12/89 –
8/2002 CHR Solutions,
Inc
Lubbock, Texas
OSP Technical Specialist/ CAD Technician
§
Review OSP cable designs for
correct cable sizing and gauging, making construction material
cost-effective decisions, receiving field reports and verifying their
accuracy compiles draft sets of OSP plans and specifications, prepares
associated drawings and reports, performs initial bid analysis and
recommendations, prepares preliminary cable schematics and circuit
diagrams, coordinates and supports project field activities, maintains
headquarters project files to reflect current status of all elements, periodic
visits to field offices for contract compliance assurance and for audits to
assure compliance with CHR guidelines.
§
Expertise in the inspection and
inventory of buried plant facilities.
Experienced in
the conduct of Area Coverage Surveys.
Experienced in cable schematic compilation and
correction.
Knowledgeable in the tabulation of construction
assemble units.
Experienced in
the inspection and inventory of aerial plant construction.
Experienced in
performing “pre-installation” cable tests.
Experienced in
the “pre-installation” cable tests.
Experienced in
the “pre-installation” inspection of material and cable.
Assisted with
preliminary staking maps, determining construction corridors, and selecting
construction units.
Performed
selected cable acceptance tests.
Experienced in
the inspection of CATV (coaxial cable) facilities.
Compiled “as
built” documents.
Experience in the inspection
of CLEC projects
§
Experienced in requiring
Contractor compliance with the contract, plans & specifications.
Experienced in
the interpretation of contracts, plans and specifications.
Experienced in
performing “pre-installation” and acceptance testing of cable.
Compiled Area
Coverage Surveys.
Experienced in
the issuance of directives to contractors.
Maintained
project files and daily project logs.
Experienced in
the completion and submission of required project reports.
Experienced in
the management of Inspectors.
Capable of
staking projects and/or additions to projects.
Prepared and
maintained, on a daily basis, cumulative inventories of completed
construction.
Experienced in
the compilation of selected portions of OSP plans and specifications.
Participated
in the preparation of “as built” and closeout documents.
Documented
events, discussions, etc. that materially affect the conduct of
construction project.
Directed and
managed inspectors in the accomplishment of CLEC projects
|