Page 1 of 3
REYNALDO O. ACOSTA
1819 Raymond Ct. Ontario, CA 91764
Phone: (909)510-9083
E-mail: roa_35@yahoo.com
OBJECTIVE: Seeking a position in the field of telecommunication with technical
responsibilities including design, installation, testing, maintains activities for
Central Office, Outside Plant and Wireless facilities.
EDUCATION: Associate Electrical Technology
Technological University of the Philippines 1973-1975
B.S. Electronic Communications Engineering
Feati University Manila, Philippines
1982-1986
SKILLS:
Computer Skills
MS Office for Windows NT, Excel Spreadsheet, Auto Cad, Visio,
ICGS, IDDS, AIIS, Smart Form, Bentley (RAMS, PRICER), O & M Configuration
Technical Skills
Central Office equipment installer/ technician, power and copper cable technician,
Fiber optic, copper and conduit design engineer, Wireless equipment Field Tech
Engineer, cell site auditor and fiber site walk, surveyor and electrician (residential).
EXPERIENCES:
Wireless Field Engineer II
MYCOM North America
• Install and load script at Tellabs 8605 SIAD equipment..
• Install and load script at ALU7705 SIAD and Cisco 2900 equipment.
• Install and configure DS3 equipment.
• Provision T1circuits at ALU MPR9500 Micro Wave equipment.
• Installed and Configure Harris –Aviat microwave equipment.
5/2010- Present
• Run fiber optic cable and turn up circuit from Ciena equipment to ALU7705 SIAD
equipment.
• Install and test Alvarion WIMAX equipment, MW path alignment (Received Level test),
Antenna EM test using Spectrum Analyzer, dial speed test and drive test.
• L2 T1 testing, deliver required T1 requested by AT&T at cell site either from NIU or DS3
equipment via telco or micro wave as transport.
• Provisioned micro wave equipment such as ALU MPR9500, ALU MDR8000, Harris
Constellation, Harris Stratex and Truepoint, Exalt, Proxim and Adtran.
• Installation and Integration of Ericsson GSM (CDUK), UMTS DUW and LTE DULL
equipment.
• T1 re-harvest and cabinet reconfiguration.
• Run and terminate cable extension from Telco box and MPOE to Cell site.
• Lead Technician in the installation of DAS equipment:
- Floor lay out
- Erection of relay racks, cable runways and fiber ducts.
- Install and test rectifier and battery banks.
- Run and terminate power cable, coaxial and fiber optic cables.
Page 2 of 3
OSP Design Engineer
AFL Network Services
12/2006- 4/2010
• Designed conduit lay-outs for AT&T FTTN (Fiber to the Node) projects using auto cad.
• Plan and design FTTP, MDU, MTU and BAU projects for Verizon Tel. Co.
• Researched, surveyed and measured existing facilities and utilities based on
substructure maps and city plans.
• Designed base map in accordance to city’s track maps such as road measurement,
bearings and radius.
• Designed Traffic Control plan per city requirements.
• Research information for aerial, underground and conduit maps using IDDS,
ICGS and city maps.
• Field survey by measuring the distance of existing and new facilities such as manholes,
pole, pedestals, hand holes, conduits, cables and utilities involved in the project.
Wireless Field Tech Engineer
EXI Parsons
06/2005-11/2006
• Installed and integrate Ericsson RBS equipment for AT&T wireless project.
• Installed and tested WLS (911) and Flex master LMU equipment.
• Drive test sector to sector to ensure that the new equipment is working properly.
• Run T1 cable from NIU and DS3 equipment to cabinet..
• Terminate cable by using RJ45 connector.
• Coordinate testing of T1 by loop test or by using T-berd.
• Conducted quality inspection of cell site installed.
Central Office Equipment Installation Supervisor M-3
Philippine Long Distance Tel. Co.
• Arrange and designate schedule of works.
• Coordinated and attended meetings with other departments concerned, with regards
to project status and issues.
• Supervised installation of new central offices that ranges up to 70,000 subscriber lines.
• Handled administrative jobs for twenty to thirty people working in the project.
• Evaluated performances of people worked on the projects handled.
• Conducted site audits and site walk for fiber optic and equipment proposals with fiber
providers and other contractors for cell sites.
08/1992-05/2005
• Supervised installation, testing, activation and cut-over of Central Office equipment
such as line switch, transmission, and power.
Page 3 of 3
Central Office Equipment Technician Lev. I - IV
Philippine Long Distance Tel. Co.
• Lead man in erection racks, frames, power boards and cabinets.
• Conducted floor layouts, drilled holes on floors and walls, and iron works in
constructing frames, racks, bays, cable runways and trays.
• Installed, commissioned and maintained rectifiers, Power Distributing Unit (PDU),
Automatic and Manual Transfer Switch, Un-interrupted Power Supply (UPS),
batteries cells that ranges from 2500AH to 6000AH.
• Lead man in installation and commissioning of Transport equipment (SDH).
• Run, terminated and tested copper, fiber and power cables.
• Cross connect circuits at MDF, HRIDF, DDF and DSX based on cut sheet.
TRAININGS AND CERTIFICATES:
• ALU MPR9500 Microwave Equipment Operation and Maintenance- Alcatel/Lucent
Dallas, TX USA May 6 to May 9, 2014
• Ericsson RBS Equipment Installation (RT2)- Chino, Ca. USA- October 2005
• SBCA Satellite Installation and Testing – Torrance, City Ca. USA- July 2004
• FIBER OPTIC TRANSMISSION CABLE MAINTENANCE - PLDT, Philippines July 2000
• ASYNCHRONOUS TRANSFER MODE (ATM) - PLDT, Philippines October 1997
• SYNCHRONOUS DIGITAL HIERCHY TECHNOLOGY - PLDT, Philippines May 2000
• SYNCHRONOUS Line Equipment SLD-16 (O&M) - PLDT, Philippines May 2000
• MS Office for Windows NT - PLDT, Philippines October 1999
• Frontline Leadership – PLDT, Philippines 1994
• Supervisory Training I – PLDT, Philippines, 1993
• Electro Mechanical Switch Adjustments - PLDT, Philippines April 1985
• BASIC CENTRAL OFFICE EQUIPMENT INSTALLATIONS - PLDT, Philippines Aug. 1977
SPECIAL AWARDS AND COMMENDATION:
• 1992 Outstanding Employee of the Year – Philippine Long Distance Tel. Co.
• 1987 Most Deserving Performance of the Year-– Philippine Long Distance Tel. Co.
06/1976-08/1992
• Lead man in preparation and implementation of cut-over of switch expansion and
power upgrades.
REFERENCES:
• Steve Knoob- Field Manager, MYCOM LA Market Tel. 619-600 8218
• Corey Becoat- Field Manager, MYCOM Rocky Mountains Market Tel. 678-347 6446
• Deds Garcia- Manager AFL Network Services Tel. 510-388 2229