From: route@monster.com
Sent: Wednesday, September 16, 2015 1:59 PM
To: hg@apeironinc.com
Subject: Please review this candidate for: OSP Technician
This resume has been forwarded to
you at the request of Monster User xapeix03
|
|||||||
|
|||||||
|
|
|
||||||
|
||||||
|
Kurt Heinze crusherheinz@yahoo.com 307-256-9588 Summary: ·
10+ years of
experience as a Project Construction Manager, managing for large scale
LTE/UMTS/CDMA new site builds projects and site acquisition, leasing &
zoning, site development and site-modifications. ·
Managed site
acquisition, leasing & zoning, construction and activation contractor
crews from 2C ads through LTE integration for AT&T. ·
Managed site acquisition for power
supply placement throughout the 4,000 mile builds for AT&T Broadband
project. ·
Provided
Construction Management for LTE Cell tower build-out for all 156 sites in WY. ·
Ensured that
sub-contractors performed work to the standards required by AT&T and
communicated project status with the project management team. ·
Expertise in
overseeing line of sight, site survey, property records, Site acquisition,
construction and installation ·
Managed ROW
investigation, site acquisition, leasing, zoning, procurement and
documentation. ·
Managed Site
acquisition for Wireless microwave tower sites. ·
Managed
Construction of five microwave towers as Project Manager for Daniels
Cablevision. ·
Four
microwave tower projects, site acquisition, leasing, zoning, digital backhaul, fiber
node placement through certification. ·
Contract
engineer providing inspection, site acquisition, leasing and engineering
drafting for CALIX 1000 and 2000 VDSL rollout. ·
Selected vendor [Motorola] for
$Billion fiber optic node and amplifier order. ·
Track record
of successfully constructing microwave towers, cell sites and AT&T
Broadband ·
Ensured the
grounding of the tower is successfully using NEC (National Electric Code)
Standards ·
Completed
site walks, surveys and punch lists for sites completed by the vendors. ·
Work with MS
Office, especially MS Excel to create spread sheets and conducted meetings
and reports every morning. ·
Used CASPR
for tracking the projects and creating punch list for all the cell sites. Education: B.S., Portland State University Skills: ·
Project
Construction Management ·
Tower
Construction Projects ·
LTE/UMTS/CDMA/GSM/Broadband ·
Site
Acquisition (Leasing, Zoning, Permitting and ROW) ·
Microwave
Backhaul – Transport ·
Cell Site
Integration & Optimization ·
Cell Site
Buildouts, Raw Land Buildouts ·
Site
Modifications ·
Deployment
& Grounding of Cell Towers ·
NEC Standards ·
Site
Inspection & Auditing ·
Punch
Walks/Quality Walks ·
Problem
Resolution ·
MS Office
(Word, Excel, Outlook) ·
MS Project ·
Proficient
reading blueprints ·
Excellent
Problem Solver ·
Accurate
Initial Permit Acquisition ·
Strong
Interpersonal Skills ·
Great
Computer Abilities Professional
Experience AT&T Mobility, WYDec 2012 – Jul 2013 Project Construction Manager ·
Provided
Construction Management for LTE Cell tower build-out for all 156 sites in WY. ·
Managed
construction, site acquisition, leasing & zoning and activation
contractor crews from 2C ads through LTE integration. ·
Ensured that
sub-contractors performed work to the standards required by AT&T and
communicated project status with the project management team. ·
Completed
site walks, surveys and punch lists for sites completed by the vendors. ·
Created Punch
lists for contractor installation activities. ·
Ensured the
grounding of the tower is successfully using NEC (National Electric Code)
Standards. ·
Managed GPS,
grounding, connectivity, hatch plates, surge arrestors, fittings, cable
dressing and KATHREIN control unit. ·
Responsible
for Site Survey, BBU inspections, eNodeB ALARMS, ARGUS labeling, Alpha power
supply breakers, Raycap DC6 connections, Rosenberger cabling, CDMA, UMTS, RTS
data sheets, 2C and 3C, RRH and clean up. ·
Provided
resolutions and technical guidance to the engineers and technicians regarding
outside shelter construction and grounding of cell towers. ·
Completed all
4 Modules of RX-AIT (Receiver – Air Interface Tray). ·
Used CASPR
for tracking the projects and creating punch list for all the cell sites. ·
Work with MS
Office, especially MS Excel to create spread sheets and conducted meetings
and reports every morning. AT&T, Honolulu, HI (Required
secret clearance)Jun 2012 – Dec 2012 Project Manager & Engineer ·
Multiple
military base engineering with secret clearance Tetra Tech Sheridan School District,
Sheridan, WY04/2012 to 05/2012 Contract Engineer ·
Completed
engineering route of Fiber-To-The-Schools for customer. ·
Put together
