From: route@monster.com
Sent: Friday, September 11, 2015 7:55 PM
To: hg@apeironinc.com
Subject: Please review this candidate for: Outside Plant Engineer
This resume has been forwarded to
you at the request of Monster User xapeix03
|
|||||||
|
|||||||
|
|
|
||||||
|
||||||
|
James
C. Weber 9
Cygnet Drive Apt #3 Carson
City, Nevada 89706 Cellular
(727) 278-0577 Jamcber1@aol.com PROFILE
I have over 30 Years Outside Plant Engineering and Construction
Experience in the Utility Field. I have worked as an Outside Plant Engineer, Network
Project Manager, Public Works Roadway Design Engineer, Fiber Optical
Engineer, Construction Site Manager, and Inspector.
WORK HISTORY June
2012 – August 2013 KCI PUBLIC WORKS ROADWAY DESIGN ENGINEER TAMPA,
FLORIDA I
designed and engineered Plan and Profile Drawings for KCI Engineering Public
Works Department in Hillsborough, Pinellas and Pasco County to build new
underground conduit and manhole systems for road widening or utility work
projects within the State or County right-of-way, for Number 1 Client
Verizon. I worked with both Copper and Fiber Optic Cables. I am familiar with
Copper Applications, Loading, X-Boxes, and Pair gain Devices, including FTTP
Applications, FTTP Feeder & Distribution Hubs. I did field investigations,
prepared City-State-County Permits, and invoicing for payment. I attended DOT
Utility Meetings and Utility Coordination Meetings, worked with Utility
Companies, Construction Contractors, Engineers, and Crews. I'm experienced in
Plans Reading and resolving conflicts associated with field conditions. I
laid out plans for red/green/brown design for proposed projects, and
completed required paper work. I have taken and passed the DOT Plans Reading
Course and have worked in both Metric and US Measurement projects. I have
worked on Roadway Projects in Pinellas, Pasco, Hillsborough, Sarasota,
Manatee, Polk, and Venice County. January
2011 – April 2012 OPTICA ENGINEERING, OPTICA NETWORK TECHNOLOGIES (ONT) OUTSIDE
PLANT FIBER ENGINEER AND STAFF SUPPORT ENGINEER CARSON CITY, NEVADA I
was working as an Outside Plant Fiber Engineer and Staff Support Engineer for
a 30 Million Dollar Federally Funded Stimulus Project for the State of Nevada
in Carson City, Nevada. Engineering a Fiber Optic Cable Network Ring
throughout the State of Nevada for the Nevada Hospital Association, (NHA),
e-Care and Pinpoint Communications. This project was funded by the United
States Stimulus Recovery Act, (20 million) and is in Partnership with Optica
Network Technologies, Pinpoint Communications, (10 million) e-Care, Nevada
Hospital Association, The Broadband Group, Nevada Energy, and the Department
of Transportation. I
worked with the Bureau of Land Management, (BLM), the Bureau of Indian
Affairs (BIA), Nevada Department of Transportation, (NDOT), and California
Broadband Cooperation (CBC). I
compiled an extensive list of potential customers “Community Anchor
Institutes”, (CAI) for future connection to proposed fiber ring, throughout
the State of Nevada. I
obtained over 38, City, County, State, and Railroad Permit Forms and Contact
List for submitting Permits and Encroachment paper work required for Approval
to start Construction in Nevada. I
have compiled hundreds of miles of Power Pole information for NV Energy, from
Distribution, Transmission, and Long Haul Transmission, “H” poles in the
Reno, Carson City, Silver Springs, Yerington, and Gardnerville, including
Poles on Indian Reservations. I
looked at thousands of poles for attaching proposed fiber and determining
what make-ready would be required. Obtained pole circumference, class,
height, type, utilities attached, and their position, type of power,
transmission/distribution, their height, and spacing requirements from
power. I
used Garmin and Trimble GeoXT Global Positioning System (GPS) and Global
Navigation Satellite System (GNSS), to log Longitude & Latitude, and
Elevation Data, and all data above into hand held device so data could be
downloaded into AutoCAD. We used Laser Range Finders for distance to next
pole, and to shot height of all utilities attached to the poles. We used
LIDAR to provide a 3D image of objects like poles, wire, cables,
rocks, terrain, and cable sag, for designing pull spans over 1,000’ long for
use on upload of electronic construction drawings. May
2010 AT&T OUTSIDE PLANT ENGINEER NATIONAL DISASTER RELEIF
NASHVILLE, TENNESSEE 2010
Nashville, Tennessee and surrounding Flood area. Nashville, Tennessee
and the surrounding area, was declared a State Emergency, when Flood water
from 19” inches of rain fell and the water crested at 51’ feet in the
surrounding downtown Nashville and rural Tennessee areas. I
was one of 15 engineers ask to come in and help AT&T after Nashville was
declared a State Emergency to survey cable routes to determine if water
damage had occurred to AT&T’s paper and pic buried telephone cables. I
designed replacement packages and costs to replace damaged buried and aerial
