From: route@monster.com
Sent: Friday, September 11, 2015 7:39 PM
To: hg@apeironinc.com
Subject: Please review this candidate for: Outside Plant Engineer
This resume has been forwarded to
you at the request of Monster User xapeix03
|
|||||||
|
|||||||
|
|
|
||||||
|
||||||
|
James H.
Bellar
seal0810@aol.com
406-544-5050 Seeking position as LTE Construction/ Field
Manager with a National Carrier in the Western Market area. Work Experience
Vinculums/Sprint
May
2012 – July 2012
Samsung Sprint Network Vision Project
Field manager/ OSP Site Audit Engineer Make specific construction recommendations
for Alternate Access Vendor (AAV), Drawings & Digital
Photographs, analysis of NIU, NID, Fiber Optic ONT and or Microwave backhaul
equipment. Catalog AC Panel and AC Service upgrade requirements. Organize and
prepare data sketches and photos into MS Power point presentation. Attend daily
planning meetings, update trackers/reports. Goodman
Networks
Oct. 2008 - Apr.
2011
PNW AT&T Turf 1st/2nd Carrier Construction
Manager II / Wireless Field Manager Managed scheduling, oversight and materials management of UMTS 1st, 2’nd carrier, new build and MODs for
Lucent/Nokia UMTS and Argus TE4x series power/battery cabinets on AT&T
projects in Wash., Alaska, & Oregon. Interpret Midtronics tests and data
to verify load capacity/requirements for BBU. Audit/scrub RFDSs, perform
battery and DC Power audits, create OOMs/ Bill of materials, develop
MOP/Scope of Work, interpret & redline Final Construction Drawings,
schedule & attend pre-construction A&E walks, safety & QA audits
w/ ASPs. Revise Purchase Orders and JCNs. Performed FTTC audits, managed T1
adds to existing sites, coordinate trouble ticket and vendor scheduling.
Order and track equipment, manage logistics and scheduling shortfalls. Excellent
ability in the use of MS Excel,Word,Powerpoint, MS Project for daily trackers
in construction monitoring. Working under tight schedules and extremely
flexible, resourceful. OSHA 30 hour Safety.
General
Dynamics/TAD – Seattle,
WA
Oct. 2006 – May
2007 Construction
Field Supervisor Responsibilities include, reviewing scopes
of work, compiling close-out pkg. info,redlining
Construction Drawings, auditing RFDSs, T1 and electrical info. ASPs
/sub-contractor quality & safety management on Cingular UMTS project. Wireless
Facilities Inc. – Seattle,
WA
Apr. 2005 – Aug.
2006 Installation
& Commissioning Field Tech II AllTel
- Western Wireless MT,
WY, ID, WA, CA Responsibilities included disassembly and
coordinated removal of Ericcson 2100/2200 series BTS. Installation of E-911
equipment to include True Position LMU, Antennas, Carrier Access DSU, and
related cabling. Wiring of power for equipment, jumpers, turn-up of equipment
and terminate/ troubleshooting T-1 circuits. Installation of Nortel CDMA, GSM
S8000/12000 indoor/outdoor BTS, Lucent CDMA 3.0/4.0 ModCell, TDMA Autoplex
series 11M, Flexent RFU/BBU. Install ATT lineage 2000, Marconi, Argus,
Emerson -48/+24 volt power plants, Lorraine breaker panels, inplement RF designs
and share kits. Andrews/Commscope, perform antenna sweeps with Anritsu
Site-master.
Resource Consultants, Inc. – San Diego,
CA
Jan. 2004 – Apr. 2005 Fiber
Optic/ Copper Field Technician Responsibilities included installation of
transformers, power panels, breaker panels, electrical wiring onboard large
naval vessels in excess of 300 ft. Upgrade Gigabit LAN systems according to
NAVSEA specs. Installed CAT5/6 Hi-Pair copper , Multi-mode Fiber-optic
systems and terminated ST/ SC Epoxy Hotmelts and Anaerobic connectors.
Tested and certified ISP twisted pair and fiber backbone for Fault and LOS.
Single/Mass Fusion splicing ribbon fiber, Verizon FTTP Project. TekSystems
/ AT&T,
Verizon
May 2000 – Jan.
2004 Lead
Technician, Field Installer CA,
MT, WA Responsibilities included Lead Technician
in charge of 5 -2 man install teams 150 AT&T NORTEL/TDMA sites installed
and commissioned. Coordinated with Project Manager for scheduling and
integration. Installation of Nortel CDMA Metrocell BTS.
24/48 volt converter shelves, 800/1900 Mhz FRM, GPS, BIX alarms, jumpers and
sweeps. Nortel TDMA Macro/Urban BTS, cabling/alarm
punch down. Set ACU alarm points, power on amplifiers. Ladder racks,
EQB, trouble tickets/ upgrades / radio adds. Blueprints and schematics. Professional
National
Comm. Training Center – San
Diego
Oct. 2003 Fiber
Optic Association Certification, 200+ hrs. intensive training, CAT 3 / 6,
testing, ISP/OSP, cabling, testing, Fujikura fiber-optic fusion splicing,
Fluke 2000.
|
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Languages: |
Languages |
Proficiency Level |
|
English |
Fluent |
|
|
|