From:                              route@monster.com

Sent:                               Friday, September 11, 2015 7:39 PM

To:                                   hg@apeironinc.com

Subject:                          Please review this candidate for: Outside Plant Engineer

 

This resume has been forwarded to you at the request of Monster User xapeix03

James Bellar 

Last updated:  05/07/15

Job Title:  no specified

Company:  no specified

Rating:  Not Rated

Screening score:  no specified

Status:  Resume Received

109-A O'brien Terrace
Bigfork, MT  59911
US

Mobile: 406-544-5050   
seal0810@aol.com
Contact Preference:  Telephone

Quick View Links:

Resume Section

Summary Section

 

 

RESUME

  

Resume Headline: James Bellar - Construction Manager

Resume Value: wmjz4skfcvfeybwi   

  

 

­ ­­James H. Bellar              seal0810@aol.com

              406-544-5050

 

Seeking position as LTE Construction/ Field Manager with a National Carrier in the Western Market area.

 

Work Experience

                                                                         

        Vinculums/Sprint                                                                           May 2012 – July 2012

          Samsung Sprint Network Vision Project

        Field manager/ OSP Site Audit Engineer

  

Make specific construction recommendations for Alternate Access Vendor (AAV),   Drawings & Digital Photographs, analysis of NIU, NID, Fiber Optic ONT and or Microwave backhaul equipment. Catalog AC Panel and AC Service upgrade requirements. Organize and prepare data sketches and photos into MS Power point presentation. Attend daily planning meetings, update trackers/reports.

 

 

Goodman Networks                                                 Oct. 2008 - Apr. 2011                            PNW AT&T Turf  1st/2nd Carrier

Construction Manager II / Wireless Field Manager

Managed scheduling, oversight and materials management of UMTS 1st, 2’nd        carrier, new build and MODs for Lucent/Nokia UMTS and Argus TE4x series power/battery cabinets on AT&T projects in Wash., Alaska, & Oregon. Interpret Midtronics tests and data to verify load capacity/requirements for BBU. Audit/scrub RFDSs, perform battery and DC Power audits, create OOMs/ Bill of materials, develop MOP/Scope of Work, interpret & redline Final Construction Drawings, schedule & attend pre-construction A&E walks, safety & QA audits w/ ASPs. Revise Purchase Orders and JCNs. Performed FTTC audits, managed T1 adds to existing sites, coordinate trouble ticket and vendor scheduling. Order and track equipment, manage logistics and scheduling shortfalls. Excellent ability in the use of MS Excel,Word,Powerpoint, MS Project for daily trackers in construction monitoring. Working under tight schedules and extremely flexible, resourceful. OSHA 30 hour Safety.

 

 

General Dynamics/TAD – Seattle, WA              Oct. 2006 – May 2007

Construction Field Supervisor

 

Responsibilities include, reviewing scopes of work, compiling close-out pkg.      info,redlining Construction Drawings, auditing RFDSs, T1 and electrical info. ASPs /sub-contractor quality & safety management on Cingular UMTS project.

 

 

 

 

 

 

Wireless Facilities Inc. – Seattle, WA              Apr. 2005 – Aug. 2006

Installation & Commissioning Field Tech II

AllTel - Western Wireless

MT, WY, ID, WA, CA

 

Responsibilities included disassembly and coordinated removal of Ericcson 2100/2200 series BTS. Installation of E-911 equipment to include True Position LMU, Antennas, Carrier Access DSU, and related cabling. Wiring of power for equipment, jumpers, turn-up of equipment and terminate/ troubleshooting T-1 circuits. Installation of Nortel CDMA, GSM S8000/12000 indoor/outdoor BTS, Lucent CDMA 3.0/4.0 ModCell, TDMA Autoplex series 11M, Flexent RFU/BBU. Install ATT lineage 2000, Marconi, Argus, Emerson -48/+24 volt power plants, Lorraine breaker panels, inplement RF designs and share kits. Andrews/Commscope, perform antenna sweeps with Anritsu Site-master. 

 

     

        Resource Consultants, Inc. – San Diego, CA              Jan. 2004 – Apr. 2005

Fiber Optic/ Copper Field Technician

Responsibilities included installation of transformers, power panels, breaker panels, electrical wiring onboard large naval vessels in excess of 300 ft. Upgrade Gigabit LAN systems according to NAVSEA specs. Installed CAT5/6 Hi-Pair copper , Multi-mode Fiber-optic systems and terminated ST/ SC Epoxy Hotmelts and Anaerobic  connectors. Tested and certified ISP twisted pair and fiber backbone for Fault and LOS. Single/Mass Fusion splicing ribbon fiber, Verizon FTTP Project.

 

 

TekSystems / AT&T, Verizon              May 2000 – Jan. 2004

Lead Technician, Field Installer

CA, MT, WA

Responsibilities included Lead Technician in charge of 5 -2 man install teams 150 AT&T NORTEL/TDMA sites installed and commissioned. Coordinated with Project Manager for scheduling and integration.

Installation of Nortel CDMA Metrocell BTS. 24/48 volt converter shelves, 800/1900 Mhz FRM, GPS, BIX alarms, jumpers and sweeps.

Nortel TDMA Macro/Urban BTS, cabling/alarm punch down.  Set ACU alarm points, power on amplifiers. Ladder racks, EQB, trouble tickets/ upgrades / radio adds. Blueprints and schematics.

 

Professional               

National Comm. Training Center – San Diego                            Oct. 2003

Fiber Optic Association Certification, 200+ hrs. intensive training, CAT 3 / 6, testing, ISP/OSP, cabling, testing, Fujikura fiber-optic fusion splicing, Fluke 2000.

               

 



Additional Info

BACK TO TOP

 

Current Career Level:

Manager (Manager/Supervisor of Staff)

Years of relevant work experience:

2+ to 5 Years

Date of Availability:

3/15/2005

Work Status:

US - I am authorized to work in this country for any employer.

Active Security Clearance:

Inactive Clearance

US Military Service:

Yes

 

 

Target Company:

Company Size:

 

Target Locations:

Selected Locations:

US-MT-Western/Missoula

Relocate:

No

Willingness to travel:

Up to 100%

 

Languages:

Languages

Proficiency Level

English

Fluent