From: route@monster.com
Sent: Friday, September 11, 2015 7:39 PM
To: hg@apeironinc.com
Subject: Please review this candidate for: Outside Plant Engineer
This resume has been forwarded to
you at the request of Monster User xapeix03
|
|||||||
|
|||||||
|
|
|
||||||
|
||||||
|
Vicki Perry vicki_perry@live.com 425.350.0086 Project
Manager Tesinc. LLC Windstream Communications Knoxville, IA April 2011-
Current Employer ·
Responsible for the supervision of all Resident
Engineers, Construction Inspectors and all Construction of a 435 mile fiber
build, to include placement of 125 DSL sites. Preparing all 515 contracts,
working with both the 397 contracts and the 217 contracts. Approving
all invoicing for construction payments. Preparing close out packages
for Windstream to obtain payment including all change orders, fiber test
results all redlines and photos of all cabinets placed at each site. Worked
closely with both Calix and Adtran reps to assure compliance of contracts and
cut over procedures were followed per Windstream Comm’s specs . Proficient in
RUS unit coding. Sr. OSP
Engineer Kenton Group Frontier Comm Feb.
2011-April 2011 ·
Engineered Broadband Expansion in the Chicago
area to upgrade the HSI to rural exchanges. Preformed RT look ups, Loop
Make ups, and Fiber Panel audits at the C.O. Sr. OSP
Engineer/Project Manager Tek Systems MP Nexlevel Zayo
Broadband 7/19/2010-10/30/2010 ·
Direct supervision of all Engineers responsible
for staking Feeder route and laterals to Cell sites .Both UG and Aerial
design. Obtaining R.O.W information. Meeting with local utility companies,
following all requirements set forth by all municipalities involved.
Preparing and submitting all permit applications and drawings .Supervised
staking crew and provided all training to new employees. OSP Engineer 1/2008-7/2009 ATCO
Communications Snohomish, WA. ·
Responsible for the layout and design for FOC (
Fiberoptic Cable) and conduit placement throughout the Seattle/Everett Wa.
Metro area. As well as the Portland , OR metropolitan area. Engineering both
Feeder and Distribution routes. ·
Engineering FTTP, MDU, MTU, utilizing both
existing aerial and UG plant for fiber placement. ·
Direct responsibility for QC of all hand drawn
and CAD work orders prior submittal to customer. ·
Designed R.O.W permit drawings for both
local, state and government bodies. ·
Engineered fiber routes using existing Copper
cable UG and Aerial plant. Researched AAIS verifying Copper Cable sizes
and pairs to units. OSP Engineer 1/2007-1/2008 Fujitsu
Consulting Everett, WA. ·
Designed and prepared work orders for FTTP, from
C.O. to FDH. From FDH to MDU/MTU. ·
Both Feeder and Distribution routes. ·
Created R.O.W permit drawings for local and stae government
bodies, as well as R.R. ·
Preformed walk outs with customer for FDH
placement. OSP Engineer/
Construction Inspector 9/2006-12/2006 ATCO
Communications Portland, OR ·
Direct supervision of contract vendors for of
M.H, HH, and conduit, as well as FOC placement to MDU’s in the greater
Portland OR. Area via Directional Bore, trenching and Aerial placement. ·
Provided all Bill of Materials to Splicing crews
and ensured all DB Loss testing was completed. ·
Ensured contract and environmental
compliance daily. OSP Engineer 8/2005-9/2006 Cendera/Fujitsu
Consulting Everett, WA. ·
Trained fielders to perform walk
downs and perform R/L assessments and provide field notes to OSP
Engineers for new FOC network to be designed . ·
Engineered and designed hand draw3n work
orders to place conduit, HH, FP, for FTTP. OSP Engineer 9/2004-12/2004 Bechtel
Telecommunications Portland OR
Project. ·
Preformed walk downs as well as fielding to
collect data for FOC placement in within existing conduit systems. ·
Prepared layout and design for placement of
FTTP, to single family uits. Skills: ·
Proficient in Microsoft Word, Excell, Works. ·
Daily use of ICGS, IDDS, AAIS, VPN, V-BUILD,
VIPERS, MICRO STATION, DB LOSS, HUB COUNT GENERATOR, PRICE POINTS, PALS,
TAPER TOOL, BDMS. |
|
|
||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Languages: |
Languages |
Proficiency Level |
|
English |
Fluent |
|
|
|