cables. I
was the only engineer out of the 15engineers that was ask to stay on with
AT&T in Nashville after the relief group work was completed. February
- May 2010 VERIZON OUTSIDE PLANT ENGINEERING SPECIAL PROJECT TAMPA,
FLORIDA Three
month Special Project for Hillsborough County School System to complete and
release 329 work orders within 60 days. I logged, priced, and released 300
work order packages to scheduling and construction. I tracked and managed
Fiber Outside Plant Work Orders in the Tampa and Hillsborough Area to provide
two fibers to every school in Hillsborough County for Verizon. September
2007 – February 2010 VERIZON PUBLIC WORKS ROADWAY DESIGN ENGINEER
CLEARWATER & SARASOTA, FLORIDA I
designed and engineered Plan and Profile Drawings for Verizon’s Road
Construction Department in Pinellas and Pasco County to build new underground
conduit and manhole systems due to road widening or utility work within the
State or County right-of-way. I did field investigations, prepared
City-State-County Permits, and invoicing for payment. I attended DOT Utility
Meetings and Utility Coordination Meetings, worked with Utility Companies,
Construction Contractors, Engineers, and Crews. I'm experienced in Plans
Reading and resolving conflicts associated with field conditions. I laid out
plans for red/green/brown design for proposed projects, and completed
required paper work. I was the Engineer of Contact for the State Road #54
Project in Pasco County and various FDOT and County Projects in Pinellas County.
I have taken and passed the DOT Plans Reading Course and have worked in both
Metric and US Measurement projects. I have worked on Roadway Projects in
Pinellas, Pasco, Hillsborough, Sarasota, Manatee, Polk, and Venice County. March
2005 – August 2007 PROGRESSIVE COMMUNICATION SYSTEM FTTP
(FIBER TO THE PREMISES) FEEDER DESIGN ENGINEERING TAMPA/BRANDON, FLORIDA Worked
as a Staff Support Engineer in the PCS Satellite Office in Brandon/Tampa,
Florida. PCS
has an off premises office to support the engineering and drafting functions
for the area. I quality checked and corrected work order packages that were
ready for submittal to Verizon. After approval I corrected errors found by
Verizon Drafting Department during posting and drafting of construction prints.
I also engineered and designed work order Revisions requested by Verizon. Prior
to support staff position I designed and engineered FTTP (Fiber To The
Premises) Outside Plant Distribution and Feeder Fiber Construction Projects.
I designed and engineered Drawings for Verizon’s Construction Department to
build new underground conduit and fiber system to upgrade to the new fiber
infrastructure. This included the placement of fiber cable, fiber terminals,
FDH (Fiber Distribution Hubs) to provide telephone service, cable television,
and high-speed data, for single and multi-family units, and business. I
obtained and coordinated permits with local utilities and municipalities. I
did field investigations, prepared City-State-County Permits, and invoicing
for payment. VERIZON
FTTP (FIBER TO THE PREMISES) OUTSIDE PLANT ENGINEERING TEMPLE TERRACE,
FLORIDA I
engineered and managed Copper and Fiber Outside Plant Construction Projects
in the Tampa Area for Verizon. I designed and engineered Drawings for
Verizon’s Construction Department to build new underground conduit, fiber
optical, and copper cable systems to upgrade new fiber infrastructure and to
provide service to new customers and business. I supervised and managed the
construction of projects that placed fiber cable, fiber terminals, FDH (Fiber
Distribution Hubs) to provide telephone service, cable television, and
high-speed data, for single and multi-family homes. I obtained lease
agreements and permits with local utilities and municipalities, I coordinated
construction, scheduling, purchasing, and permits. Once approved I tracked
expenses and issued change orders for payment. I did field investigations,
prepared City-State-County Permits, and invoicing for payment. TAMPA
BAY ENGINEERING INC. ROADWAY DESIGN ENGINEER CLEARWATER, FLORIDA I
represented and assisted GTE's Government Project Department with Design and
Engineering of DOT Road Projects in Polk and Sarasota County, and attended
DOT Utility Meetings for GTE. I design and engineering Plan and Profile Work
Prints for GTE to be used to build new conduit, manholes, and cable systems
for relocation or removal of GTE's facilities due to road widening. I also
worked with Utility Construction, and Engineering Companies to coordinate and
resolve construction problems. I was the Engineer of Contact for the State
Road #70 Project in Venice and Sarasota County. I was the Engineer of Contact
for the Polk County Bypass Expressway in Polk County. AT&T
REGIONAL SITE PROJECT MANAGER JACKSONVILLE & KEY WEST, FLORIDA Managed
Outside Plant Construction Projects in various cities in Florida and Georgia.
