From: route@monster.com
Sent: Friday, September 11, 2015 7:55 PM
To: hg@apeironinc.com
Subject: Please review this candidate for: Outside Plant Engineer
This resume has been forwarded to
you at the request of Monster User xapeix03
|
|||||||
|
|||||||
|
|
|
||||||
|
||||||
Gregory D. McKinney
3909
Lily
Ct
(214) 755-5904 Mobile
McKinney,
Texas
75070
(214) 856-5793 Home E-mail:
mckinney930@gmail.com Key Accomplishments: · Exceeded AT&T’s goal for the number of cell
sites connected to the fiber Ethernet network and turned up on the 4G LTE
product in Oklahoma, Missouri, and Kansas. · Exceeded the Company’s goal for number of premises
connected to the Verizon FIOS Product each year I was a Project Manager for
the Verizon FTTP Project · Expanded the amount of copper cable available to be
removed and sold for the AT&T Cable Mining Project which enabled the
company to exceed goals for footage removed and revenue gained. · Established processes, procedures and protocol for
communication management with all vendors and municipalities during the
Verizon FTTP Project Areas of Expertise: Management: 15 years of Project Management, 25+ years
experience in Telecom and Electrical Distribution Outside Plant facility
design and installation. Budget Management. Supervision &
Construction Management. Strong oral and written
communication skills. Technical: Fiber & Copper cable design and route
selection, site surveys, permit applications, feasibility studies and cost
analysis. Wireless, Cell Site, Microwave Radio & antenna installation and
deployment, PBX and Central Office switching and trunking. Technical
skills in telephone installation, wiring, maintenance & repair. Process Knowledge: Writing technical specifications and methods
and procedures. Account management. WFA, EGIS; TIRKS, PTS,
SORD, ROME, ICGS, IDDS, RAMS, AAIS, and other AT&T and Verizon mainframe
applications. Project Management
Tools: Microsoft Office
products, Project, Excel, Word, Access, PowerPoint, Visio, Windows XP,
AutoCAD, OptiCAD. Professional Experience AT&T
/ Pinnacle Technical Resources, Dallas, TX USA
May 2010 – May 2013 Project
Manager (Contractor) Dallas,
Texas
May 2010 – May 2013
·
Led the Engineering and Construction teams for the
AT&T’s Ethernet to the Cell site project in Oklahoma, Missouri and
Kansas.
·
Coordinated with the local vendors to maintain the
schedule and roll out of the areas where the 4G LTE services were to be
implemented.
·
Held weekly meetings with the various ETTC teams and
stakeholders to ensure the schedule was properly maintained and potential
roadblocks identified and resolved.
·
Processed the required data in eCRM/ROME to insure proper
order flow for AT&T Mobility.
·
Manage various Opteman, Gigaman, and other fiber BAU
projects for AT&T Mobility and AT&T Internet Services and hold
Kick-Off meetings to begin each project and establish the schedule for
completion.
·
Provide support for the Account Team during the
infrastructure build on all of the projects I manage.
·
Managed a team responsible for Wireless Broadband
Microwave Radio installation & deployment.
·
Performed site visits and established requirements,
methods and procedures and tracked the status of the work done at the site.
Verizon
/ Kenton Group, Mulberry, FL USA
December
2008 – March 2010 Project
Manager (Contractor) Lewisville, Texas
December 2008 – March 2010
·
Led the Engineering and Construction teams for Verizon's
MDU/MTU Business Overlay Fiber To The Premise (FTTP) Project in Plano,
Carrollton, Wylie, Rowlett and Garland, Texas.
·
Responsible for Location Assessments with the MDU/MTU
property owner(s) to ensure all requirements were met for the installation of
the fiber cables on the property and in the building(s).
· Prepared cost estimates for proposed fiber overlay
installation to ensure it met budgetary requirements. · Led on-site walk-thru meetings with engineering,
construction and the property owner prior to starting work on the property. ·
Managed the engineering teams comprised of various
contract engineering firms, and approved all work order packages.
·
Acted as the liaison between Engineering, Construction,
and the property owner to resolve or remove any roadblocks to ensure the
build schedule was maintained.
AT&T
/ Realsoft Inc., Cranbury, NJ USA
November 2007 – December 2008 Project
Manager (Contractor) San Antonio,
Texas
November 2007 – December 2008
·
Led the AT&T Cable Mining Project in San Antonio,
Austin, Waco, Amarillo, Lubbock, Odessa, and Corpus Christi, Texas.
·
Established methods and procedures to ensure the security
of the AT&T network with no loss of service.
·
In charge of the evaluation of additional cable removal
opportunities throughout the state of Texas.
·
Acted as the AT&T single point of contact and
representative during all copper cable removals.
·
Managed the activities of the Central Office, Engineering,
and Construction departments to ensure all steps were completed prior to the
removal of the copper cables.
·
Provided oversight and coordinated with the vendor
AT&T utilized for the removal of copper cables, Resource Recycling
Technologies (RRT), including monthly audits to ensure all quality standards
and processes were followed.
