From: route@monster.com
Sent: Wednesday, September 16, 2015 1:59 PM
To: hg@apeironinc.com
Subject: Please review this candidate for: OSP Technician
This resume has been forwarded to
you at the request of Monster User xapeix03
|
|||||||
|
|||||||
|
|
|
||||||
|
||||||
|
CARY CRAFT 3234 PALACIO COURT, SPARKS, NV 89436 (775) 842-0442 CELL SUMMARY OF QUALIFICATIONS: 25 years of experience in Bell
System Outside Plant engineering design of: Central Office Main Frame
Terminations Fiber facilities including
central office, remote terminals, VRAD and Litespan 2000 DS1 through OC48 fiber
terminations HI-CAP, HDSL, ISDN, ADN, DSL BIC (Building Industry
Consultant) entrance facilities Underground District conversions
and relocations Subdivisions, industrial parks
and real estate developments Copper, digital & fiber
relief Conduit substructure, open cut
trenching and directional boring Bridge crossings & aerial
pole line Government agency permits &
Right of Way AutoCad, ARES/AOTL/JAMS certified ESM (Engineering Software
Management) work study observer EMPLOYMENT HISTORY: ITC Service Group May 2012 to
November 2012 (877) 370-4482 Outside plant fielding and design
under contract to Optica Networks/E-Care federal grant project. Field survey
of over 2000 poles for fiber optic backbone build and laterals connecting
rural hospitals between Beatty and Reno. Utilized Trimble GPS survey
equipment and digital range finder to establish pole position and height of
attachments for all utilities. Successfully submitted OCALC pole loading data
for application to attach to NV Energy, AT&T and Valley Electric
Association facilities. Prepared permit drawings for Nevada Department of
Transportation for aerial crossings of state highways. Properly performed
underground fiber placement inspection to G.O. 128 standards through leased
NV Energy, AT&T and Optica owned structure. BYERS Engineering – June 2011 to
May 2012 (925) 226-4159 Successfully engineered/fielded
numerous short fused AT&T copper/fiber projects to meet critical service
and corporate due dates in northern California. Projects included major fiber
backbone reinforcement and placement to various ATT Mobility cell sites for
new 4G network and immediate copper distribution rehab/replacement/relief for
LIGHTSPEED services. Fielded fiber make ready pole attachments for AC2
(Comcast overbuild projects). Successfully
engineered new pole line & revamped existing facilities to meet/surpass
California Public Utilities Commission requirements. Utilized ARES, JAM,
CFAS, MIC, ELP, LFACS and Ocalc AT&T applications/software. AMERITRAINING Inc. – July 2009 to
November 2009 (614) 657-4238 Under contract to AT&T,
direct reporting to Methods and Procedures Staff throughout California and
Nevada. Accurately gathered OSP construction activity data for ESM Time &
Motion study. Beat AT&T anticipated study project time line by 4 weeks.
Conducted over 100 individual studies of OSP splicers & linemen. Daily
categorization & PDA input of OSP activity performed during each 8 hour
study. Environments included: Central office, pole line, aerial, buried,
underground, manholes, building terminations, copper, fiber, digital, HICAP,
FTTN & VRAD. VOLT Telecommunications Group –
October 2007 to August 2008 Under contract to AT&T, on
premise at 745 East Moana Ln. Reno (775) 345-4870 FTTN project engineer – field
& design LIGHTSPEED F2 copper conditioning for entire distribution areas.
Replaced substandard terminals, designed proper grounding, conditioned
primary pair commits & pair bonding, ARES/AOTL/JAMS certified with
AT&T. Successfully completed all annual budgeted project deadlines 4
months earlier than anticipated by AT&T. ITC Service Group Inc. – May 2007
to October 2007 AT&T (SBC) – 11012 West River
St. Truckee, California (877) 370-4482 Subway inspector for AT&T
Sierra District Contract Administration. Responsible for all facets of
construction & rearrangement of underground conduit & manhole facilities.
Responsible for inspection and adherence to AT&T Bell System Practices,
National Electric Code (NEC) & General Order (G.O.) 128 Standards.
Inspected & resolved substandard construction by various contract firms
involved with private development and public projects, saving AT&T lost
time, missed commitments and non-acceptance of unusable conduit structure. Keller Williams Group One –
February 2005 to present 690 Sierra Rose Dr. Reno, Nevada
89511 (775) 823-8787 Nevada licensed Real Estate Sales
Agent, involved in marketing, representation, and contract negotiation of
numerous residential home purchases/sales. Successfully closed escrow on over
25 real estate transactions. Received Keller Williams “Rising Star Award
2006” for exceptional volume of home transactions completed. Universal Network Development
Company- October 1997 to August 2001 Under contract to AT&T, SBC
& Pacific Bell on premise at 340 Pajaro St. Salinas & 3675 T St.
Sacramento, Ca. (916) 569-4190 Outside Plant telecommunications
engineer – Design working drawings to build, reinforce, rearrange and replace
aerial, buried & underground telecom cables and conduit within public
& private property. Responsible for engineering all facets of copper,
fiber, digital, and conduit facilities from central office throughout route
to customer premises. Communications Specialist Supervisor: Responsible
for the supervision & workload administration of 10 OSP design engineers.
Met or exceeded all customer/corporate provisioning dates to provide superior
service, project coordination and budget profitability. Pacific Staffing - January 1997
to October 1997 Under contract to Brooks
Fiber/WorldCom/MCI) 3841 Scott Blvd. San Jose,
California (916) 925-2300 Building Industry Consultant
(BIC)/Outside Plant Fiber Engineer – Design working drawings to build &
reinforce single mode fiber cable/conduit facilities within public &
private property. Provided design drawings, and construction coordination for
an aggressive short fused build program to over 70 high profile Silicon
Valley Fortune 500 companies. Pacific Bell – July 1973 to
January 1997 340 Pajaro St. Salinas,
California (831) 754-8486 Employed by Pacific Bell for a 24
year career in various disciplines including accounting, drafting, Location
Records, engineering clerical supervisor & Outside Plant design engineer.
Route Manager for 6 exchanges ranging from urban/metropolitan to rural
mountainous areas. Scope of design included central office terminations to
all facets of placement, reinforcement, rearrangement, replacement of copper,
digital, fiber and conduit facilities within the exchange loop.
Received numerous awards for quick provisioning of customer/government facilities,
production and economic capital investment rate of return. Slashed OSP
expenses by identification & replacement of high cost maintenance areas.
Garnered corporate award for engineering & coordination of a short fused
11 mile fiber ring build in Scotts Valley to provision fiber & conduit in
order to interconnect 7 high profile company buildings throughout city. |
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|