I supervised and managed a 15 Million-Dollar Project with the United States
Navy, Marines Corp. and Coast Guard to provide In-Room Telephone Service for
the Bachelor Officers and Bachelor Enlisted Men's Quarters (On base housing).
I successfully cut over 7 Navy Base and Naval Air Stations in Florida below
budget and ahead of schedule, in less than one (1) year to provide telephone
service to 5,000 Navy personal. I hired company approved Contractors for
Engineering, Outside Plant Construction, and Crews for Inside Wiring.
Construction Manager reported to me and I coordinated all construction,
scheduling, purchasing, permits, and government approvals with the US Navy
for a complete turn key project to AT&T. INTERMEDIA
COMMUNICATIONS NETWORK PROJECT MANAGER OSP TAMPA, FLORIDA Managed
Outside Plant Construction Projects in various cities in the United State I
supervised and managed a 2 Million-Dollar Project to place 22 miles of fiber
optical cable (fiber ring) in Albany, NY. I managed construction projects
that placed fiber rings and fiber cable to high-rise buildings to feed switch
sites and customers. I established and submitted costs to build projects for
funding, once approved I tracked expenses and issued purchase orders and
payments. I obtained lease agreements and permits with local utilities and
municipalities. I hired Engineering and Drafting Firms, local
management firms, and Construction companies to complete projects. Also
managed projects in Washington, DC, Philadelphia, PA, Newark, NJ, New York,
NY, Baltimore, MD, and Tallahassee, FL. AT&T
OUTSIDE PLANT ENGINEERING AREA MANAGER OAHU, HAWAII Supervised
13 engineers at an Off Premise Engineering Office in Hawaii. I was
responsible for organizing and delegating workload, production, quality, and
commitment of completion dates. I tracked progress and status to meet goals
and schedules. GTE OUTSIDE PLANT ENGINEER ELKHART, INDIANA 15
years as a GTE Employee. Started out as a drafter/engineer with GTE in
Indiana. SKILLS ·
Engineer and Design Plan and Profile
Prints ·
Read and Understand Construction Prints ·
Knowledge of Buried and Aerial
Construction ·
Able to Resolving Conflicts with
Construction ·
Familiar with State, City, and County
Permitting ·
Passed DOT Plans Reading Course ·
Engineered and Inspected over 2000
Projects ·
Supervised Employees ·
Familiar with Invoicing, Billing, and
Purchase Orders COMPUTER SKILLS ·
Knowledgeable of Computers and PC's ·
Know Windows, Micro Station, Visio, and
CAD ·
Worked with Windows 7, XP, NT, 2000,
98, & 95 Systems ·
Know Excel, Power Point, MS Word,
Outlook ·
Know Project Management, & Word
Perfect ·
People Soft Billing & Invoicing
Software ·
Knowledgeable and Proficient with Verizon
Programs, ·
IDDS, ICGS, AAIS, BDMS, iVapp, Vbuild ·
Including older programs, like CPMS
& RAMS ·
Know Excel, Power Point, MS Word, Outlook ·
Know Project Management, & Word
Perfect ·
People Soft Billing & Invoicing
Software EDUCATION ·
Associate Degree in Criminal Law from
Indiana University ·
FDOT Plans Reading Course from Florida
DOT ·
Computer Classes from St. Petersburg
Jr. College ·
Architectural Design from Elkhart Adult
Education MILITARY ·
United States Army ·
Senior Draftsman / Graphic Illustrator ·
Honorable Discharge |
|
|
||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|