From: route@monster.com
Sent: Wednesday, September 16, 2015 2:01 PM
To: hg@apeironinc.com
Subject: Please review this candidate for: OSP Technician
This resume has been forwarded to
you at the request of Monster User xapeix03
|
|||||||
|
|||||||
|
|
|
||||||
|
||||||
|
329 Calle Amistad Drive
Ramona, CA 92065
Phone : 858-213-1244 Email: young.ray19@gmail.com Raymond D.
Young Jr. Working Field Knowledge: · Trunk/Feeder
Coaxial cable splicer, 412 to 1” copper coaxial trunk cable, OSP and ISP. · Workstation
to IDF/MDF, Server Room complete build out, designing, building, termination
and testing to certification. · Wireless
cell sites (Sprint PCS) and microwave communications tower (Motorola) and
dish, cable, communication rack build out and splicing system. · Voice
and Data CAT 3, 25 pair to 300 pair termination, CAT5, CAT5E, CAT 6. · Fiber
termination SC, ST and LC connectors, fusion splicing single mode, multimode
72 strand fiber. · Wreck
out pulling new cable (Underground) over-lash (Aerial) · Testing
and maintenance, RF systems, correct AC powering and or trouble shooting per
schematics, design print procedures and specifications using analyzers, TDR,
OTDR, VFL and multifunction cable scanners. · Climbing
experience with utility bucket truck 28’, T-40 and 28” to 32’ span ladders,
pole steps, pole climbing with gaffs-spikes. Boom lift and scissor lift. Employment: Tel Tech Plus/T.T.P:Oct 2013- Present Telecom Tech: · San
Diego School District Bell Middle School/ NYE Elementary School Trenching new 4” conduits for back bone cables 24
strand 50 micron fiber and 25 pair analog trunk. Installed 2 new 84”
exterior locked IDF cabinets. Installed 3 interior 48” locked IDF
cabinets. Installed 2 new 7’ 2 post racks and ladder racks for MDF redesign
and expansion. Installed patch panels, wire managers, switches, aps switches.
Fiber enclosures and patch panels for 25 pair and 50 pair to MPOE.
Installed cable pathway, 2” conduit, cable raceway, j-hooks, conduit
sleeves. I installed horizontal cable (CAT6). Terminated, tested and
labeled. Network Cabling Inc. / SAIC:
Oct 2012-Sept 2013 Telecom Tech: · San
Diego International Airport C-1 contract-Turner, PCL, Flatiron: Build and
install cabinets for server room and all telecom rooms. Pulled horizontal
data and voice cables, terminated, labeled and tested. Pulled all
horizontal cable for security cameras, terminated and tested. Pulled
horizontal, single and multimode fiber for data and security applications.
terminated and tested. Installed all WAPS and AED cables and equipment.
Installed patch panels wire managers and switches and fiber equipment (LIU’S) C-2 Contract-Kiewit/Sundt: Built and
installed all equipment cabinets for Telecom rooms. Pulled all
horizontal cables for data and voice. Terminated and tested. Pulled
horizontal cable for security cameras, terminated and tested. Installed
WAPS and AED equipment. Installed patch panels, wire managers switches
and fiber LIU’S. Grounded all cabinets. Pulled single strand and
24 strand, single and multi-mode fiber EDR WAP’S and security cameras.
Terminated and tested. Advanced Communication Solutions, Inc. : Oct 10-
Oct 2012 Telecom
Technician: · Nokia
Research and Development Division: Completed server room and build out
and equipment racks, trays, managers, cable, fiber and equipment, powering
and grounding as well in all MDF and MPOE stations to closet cable installs,
including audio, video systems. MDF to server room. San Jose, CA · Westin
Hotel: Demo existing phone and data system, installing new phone, data
and IDF closets. Hotel and remodel retrofit. Termination and testing
systems. San Diego, CA · Datel
Systems: Prep, fusion splice 8/72 strand fiber optics and test for
Sprinter/Railroad. Oceanside, CA Prime Electric: July 08- Aug 09 Telecom Technician: · Cricket Wireless Corporate Office: Pull and
terminate fiber cables, CAT6, pull and terminate sound masking cables.
Place and build out equipment racks for IDF’S and server room. Test
workstations to IDF’S patch panels and terminate 100 pairs from MPOE, MDF.
