OBJECTIVE: |
I want to utilize and expand my
experiences as a Planner and Engineer. |
|
EXPERIENCE: |
8/2014 - Present |
Team Fishel |
Columbus, Ohio |
|
Industry: |
|||
|
|
|||
|
Identified and Engineered routes
to place fiber cable between Cellular Towers and Mini-Nodes. |
|||
|
11/2010 - 8/2014 |
Kenton Group (Frontier) |
Marion, OH |
|
|
Industry: |
|||
|
|
|||
|
Planned and Designed Sites for
deployment of equipment to provide High Speed Internet (BBE) to meet the
merger commitment of 85% availability. |
|||
|
The purpose for this assignment
was to provide the maximum availability of High Speed Internet at the least
cost to meet the Broad Band Expansion (BBE) commitment of the merger between
Frontier and Verizon.To achieve this goal we researched existing Carrier
Sites/Interfaces with respect to number of house holds passed and existing
field conditions. Based on the finding we would prepare a proposal that would
provide the service. That would be compared to other sites and the most
economical based upon the General Managers recommendations would be planned.
This planning involved an on site survey meeting, preparing planning
documents. We placed the pictures from the site survey along with a detailed
study map, narrative, equipment quotes and pricing in a folder. The engineers
then used the folder information to prepare the prints for construction. |
|||
|
2/2010 - 11/2010 |
ECSM (Horizon) |
||
|
Industry: |
|||
|
|
|||
|
Engineered the placement of Fiber
cable including field notes, proposals, J notes and prints for drafting. |
|||
|
The purpose for this assignment
was to provide fiber cable to the Medical Facilities and the rural areas of
Ohio.The Horizon Planners determined where the facilities were needed and we
would ride the area to determine the fiber route. The goal of the ride was to
maximize the penetration of fiber. We setup fiber loops at intersections and
every 2,000' to allow for future deployments. I would then design the fiber
placements aerial, buried or underground. this included joint use poles and
building new pole lines. Prepared proposals and permit documents for Horizon
to submit. Prepared detailed prints for drafting. Also field checked proposed
routes to identify the work content. |
|||
|
4/2009 - 8/2009 |
CHC Consulting, LLC (AT&T) |
Chicago, IL |
|
|
Industry: |
|||
|
|
|||
|
FTTN |
|||
|
Engineered and Submitted for
Approval Projects that provide fiber and equipment. These jobs provided the
VRAD equipment for Project LIGHTSPEED (FTTN). |
|||
|
4/2008 - 10/2008 |
CHC Consulting, LLC (AT&T) |
||
|
Industry: |
|||
|
|
|||
|
Cable Mining Progam |
|||
|
Analyzed the Planners Studies and
recommended removal candidates to RRT for the Cable Mining Program. |
|||
|
1/2006 - 4/2008 |
Mountain Limited (AT&T) |
||
|
Industry: |
|||
|
|
|||
|
LIGHTSPEED (FTTN & FTTC) |
|||
|
Engineered and Submitted for
Approval Projects that provide fiber and equipment . These jobs provided the
VRAD equipment for Project LIGHTSPEED (FTTN). This included researching
easements and right of ways. Also researched and proposed fiber and equipment
for fiber deployment to the cellular towers (FTTC). Built Fiber inventory and
Equipment assignments into Granite. |
|||
|
10/2001 - 12/2005 |
ITI, LLC (VERIZON) |
||
|
Industry: |
|||
|
|
|||
|
CO & IOF Planner for Southern
Ohio |
|||
|
Monitored and provided relief for
the Central Offices and the Interoffice network based on forecasts and
service orders. Placed a statewide OC192 Sonet Ring for DSL Bandwidth
Expansion. Also coordinated with other telcos for Inter Company Sonet Rings. |
|||
|
5/2001 - 9/2001 |
City Signal |
||
|
Industry: |
|||
|
|
|||
|
Design Fiber Ring around Columbus,
Ohio. |
|||
|
Responsible for Design of Fiber
Ring around Columbus and Collocation in the Ameritech CO's. |
|||
|
3/2001 - 4/2001 |
ITI, LLC (Verizon) |
||
|
Industry: |
|||
|
|
|||
|
Replaced PUCO mandated defective
copper cables. |
|||
|
Replaced copper cables that had
been identified as service affecting. This involved building new pole lines,
researching road right of ways and nogotiating with local municalities
(water). Had to work with R/W agent to secure private easements. Provided
facilities to remove obselete carrier equipment. |
|||
|
1/2000 - 11/2000 |
SBC |
||
|
Industry: |
|||
|
|
|||
|
Project Managed Cell Sites,
Requests for Design, Delayed Orders over 30 Days Old and Litespan Plug
Recovery. |
|||
|
The Outstate area we were
responsible for consisted of 6000 square miles (111 Central Offices) from
Youngstown to Ironton, OH. Conducted weekly conference calls to monitor
Delayed Orders in order to provide service in a timely manner. Followed up
all service orders for Cellular Towers for timely installations. Monitored
RFD's thru completion. Prepared Litespan Plug Recovery Studies. Second Tier
support for the area. Represented supervisor at Staff Meeting to act on his
behalf regarding departmental affairs. |
|||
|
2/1997 - 1/2000 |
Ameritech & SBC |
||
|
Industry: |
|||
|
|
|||
|
Project Manage Advantage Ohio,
Coordinate with Independent Local Exchange Carriers, Coordinate CO Floor
Space Forecasts. |
|||
|
The area I was responsible for is
now the 740 area code. The Advantage Ohio provided fiber rings between all
CO's and fiber to County Courthouses, Schools, Libraries and Jails. The
project included placement of 588 miles of fiber cable and building of 42
Sonet Rings. Placement of the fiber included using active and abandoned
railroad right of ways, road right of ways and private easements.Floor space
in the 88 Central offices had to be coordinated for the Sonet equipment.
