From:                              route@monster.com

Sent:                               Friday, September 11, 2015 7:39 PM

To:                                   hg@apeironinc.com

Subject:                          Please review this candidate for: Outside Plant Engineer

 

This resume has been forwarded to you at the request of Monster User xapeix03

Steve Agner 

Last updated:  05/03/13

Job Title:  no specified

Company:  no specified

Rating:  Not Rated

Screening score:  no specified

Status:  Resume Received


Auburndale, FL  33823
US

Quick View Links:

Resume Section

Summary Section

 

 

RESUME

  

Resume Headline: Steve Agner

Resume Value: fyv8gjbhbe7x33zi   

  

 

  STEPHEN C. AGNER

137 White Cliff Blvd.
Auburndale, Fl. 33823

                                                                                       Home Phone: (863)701-5312
                                                                                               mailto:duext1@yahoo.com

 

 

CURRENT               Currently employed as a contractor performing OSP survey functions

OUTLOOK                 for 4G LTE equipment placement and FTTSC applications.

 

10/12 – PRESENT              Linderlake                                                                                                Pittsburgh, Pa.

                               OSP SURVEYOR

                               ●  Helped to develop a business plan for Fiber growth at existing cell locations.                                         

                              ●              Teamed up with vendors to determine best path for growth FTTSC, FTTN and FTTP.

                               ●              Helped to maintain survey/photo database using as built drawings and site walk visits.             

                                                     Obtained Powered Industrial Truck/Fork Lift Operator Certification.

 

    4/04 – 10/12                     Verizon Wireless                                                                                                  Auburndale, Fl.

                                                FIELD TECHNICIAN

                                                     ●  Coordinated with others in the timely implementation of 4G equipment including

                                                     PIM testing of sites.

                               ●  Worked with engineers and contractors in installing in building DAS systems.

                                                ●              Familiar with Anritsu site master test set and other sweep gear.

                               ●              Worked with management to properly sure work orders were completed, fuel

                                                     deliveries were made and that tower crews had all work documents needed.

 

    3/02 – 4/04              Teksystems                                                                                                   Orlando, Fl.
                                                                                                                                                                                           Jacksonville, Fl. 

                                                    FIELD ENGINEER

                                                    ●   Baseline driver for the Orlando Verizon Wireless market.

                                                    ●   Performed cluster testing and pre vs. post analysis  of equipment swapouts and new site       

                                                   additions.

   8/01 -  2/02                         O2 Wireless Solutions                                                                                                    Charlotte, NC.

                                                    SENIOR FIELD ENGINEER

                                             ●   Installing and testing cat5 and cat3 cables in AT&T switch room environments Including T1 cabling.

                                      ●  T1 testing of all installed circuits from main office side and field side of each Circuit.

                                       ●  Retrofit and new installation of cable ladder racks in AT&T switch rooms to facilitate the 

                                            3G development project.

   1/00 – 5/01                      Metricom                                                                                                                              Pompano Beach, Fl.                                                                          

                                                   LEAD FIELD SERVICE ENGINEER

                                           ●  Directly involved in the buildout of Metricom's Category III NIF in the Miami market which

                                                involved reading from As-Build drawings to determine proper bay rack alignment and cable tray

                                                installation, installation locations for The Cisco and Cabletron routing/switching equipment, and

                                                proper routing of all power, ground and data cable runs.

                                              ●  Assisted in the implementation of proper grounding, circuit provisioning, and overall market RF

                                                   coverage.

                                        ●  Coordinated efforts with Bell South for local market testing and acceptance Of Ti's, and 

                                             fractionalized DS3's for both switch and field equipment locations.

    5/99 – 1/00                       Bravo Cellular                                                                              Salisbury, NC.

                                                   SYSTEM ENGINEER

                                           ●  Utilized the T-BERD T1 TESTER and related equipment troubleshooting T1 circuits

                                                on existing sites while expanding the market with the addition of new circuits

                                              designated for the new expansion sites.

                                            ●   Performed routine site maintenance on 10-channel analog and 9600SAS equipment                    

                                                  in the field including the monitoring and troubleshooting of all site alarms from the

                                                  EMX5000 switch.

                                          ●  Involved in turnkey installation of analog cell sites for system expansion.

 

    11/97 – 5/99                     Motorola                                                            Charlotte, NC.

                               FIELD ENGINEER

                                       ●   Installed, commissioned and maintained SC614T Base Site   

                                           equipment In the buildout of Sprint's CDMA PCS market.

                                          ●  Coordinated efforts with install contractors in the building of the Charlotte Sprint  

                                               PCS  switch center using As-Build construction drawings to determine correct bay

                                               locations and proper installation of all overhead cable trays in a multi-tiered layout

                                               scheme to accommodate proper separation for power, ground and data cable runs.

 

    1/95 – 8/97                     Technology Project Services                                                          Aden, Yemen

                         Aerotek                                                             Buffalo, NY.

                        Systems and Software, Inc.                                                         Jakarta, Indonesia

                                              Shanghai, China

                                              Bangkok, Thailand         

                                              Tel Aviv, Israel

                                FIELD ENGINEERING CONTRACTOR

                                        ●   Installed and optimized analog and digital Motorola equipment 

                                             including cluster drive testing and system performance analysis.

                                      ●  Assisted winning team on TCS (Total Customer Satisfaction) project in Indonesia.

 

    11/93 - 1/95                  Bell Atlantic Mobile                                                                                                  Charlotte, NC.

    3/92 - 11/93                                                                                                                                                                     Phoenix, AZ.  

                                        LEAD FIELD TECHNICIAN

                                      ●  Operated as Lead technician while coordinating maintenance and 

                                           system expansion efforts with the other field engineers.

                                         ●   Combined efforts with Bell Atlantic's NOC facility on testing and  

                                               acceptance efforts of new T1 spans to all expansion sites as well as

                                               troubleshooting system outages as they occur.

 

 

CAREER TRAINING

AND DEVELOPMENT         

  

    2/13                                          Powered Industrial Truck/Fork Lift Operator Certification                                             

    5/12                                        ●  Notary Public – State Of Florida  Commission  # EE 199975

    4/00 – 5/00                         METRICOM

                                         ●   WAP construction guidelines

                                          ●   Metricom system overview/orientation

    3/93 - 1/98                           MOTOROLA

                                          ●  SC4850 CDMA,CBSC Operations, SC9600 System Administration & Operation 

                                             (CBSC), Unix Operations and Shell Programming, SC614, CDMA Call Processing

                                             IS-95    Implementation & Operation and  PCS Technical Overview, SC9600 SAS &    

                                             CDMA, 20-Channel LPA, N.A.M.P.S. 10-Channel Rack Conversion, HDII Cell Maintenance.

    9/86 - 9/87                           US NAVY

                                      ●  Nuclear Power School, Electronics Technician Nuclear Field "A"

 

 

ACHEIVEMENTS

AND AWARDS                     ●   Congratulatory winning Motorola Total Customer Satisfaction (TCS) team plaque.

                                         ●   National Defense Service Medal and Good Conduct Medal US Navy.



Additional Info

BACK TO TOP

 

Current Career Level:

Experienced (Non-Manager)

Work Status:

US - I am authorized to work in this country for any employer.

 

 

Target Company:

Company Size:

 

Target Locations:

Selected Locations:

US-FL-Orlando