From: route@monster.com
Sent: Friday, September 11, 2015 7:39 PM
To: hg@apeironinc.com
Subject: Please review this candidate for: Outside Plant Engineer
This resume has been forwarded to
you at the request of Monster User xapeix03
|
|||||||
|
|||||||
|
|
|
||||||
|
||||||
|
Brad Bowman Phone: (805)758-4343 E-mail: bbowmanx1@netzero.net AREAS OF KNOWLEDGE AND
EXPERIENCE Telecom construction and
equipment installation; OSP design and construction of conduit systems (underground &
buildings); contract administration; project
bids; project estimations; project supervision; project inspection; working
from blueprints, schematics, and technical manuals; problem identification
and problem solving; working effectively with customers, and city government
personnel; right of way issues; acquisition of permits; copper, fiber optic
cable, and equipment placement; copper cable splicing and termination;
Microsoft program applications. 30 hour OSHA training, SWPPP training, &
CPR training. EMPLOYMENT EXPERIENCE ID Consulting Solutions – Seattle
WA, Boise ID, Tucson AZ: 7/9/12 to Present – OSP Engineer: Utility pole
surveys for Kitsap County PUD, Kitsap WA. Design fiber optic route (OSP) in
public ROW for Zayo Fiber Solutions project for the Tucson Unified School
District. Design fiber optic route design in public ROW for Zayo Fiber
Solutions for Verizon & ATT cell sites in greater Seattle WA area &
Tucson AZ. ITC Services Group, Inc. – Bishop
CA: 9/7/11 to 7/6/12 – Assistant to Praxis Associates OSP Engineer &
Construction Managers: Assist Engineering Manager in the design of fiber
optic backbone and distribution routes. Assist Construction Project Manager
in the construction for fiber optic network from Reno NV to Barstow CA.
(Digital 395 Project). ITC Services Group, Inc. – Seattle
WA: 6/21/10 to 8/19/11 – OSP Engineer & Construction Manager: Design
fiber to the cell pathways from ROW to AT&T cell site locations. Manage
construction of ATT cell site upgrade. ID Consulting Solutions – Stayton
OR: 8/31/09 to 11/13/09 – OSP Engineer: Designed laterals from Stayton Co-Op
Telephone Company network to all service locations for FTTP Project. ITC Services Group, Inc. -
Gardena CA: 4/23/07 to 8/31/08 - Project Manager: Under the supervision of
AT&T Contract Admin Dept, Managed AT&T Lightspeed construction
projects in the LA South Cities area. Wrote scopes of work and sent contracts
out to various contracting companies for bid. Accepted and awarded bids.
Coordinated multiple projects and evaluated their status. Reviewed material
shipping and receiving dates and making adjustments as needed to meet project
goals.
1 of 3 Brad
Bowman
Teksystems Inc. -
Camarillo CA: 03/27/06 to 4/20/07 - Audit Specialist: Under the supervision
of Verizon FTTP Contract Admin Dept, audited the invoicing of Verizon
contracting companies as compared to what was completed in the field. QIS Inc. - Yakima WA:
02/25/05 to 10/31/05 - Lead Inspector for the construction of underground
conduit structure. Performed inspection of customer
installations to meet construction
standards.
T-Staff, Inc. – San
Francisco bay area: Feb 2003 to June 2003 – Construction Inspector. XO Communications –
Fremont CA: 02/02/98 to 01/31/03 – Construction Supervisor/San Francisco Market:
Duties included but not limited to construction contract administration and
technical expertise to ensure the work of contractors in the field was
performed in compliance with contract documents and applicable to local,
state, and federal laws; prepared progress payments, monitored work progress,
verified time
worked and materials used,
resolved disputes with contractors; initiated contract change order documentation; prepared and
maintained job site records and progress reports; finalized
job site readiness; consulting with customers, construction field forces and
coordinating material and equipment staging and/or delivery to meet project
start work dates; informed
the Engineer/Project Manager on construction progress; reviewed and monitored construction techniques
for technical adequacy; consulting with planning
staff, as needed or requested, to ensure design and materials meet project
goals; participated in acceptance tests; ensured compliance with all
permit processing and interfaced with appropriate agencies; coordinated and
interfaced with other company departments; enforced job site safety and
compliance with Cal-OSHA requirements; maintained good relationships with
contractors and outside agencies while representing the companies’ interest;
provided lead direction and training to lower level staff including contract
inspectors; supervised as many as 6 inspectors and as many as 10 construction
crews at one time; helped facilitate the acquisition of permits;
redesigned flawed construction drawings to help facilitate the completion of
projects; estimated the budget and costs of projects; put together scopes of
work so that contracts could go out to bid. Brooks Communications Company
– Sunnyvale CA: 1996 to 1998 – Construction Inspector: Duties included the
inspection of the construction of a fiber optic network in the San Francisco
bay area. Insured that contractors applied G.O. 95
and G.O. 128 standards, and that their construction methods included safe
work practices MCI WorldCom – Portland
OR: 1995 to 1996 – Construction Inspector: Duties included the supervision,
inspection, and the assistance in the right of way and permitting of the
construction of a fiber optic network.
2 of 3 Brad Bowman Various contracting companies
– Northern California: 1994 to 1995 – Independent copper splicer, termination
technician, and equipment installer for various contracting companies. Irish Communications – Sacramento
CA: 1990 to 1994 – Project Supervisor: Duties included the supervision of the
installation of 14 Rolm switches at 3 node sites at the Cottle Rd IBM campus
in San Jose, California; project supervision included the toning and testing,
installation, and cross connecting of over 12,000 voice and data lines in 44 single and multi-tenant
buildings; the cut over of 8,000 voice and data lines from Pac Bell to Rolm
switching; copper cable splicing and the termination of copper cable for
various other job sites. Hood Communications –
Sacramento CA: 1986 to 1990 – truck driver; inside cable puller; outside
cable puller; copper cable splicing and terminations. Education Elko High School, Elko Nevada:
1977 – 1981 Summery In my tenure with XO
Communications and Brooks Fiber Company, I oversaw the construction of over
300 miles of underground conduit systems and 500 building entrances for the
placement of fiber optic cabling and equipment. This construction took place
in over 24 cities. I have also designed underground conduit systems and
building entrances. The XO project took 5 years and
over 33 million dollars to complete. I was involved in all aspects of this
project, from conceptual design to public works sign off. I am an enthusiastic, motivated,
self-starter who is able to work independently or as a team leader to
accomplish job goals. I am goal oriented with an emphasis on quality and
performance. References given upon request.
3 of 3 |
|
|
||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|