Negotiations with ILECs was needed to go thru or use thier fibers for joint
rings.Provided Second Tier support for Loop Planning in Southern
Ohio.Designed the 5 state Ameritech Interstate Corporate Netwok which
consisted of 4 OC48 Sonet Rings. To complete this project I also had to PM
the build of 22 miles of fiber. |
|||
|
10/1993 - 2/1997 |
Ameritech |
||
|
Industry: |
|||
|
|
|||
|
Provided Feeder Relief |
|||
|
Monitored fills for 28 Wire
Centers from Lancaster to Ironton to Marietta, OH. Other Areas at times
during this period included Miamisburg and the Hillsboro area.When fills
reached a level that relief was needed, a study was preformed that included
existing conditions, forecasts and service orders. The results of the study
was submitted for authorization to proceed. |
|||
|
8/1988 - 10/1993 |
Ameritech |
Columbus, Ohio |
|
|
Industry: |
|||
|
|
|||
|
Developed and Monitored
Engineering and Construction Bugets for the 456 Division. |
|||
|
Distributed the Division Budget to
the Area Managers level and monitored the spending levels. this information
was provided to Division and area managers on a monthly basis. Reviewed
Feeder Studies and Major Undertaking with expenditures over $25,000 for the
Division Managers Approval. Verified need and accuracy.Member of the team
that implemented a new budget program (CBAS).Participated in monthly area
results and staff meetings. |
|||
|
1/1966 - 8/1988 |
The Ohio Bell Telephone Company
Inc/ Ameritech |
||
|
Industry: |
|||
|
|
|||
|
Feeder Planner, Design Engineer,
Staff Engineer, Engineering Assistant, Step by Step Central Office Repairman |
|||
|
During this period I was
responsible for several high growth areas in northwest Colunbus including
Dublin. Worked with the team to implement standardized study procedures for
feeder routes from Long Range Planning thru Distribution Area
Planning.Assisted on the development of training cources through the Training
Advisory Board for OSPE. Assisted in the development of the Wire Center
Review Guidelines.Reviewed Feeder Studies for the Division Staff.Participated
in the Service Pro program, my customer was Scherers Communications. |
|||
|
EDUCATION: |
9/1965 - 12/1970 |
Franklin University |
|
|
|
|||
|
Major - Industrial Management |
|||
|
SKILLS: |
Skill Name |
Skill Level |
MICROSOFT OFFICE Suite, AT&T
& VERIZON systems. |
Intermediate |
|
|
REFERENCES: |
Reference Name: |
Jim Reid |
|
Reference Company: |
Spavinaw Elementary School |
|
|
Reference Title: |
Project Manager |
|
|
Phone: |
707-258-9894 |
|
|
Email: |
jreid@chcconsulting.com |
|
|
Type: |
Professional |
|
|
Reference Name: |
Alicia Wroblewski |
|
|
Reference Company: |
Spavinaw Elementary School |
|
|
Reference Title: |
Project Manager |
|
|
Phone: |
949-499-5884 |
|
|
Email: |
awroblewski@chcconsulting.com |
|
|
Type: |
Professional |
|
|
Reference Name: |
Anita Nuckols |
|
|
Reference Company: |
AT&T |
|
|
Reference Title: |
LCP |
|
|
Phone: |
614-223-5597 |
|
|
Email: |
an8363@att.com |
|
|
Type: |
Professional |
|
|
Reference Name: |
Rick Lyon |
|
|
Reference Company: |
Frontier Communications |
|
|
Reference Title: |
Area Manager |
|
|
Phone: |
740-382-7435 |
|
|
Email: |
richard.lyon@frontier.com |
|
|
Type: |
Professional |
|
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||