From: route@monster.com
Sent: Wednesday, September 16, 2015 1:59 PM
To: hg@apeironinc.com
Subject: Please review this candidate for: OSP Technician
This resume has been forwarded to
you at the request of Monster User xapeix03
|
|||||||
|
|||||||
|
|
|
||||||
|
||||||
|
HARRY TRIPP 1288 Co Hwy 4 Otego, NY 13825 C774-454-8629 htripp@Engineering.com EMPLOYMENT HIGHLIGHTS
February
2012 to November 2012 FRONTIER
COMMUNICATIONS-Rochester, NY,(PCS Engineering) Primary
job OSP Engineer / Make Ready, Transfer and Removal to provide room on poles
for other Utilites. Turf back up Engineer jobs, i.e. Fiber to Cell Sites, to
new Businesses, Copper jobs aerial, underground. Design by Auto
Cad,Intelicad submit for approval to final build. Handle Customer complaints.
Engineering Supervisor, Dan Hartman February
2011 to August 2011
FAIRPOINT COMMUNICATIONS-(Byers Engineering) FIBER
TO THE CELL SITE ENGINEER, BURLINGTON, VT Research
and co-ordinate with Planning Engineer to devise fiber distribution, and
counts to ATT, VERIZON, and Fairpoint Cell sites. Design on Visio and
submit to Construction. All of Northern VERMONT Bridge
Street, Manchester, NH February
2010 November 2010
AT&T (PCS) OSP
LOOP PLANNER, HARTFORD, CT EXCHANGE
ENGINEER: Direct responsibility for Vrad / dslam build within the sate
of Connecticut. Determining which loop electronics products to use
Aerial/ Buried, pole mount or pad mounted equipment. Using the Local
loop, digital and fiber optic concepts, and transmission and provisioning for
the build. The A T & T programs used were OPTI-NT,MIC,NRVE, Litespeed
Tracking, LEIS, LFACS. Brainerd
Road, Hartford, CT Jan
2009 to August 2009 VERIZON-(RJE
Telecom) NETWORK/DESIGN
ENGINEEER 12 WIRE CENTERS Handle
Residential, Commercial, Industrial projects
and network design. DSL and Hi-Cap provisioning.
Negotiate space for co-locations and
easements. Programs: Visio, LEIS,LFACS, LEIN, ICGS
documentation and mapping. 16320
Thompson Road, N Syracuse, New York Feb
2008 to October 2008 FAIRPOINT
COMMUNICATIONS MSAN
LEAD PLANNING ENGINEER(Employee) Supervise
five project engineers with the planning and
network design of the Broadband Initiative and deployment
of Fiberoptic and copper facilities throughout
Maine, New Hampshire, and VERMONT. June
2003 to January 2008
VERIZON-(Tek Systems) HIGH
CAP Engr. & CELL SITES ENDICOTT,
NEW YORK DESIGN
& BAU ENGINEER Turf
Engineer Syracuse, and Utica, New York Design
/ Turf Engineer Pawtucket,
Rhode Island January
2001 to June 2003 UTILITY
CONSULTANTS INC.(Employee)
PROJECT MANAGER / SENIOR PROJECT ENGINEER Design,
Field Survey, Draft and Cost Inter Office long range
fiber network Prepare and Deliver Presentation to
Individual Utilities. Review
Fiber Distribution and Splice configurations for Commercial,
and Industrial Fiber placement to Buildings. Negotiating
space requirements for Fiber, OCE, and Fujitsu and
Litespan 2000 Distribution panels. Military design specs
and rebuild information infrastructure, for the Department
of Defense. Prepare site surveys and cost estimates
for Project Submittal. 603
West Street, Mansfield, MA June
1998 to Jan 2001
RCN CORPORATION, INC.(Employee)
ENGINEERING SUPERVISOR / PROJECT MANAGER Directed the activities of Four Outside Plant FTTP Engineers. Our unit was responsible for the underground fiber conduit design for Building the complete Town. As Project Manager negotiated right of way and easements for fiber underground routes and designed placement and distribution of fiber to 23 RCN "Hub Sites”in the Greater downtown Boston area. Also responsible to the Vice President for Project Management, cost analysis, and space allocation for the Level 3 Underground project in the City of Boston. 956 Massachusetts Ave, Arlington, MA
May
1994 to June 1998 BELL ATLANTIC (Tadd Telecom)
PROJECT / TURF ENGINEER Designed
and coordinated overhead, underground, buried
cable project for several telephone facilities within
the Design Area Boundary. Negotiated easements, Drafted
jobs to obtain facilities for held orders and
managed the Congressional Inquires Unit. Designing
SL C 96 and LiteSpan 2000 relief jobs. Loading,
and de loading facilities, removing bridge tap
in preparation for TI or ISDN lines. Designed
and drafted Estimates for rehab of facilities in
the Design Area Exchange. Brockton,
MA
1993-1994 NEW
ENGLAND TELEPHONE SAC ESTIMATE
GROUP State
Street, BOSTON, MA Designing
SAC estimates by use of DDAP and RDS. Working with Planning for
Feeder and ultimate Distribution Design. Contacting Abutters for Right
of Way negotiation. Coordinating Conduit activities for the placing
of SAC & Pad and Rod and Rope for cable placement. Monitoring and
coordinating the work on 2.6 million dollars of Business case money. 1991-1993
PACIFIC TEL ROUTINE GROUP SANTA
CRUZ, CA EXCHANGE
ENGINEER Direct
responsibility for 5 exchanges. Daily Held Orders and business requirements
within the exchange, in control of appeals group for 16 exchanges.
Negotiating service dates and directing follow through with construction,
assignment, and installation forces. Handled Held orders, appeals
and cable loses for 16 exchanges during 16 week work stoppage. SENIOR
PROJECT ENGINEER Conducted
forecast, economic and on site studies for the placement of Service
Area Interfaces. These projects were for 500 plus Residential, Business
and Commercial properties. Mapping and designing distribution of
plant within the SAC Design Area. Negotiating with project property owners
for Easements and Right of Way. Monitoring and supervising projects
from Basic Design to cutover. 1984-1991 NEW
ENGLAND TELEPHONE ROUTINE GROUP NEW
BEDFORD, MA EXCHANGE
ENGINEER Responsible
for two exchanges totaling 96,000 cable pairs. Monitoring and
directing daily , residential and Business Held Orders. Designing and
issuing Routine orders for changes of count, cable throws, place cable
or terminals as needed. |
|
|
||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||
|
|