San Diego, CA · UCSD Music Building: Pull and terminate
fiber, CAT6, 100 pair cables. Build out IDF’S, dress and terminate patch
panels and test systems. La Jolla, CA · UCSD
Hospital/Hillcrest: NICU (Natal Intensive Care Unit) Wreck out/ demo
old existing cables and equipment for system upgrade and retrofit, UCSD
Medical Center/Hillcrest. San Diego, CA Tek-Works: Aug 07-July 08 Telecom Technician: · UCSD
Hospital /Hillcrest: (MRI) established cable routes, install fire rated
conduit sleeves. Pull and terminate CAT6 cables for voice and
data. Dress and terminated cables in existing IDF with new patch panels
and new 110 blocks installed. Test and label for new MRI
department. PACU (Post Ambulatory Care Unit) established cable routes
for CAT6 data and CAT5 voice cables to existing telecom closet. New
construction PACU. Hillcrest, San Diego, CA · Karl
Strauss Brewery Corporate Office: Wreck out/demo old existing cables
and new retrofit of building for new customer. Established cable
routes, pull and terminate CAT6 cables, set and build equipment racks for
MDF. Test and label. San Diego, CA · Baker
and McKenzie LLC: Wreck out/demo old existing cable system for retrofit
of building for new customer. Pull and terminate fiber and CAT6
cables. Build out IDF and server rooms. Test and label cables.
Carmel Valley, CA R.Y Communications: Aug 05- Oct 07 Point of Sales Cable Technician (P.O.S) · Cable
and equipment installs and on call service technician, San Diego County,
Orange County and L.A County Simon Wong Engineering: Jan 04-Aug 05 Archive Clerk · Structural
blue prints, San Diego, CA Data Design: Mar 01-June 03 Cable Technician · Pet-co
Corporate Office: Service room expansion. San Diego, CA · Q-Tron
Industries: Factory and corporate offices system design and complete
build out. Poway, CA · Cable
installs, CAT5E Morrison and Foster LLC. San Diego, CA · Cable
installs, CAT5E and fiber install. Marine Corps Air Station, Miramar, CA Interconnect Solutions: May 00- Mar 01 Cable Technician · Pet-co
Corporate Office: Design and complete build out of new server room, cables
and equipment. San Diego, CA · Hughes
Network Systems: Established cable routes for CAT5E, fiber, install cables
and build out of IDF’S, MDF’S and server room. Termination and testing
for U.S company in Baja CA, Mexico · Maxwell
Industries: Install conduit and established cable routes for new
construction. Pull and route cables, build out IDF’S and MDF’S,
terminate cable and test complete system. · Palos
Software: Design and install equipment racks, pull cable, install equipment
and terminate and test system. San Diego, CA MC Communications Inc.: Feb 98-April 00 Construction Cable Splicer: OSP · Cox
Communications: System upgrade, splicing in new systems amp digital
telephony. San Diego, CA · Cox
Communications: Telephony (Digital Phone) service field technician and
cable splicer (night shift) San Diego, County Network Communications Inc.: Sept 95-April 98 Cable Technician · La
Costa School District: Complete retrofit and new CAT5 and fiber
installation, all voice and data system. La Costa, CA · Scripps/Mercy
Hospital: Wreck out and retrofit new CAT5 cables, IDF’S, new racks and
patch panels, termination. San Diego, CA Data Com Communications: Sept 95- April 98 Construction Cable Splicer: OSP · Southwestern
Cable: Retrofit, rebuild new build feeder and new fiber for the new ring of
fiber node system. Mira Mesa, CA · Southwestern
Cable: Retrofit existing system splicing new line amps, power
inverters, taps and aerial splicing feeder. Clairemont, CA · Cox
North County: Post wiring in existing structure and new build cable system.
Marine Corps Camp Pendleton, CA · Paragon
Cable: Retrofit trunk aerial splicer and on call maintenance technician.
Huntington Beach, CA · Sprint
PCS/Cox San Diego: Cable and micro processing integration installation
splicer, stand by and on call maintenance technician. San Diego, CA · Cox
Cable-Retro and new build splicing tap change out to power extracting (PE)
taps for Cox Digital Telephone (telephony) Advanced Communications Inc.: Jan 95- Sept 95 Construction cable splicer: OSP · Dimension
Cable Vision: Upgrade and repair copper feeder underground and cable
splicing. Escondido, CA · Cox
North County: Complete overhaul and new build. Underground wreck out and new
cable pulled in over lash, new feed and trunk coax cable, splicing new line
and trunk amps, installing power supplies. Escondido, San Marcos,
Oceanside, CA Education/Certifications: 2013- Confined Space Entry Certification 2013- Scaffold User Hazard Awareness Training and
Certification 2013- Fall Protection Awareness Training and
Certification 2013- Boom Certification 2012- Slab Scissor Lift Certification 2012- Rough Terrain Scissor Lift Certification 2011- Berk-Tek/OASIS Integrator Qualification
Program 2010- National Communications Training Center,
San Diego, CA Fiber Optic Certification/Drake Certification 2001- Amp Product Integration and Certification
Program 1999- Cox Communications- San Diego, CA Coaxial cable preparation and splicing workshop 1985-Poway High School- Poway, CA |
|
|
||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||||||||
|
|