & splicing · Aerial
splicing · 24x7
Fiber locates · Installation
of electronic transport equipment · Spliced
fiber grounded and installed Canoga Perkins for T-Mobile & Sprint-Nextel
at remote Cell locations and the Yonkers NY School System. · Head to
Head testing · Drilling
and anchoring heavy wireless equipment (UMTS transmitter- RF cabinets). · Verizon
FIOS testing, support and recovery · HDSL-
ADSL2- ISDN · BUCKET
TRUCK OPERATION · UNDER
GROUND TRUCK OPERATION EDUCATION: WESTCHESTER COMMUNITY COLLEGE: 02/2012
– 05/2012 Integrated Applications Microsoft Office Suite · MICROSOFT
WORD · POWER
POINT · ACCESS · OUTLOOK EDUCATION: LEHMAN COLLEGE- BRONX NY 06/2010
– 09/2010 Comp TIA+ Computers Alarm Programming CCTV |
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Languages: |
Languages |
Proficiency Level |
|
English |
Fluent |
|
|
|