·
Managed various Contract Engineering firms to provide RRT
the necessary workprints to facilitate the copper cable removal.
Verizon
/ TekSystems, Dallas, TX USA
February 2004 – November 2007 Project
Manager (Contractor) Coppell,
Texas
April 2005 – November 2007
·
Responsible for the Engineering and Construction for
Verizon's Residential Fiber to the Premise (FTTP) Engineering Job Orders and
Work Prints for the installation of the fiber network for Verizon's FIOS
Product in Keller, Plano, Carrollton, and Garland, Texas.
·
Managed various Consulting Engineering firms, approved
all Work Order packages, and maintained schedules with regard to release of
the Work Prints.
·
Led Kick-Off Meetings, and weekly Status Meetings,
coordinated with the various municipalities with regard to Permits, City
Regulations, and Customer Complaints.
·
Acted as liaison between Engineering and Construction to
resolve or remove any roadblocks to ensure the Build Schedule was maintained.
Network
Engineer (Contractor) Coppell, Texas
February 2004 – April 2005
· Responsible for the design of the Fiber To The
Premise (FTTP) project for Verizon Communications. This included the
preparation of the Engineering Work Orders, Work Prints, Permits, and any
other documents required for the installation of the FTTP network in a
specific Wire Center. · Gathering of field notes, meeting with the various
municipalities or other regulatory agencies to get the required permit and
installation requirements, plan for any road moves that are scheduled in the
proposed build, and coordinating with various engineering vendors to maintain
quality and schedule requirements. · Other duties included coordinating with construction
to maintain the work schedule, meeting with customers to resolve any issues,
attending weekly staff meetings to discuss scheduling and/or other issues
that occur during the build, and resolve any roadblocks that may be
encountered. SBC
/ Southwestern Bell Telephone, Dallas, TX USA
September 1996 – December 2003 Sr.
Project Manager
January 2002 – December 2003
· Managed the network upgrades for AT&T Wireless’
3G Project in the major metro area’s in the 5 state SWB territory, Verizon’s
‘B8ZS’ Project in Houston & San Antonio, and VoiceStream (now T-Mobile)
switch upgrades Oklahoma. · Responsible for multiple, multi-million dollar,
inter-exchange projects for the Wireless Account Team and assumed the role of
the Account Manager during implementation for customers in the 5-state SWB
area. · Managed the implementation of Local Number
Portability for all wireless carriers in the 5-state SWB area. · My role as project manager required coordination
with various workgroups such as the IECC, ASC CPC, Engineering, Central
Office, Trunking, Switching, Construction, as well as outside vendors, the
customers’ technicians, and other workgroups as necessary. · Communicate with various levels of upper management
through oral and written reports as to the schedule and status of projects. Project
Manager
September 2000 - December 2001
· Responsible for the Project Management of various
projects in the 13-state SBC territory for large nationwide network CLEC
customers. · Lead Kick-Off meetings, establish timelines for
completion, coordinated with various workgroups to ensure all milestones are
met and roadblocks removed, escalate and expedite as needed to meet
deadlines. · Work closely with the customer and act as the single
point of contact to meet their needs. Managed projects using the
Microsoft Office products such as Excel, Access, and others. Manager,
Outside Plant Engineering-Design
September 1997 - August 2000
· Responsible for the design of the Outside Plant for
POTS, Special Services, and Central Office facilities. · Design of the fiber cable installation for the
Broadband deployment throughout the SW Bell service area, preparing
feasibility studies, route selection, and cost analysis. · Preparation of Engineering Job Orders and Work
Prints for the installation, upgrades and/or repairs of all outside plant,
fiber and copper cable installations, Remote Terminals, CEV’s and Central
Office work for a specific geographic area. Customer
Service
Technician
September 1996 - August 1997
· Responsible for the installation and upgrade of
Residential and Business telephone service. · Install telephone wiring and jacks in both
residential and commercial locations. Greenville
Electric Utility System, Greenville,
Texas
March 1988 – September 1996
Outside
Plant
Engineer
March 1988 – September 1996
· Responsible for the design, planning, preparation of
work prints, and management of numerous electric utility Transmission and
Distribution construction projects for new subdivisions, upgrades, and
additions to the system. · Performed Right-of-Way procurement for various
Distribution and Transmission projects. · Coordinated with other utilities to perform various
pole line relocations for TXDOT highway improvements · Responsible for the pole line inspections and
replacement program · Provide technical assistance to residential and
business customers. · Establishing and maintaining equipment maintenance
procedures. · Develop and implement procedures for handling
hazardous materials according to EPA regulations. · Implementation of a geographical information system
for the inventory of all outside plant in the system. E-Systems,
Greenville,
Texas
November 1981 – March
1988
Design
Draftsman
November 1981 – March 1988 · Data Capture of wiring diagrams for the E4-B Project · Unigraphics CAD draftsman |
|
|
||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Languages: |
Languages |
Proficiency Level |
|
English |
Fluent |
|
|
|