From: route@monster.com
Sent: Wednesday, September 16, 2015 1:59 PM
To: hg@apeironinc.com
Subject: Please review this candidate for: OSP Technician
This resume has been forwarded to
you at the request of Monster User xapeix03
|
|||||||
|
|||||||
|
|
|
||||||
|
||||||
Jay Sharrieff
5400 Memorial Dr. 20C Stone Mountain, GA. 30088 jaysharrieff@aol.com (214) 997-4151 Currently
preparing for Cisco Certified Network Associate (CCNA)
Department of Defense Public
Security Clearance (DOD) Summary of
Qualifications
· Working experience installing and managing cable
systems, Voice, data, Ethernet Cat 5 cat 6, coaxial, fiber optic cables,
Configure Cisco router/switches and wireless networks. · Master OF All Phases of Cable Construction. Aerial,
U/G and MDU with Splicing and activation. · Knowledgeable troubleshooting telephone and cable
systems with BICIS, EIA/TIA cabling standards... Work
Experience
10/2010-Present Lamarc Telecomm.
Field Engineer, Complete turn up for commercial T-1 circuits, complete add, move
and changes for Cat5 & 6. Test cables for connectivity using test
equipment. Configure modems, routers, switches. Troubleshoot routers and
switches in a Cisco environment. 04/2010-08/2010 Present Noble
Resources, Inc. Quality Control Ride
out Cable TV Plant on Time Warner Cable system for sweep crews, Installed XM2
power supplies for upgrade on Fiber Optic Plant insured all system are in
accordance with design and FCC Proof and performance testing. 04/2008-03/2010 W&R
Technologies, Inc Working on various
contract assignments, the work include but not limited to: Installing
Satellite system, placing structured cabling i.e., Cat 5 & 6 and fiber
optic with certified terminations. Install and service Video ON demand TV
systems (VOD) digital systems for hotels, install wireless internet systems
Including Cisco Routers, Switch and Access point configurations. Also set
servers and workstations. Completed add moves & changes on the Dallas,
Texas school system. 02/2007-03/
2008 Weintraub Telecomm Inc. Contractor for COX Cable TV upgrades Phoenix
& Tucson AZ. The work consists of Fiber Nodes swaps with proof and
performance and MER/BER testing of the new node throughout the system which
also Include reverse sweep and telemetry testing. Attending weekly managers
conference for updates, maintain weekly expense reports, collect and check
tech daily’s for accuracies, give weekly safety meetings route and schedule
tech for daily node installs and keep track of techs progress/completion
rates. Also communicate with corporate
Via Fax/ e-mail, consistently use excel and word. 02/
2006-02/2007 Dynamic Networks Communication’s Inc. Installing
wireless Internet systems Residential & Commercial, setting up Modems,
routers, switches, hubs and access points using TCP/IP and others. Over
seen structured cabling projects for Voice & data Network. Including
setting up servers and work stations, with terminating testing and
certifying. Placement
of aerial fiber and coaxial cabling, over lash, make ready, Daily task
Involved Maintain all construction on CATV System on AT&T project
Major rebuild and new build climb poles and used bucket truck to
complete all work involved plant extensions for OSP, pole transfers, System
splicing, activation and troubleshooting using various field strength meters.
This work also . 11/2004-01/2006
Field Supervisor, SVI Systems, Augusta, GA. Supervised individual and
set up teams for Installation Video on Demand systems, Commercial and
residential Satellite Dish Network and DirecTV systems, and High speed Wi-Fi
internet VDSL systems in hotels; field support for wireless network. Install
wireless access points and bridges, Install and terminate Cat 5, 5e and 6,
coax cables, install DSL Netopia and Nomadic switches, troubleshoot all
systems. Installed information systems in hospitals throughout the USA, This
work consist of Placement of CATV Head-ends, placing coax cable, installing
equipment with channel line conversions, configuring Mods and de- mods.
Set up interactive units in every room, Install routers switches and modem
with configurations using IP addresses and subnet, also responsible for
wiring cat 5 Ethernet cable, coax cable and Fiber optic with test and
termination of patch panels and wall jacks using BICIS, EIA/TIA standards.
Set up access points and placed power over Ethernet devices.
03/1996-09/2004
Field Supervisor, Farley Technologies, Inc. Atlanta, Georgia. Daily
task Involved Maintain all construction on CATV System on AT&T project
Major rebuild and new build used bucket truck to complete all work
involved. Placement of fiber and coaxial cabling, over lash, make ready, plant
extensions, pole transfers, System splicing, activation and troubleshooting
using various field strength meters. This work also
Include
conduit placement, rock saw trenching, rod boring, riser guard placement,
Manhole breakouts, fiber optic and coaxial placement using fiber-blowing
method. Machine and/ or hand trenching, trunk and feeder. Installed prewired,
post wire, lockbox placement with toning, tagging and trimming units in
apartment complexes known as MDU’s EDUCATION & TRAINING 1992-1993
National Cable Television Institute
Denver, Colorado
Course: CATV Installation
Grade: Certificate of Completion 1996
Anixter
Atlanta, Georgia
Course: Fiber Optic Hands On Workshop
Grade: Certificate of Completion 1996-1998
Oglethorpe University
Atlanta, Georgia
Course: Information technology
Grade: completion NT 4.0 1999
Cabling the Workplace
Dallas, Texas
Courses: Cabling Installer Technician
Cabling Facilities Integrator
Infrastructure Consultant
Cabling Infrastructure Contractor
Structured Cabling Systems for Voice & Data 2001-2007
Redding University
Redding, California
Course: Telecommunications
Grade: 3.5 Avg.
Bachelor Telecommunications |
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Languages: |
Languages |
Proficiency Level |
|
English |
Beginner |
|
|
|