a final route from initial layout, starting from school HUB site acquisition
out to Middle, Elementary and High schools in the Sheridan, WY school
district ·
Oversaw site
plans and installation documentation, whilst completing reports and
closeouts. TDSJan 2012 – Mar 2012 Project Construction Engineer ·
Contract
engineer providing inspection, site acquisition, leasing and engineering
drafting for CALIX 1000 and 2000 VDSL rollout. ·
Brand new
generation of DSL w/video to migrate into traditional Cross Box Telco
connectivity. WindstreamOct 2011 – Jan 2012 Design/Survey Engineer ·
Contract
engineer utilizing SmartSketch CAD program to develop documentation for site
acquisition from prepared field notes. ·
Fielded
layout for multiple aerial to underground facility Telco engineering, and
designed a large FTTP upgrade for a subdivision. General Dynamics (Field with secret
clearance)2010 – 2011 Principal Engineer ·
Middle East -
Principal Engineer ·
Google Earth
OSP facility INPUT, NOC facility QA/QC. RMWTJul 2005 – Mar 2009 TELCO OSP Field and Design Engineer ·
QWEST Wyoming
area copper and fiber facilities field notes through design using OSP-FM
computer design ·
ROW
investigation, site acquisition, leasing, zoning, procurement and
documentation. ·
Over 70
subdivisions designed in Casper, Cody and Gillette ·
Site acquisition
for Wireless microwave tower sites. ·
Worked with
Burlington Northern Railroad personnel on a successful 49 mile main line
facility move Engineered QMOE [Fiber to the school] placement of OSP/ISP
80,000' fiber optic cables and facilities. ·
Work with MS
Office, especially MS Excel to create spread sheets and conducted meetings
and reports every morning. Henkels and McCoy - Verizon FTTPJan
2005 – Jul 2005 Fiber Optic Field and Design Engineer ·
Verizon Mid
Atlantic FTTP project. ·
Represented
QWEST provisioning three cell sites with Verizon project manager in 2008. ·
Produced
activation prints for fiber interconnect, freeway crossings, FTTC [Fiber to
the Cell], small cell build. ·
Layout fiber
counts, buffer tube integrity, dark fiber, splice points, storage, optical
coupling and terminal design from FDH site acquisition to premise from field
notes in Philadelphia area. Daniels CablevisionJan 2004 – Nov 2004 HFC Wireline - Wireless Upgrade Project
Manager ·
Managed
Construction of five microwave towers as Project Manager for Daniels
Cablevision in 2004. ·
Duties
included Line of sight, site survey, property records, site acquisition, ROW,
construction and installation. ·
HFC Upgrade
for three towns in Wyoming and Colorado. ·
Lode Data and
EXCEL tracking programs. ·
Four
microwave tower projects, site acquisition, Leasing, zoning, digital backhaul, fiber
node placement through certification. ·
Work with MS
Office, especially MS Excel to create spread sheets and conducted meetings
and reports every morning. Surewest BroadbandJan 2003 – Jan 2004 Fiber Optic Project Engineer ·
Pole loading,
fiber base map engineering, G.O. 95 HOA, aerial make ready for Surewest
Broadband FTTH in Sacramento area. Ramzey Broadband ServicesJan 2002 – Jan
2003 CMTS System Manager ·
Started HFC
HSD Modem installation from scratch in Bay area ·
Cultivated
and awarded large telecommunication construction contract for company. AT&T Broadband ProjectMar 1999 – Dec
2001 HFC Technical Operations Manager ·
During
AT&T Broadband Denver HFC Upgrade directed in house and sub-contractor
construction, splicing and sweep crews throughout the city. ·
Estimate and
coordinate work activities for various cell site projects for AT&T. ·
Track record
of successfully constructing microwave towers, cell sites and AT&T
Broadband ·
Upgrade
directed in house and sub-contractor construction, splicing and sweep crews
throughout the city. ·
Build out of
SONET Ring secondary hubs. ·
Used CASPR
for tracking the projects and creating punch list for all the cell sites. TCS FT Collins –
Castle Rock, COApr 1996 – Feb 1999 ·
Provided upgrade splicing
expertise to help TCS win 4,000 mile Denver Metro HFC Prime contract. ·
Appointed Upgrade Splicing
coordinator on AT&T BROADBAND Denver Metro HFC Upgrade. ·
Selected vendor [Motorola] for
$Billion fiber optic node and amplifier order. ·
Appointed project Engineer then
handed AT&T HFC Network Architecture manual by Corporate Engineer's. ·
Managed site acquisition for power
supply placement throughout the 4,000 mile builds. ·
Directed over 300 contractors on a
daily basis. ·
Managed five design houses as the
Prime "Turnkey" Contractor project engineer. ·
Designed curriculum for splicing
school for ex-servicemen. |
|
|
||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|