From:                              route@monster.com

Sent:                               Wednesday, September 16, 2015 2:02 PM

To:                                   hg@apeironinc.com

Subject:                          Please review this candidate for: OSP Technician

 

This resume has been forwarded to you at the request of Monster User xapeix03

Matthew Johnson 

Last updated:  12/08/14

Job Title:  no specified

Company:  no specified

Rating:  Not Rated

Screening score:  no specified

Status:  Resume Received


Las Vegas, NV  89104
US

Quick View Links:

Resume Section

Summary Section

 

 

RESUME

  

Resume Headline: Matthew Johnson

Resume Value: hgvu4csvmuv7wru4   

  

 

Matthew Johnson

Backhaul Market Manager / Outside Plant - Electrical Design / Right of Way, Permitting and Project Management.

702-349-7658

 

 

Relevant Experience:

 

ALCATEL - LUCENT / S-COM - 11-26-12 to Present.

BACKHAUL MARKET MANAGER

SPRINT NETWORK VISION PROJECT / LAS VEGAS MARKET

 

·   Project is an upgrade, Retrofit and Migration to 4g Technology of 497 sites in the Las Vegas and surrounding area market.

·   Effectively manage and coordinate AE firms, backhaul provider, property owner, GC and Sprint on AAV Design and Construction through close-out process.

·   Design review and approvals to insure cost effective methods under aggressive timelines.

·   RFQ, ATP, NTP per contract guidelines. 

·   Extensive tracking and process flow input into various systems.

·   Manage AAV Permitting, Site Acquisition, Entitlements, MLA, SLA completion and submittal.

·   Construction management, Quality assurance and site approval

·   Manage P.O. submittal, approvals, and construction completion close-out.

 

 

OPTICA NETWORK TECHNOLOGIES 3-2012 to 11-12

Right Of Way / Site Acquisition Agent

NHA/NTBI Project Nevada

·                       This Federal and Privately funded project will complete 775 miles of new fiber from Reno, NV to Las Vegas, NV utilizing attachment agreements with current incumbent Power Agencies as well as lease agreements of various infrastructure pathways. The project will provide high speed connectivity to All NHA associated hospitals as well as Emergency response facilities.  I am tasked to research, identify and acquire all private utility easements required as well as OSP Design assistance as needed.

·                       Execute initial project introduction interview with private property owner, resolve any potential issues, and Represent the project with Professional Integrity.

·                       Research APN, DEED, PLATS, Legal descriptions, Easements and provide acceptable compromise between Optica Networks and property owner to acquire signatures.

·                       Serve as liaison during project completion and resolve any conflicts.

Mountain LTD for LUMOS Networks 10 - 2011 to 3 - 2012

OSP Engineer / Fiber Design Engineer / Project Coordinator

Charleston, WV 

·   After receipt of Sales Engineer OSP request, A High Level “SWAG” is provided

·   An initial OSP Estimate is provided within 72 hours

·   All Permits, pole applications, City, County, DOT, Private Easements, Railroad and Water Authority are submitted.

·   Detail Design is Performed

·   Permits are followed through to approval

·   Design completion is submitted to Construction and followed through until completion and final Design to Construction changes are posted into permanent records.

·   Designs are Aerial, Buried and Underground methods

·   Inside Conduit design and Construction are completed per customer request.

 

 

 

ATT

QC Data Inc. 3-11 to 8-11

Engineering Manager

Lafayette and Lake Charles, LA

QC Data Inc. has the Engineering contract to provide Fiber, copper, FTTC, Rehab, Road projects, new services as well as Joint Use coordination and management for the Lake Charles and Lafayette Area under AT&T jurisdiction.

·   Effectively manage 20 OSP/ISP Engineers for the delivery Of AT&T business requirements.

·   My team consists of: Fielders, Drafters, Right of Way acquisition, Feasibility, as well as OSP/ISP Engineers.

·   Contract requires 100% timeliness and 92% Quality assurance scores, under aggressive AT&T business requirements, as well as frequent Engineering changes and quality reviews.

·   Provide AT&T and QC Data Inc. Management group with daily updates and bi-weekly conference calls coordinating the work flow process, invoicing submittal and payment, construction scheduling and completion estimates, redlines and Engineering revisions.

·   Conduct frequent training sessions, identify issues and utilize all available resources to ensure enforcement of AT&T policies and procedures are implemented in a timely fashion.

National Security Technologies 3

Nevada National Security Site

Wireman Foreman, DOE LOTO Tagging Authority / Project Planning and Coordination

·            Complete Design, Estimation and Work package planning of facilities to support movement of OST operations.  Design included: temporary power, distribution power equipment design, conduit structure design, cable sizing calculations, field equipment calculations and UPS, Generator and ATS sizing and procurement of all equipment and materials.  Effectively managed installation team with install under strict completion deadlines.

·            Design-build facilities to support Big Explosives Experimental facility set up and support of several events.  Design and installation utilized distribution power “skids” and Nuclear Grade 3 materials.

·            Completed install and as-built drawings in the construction of the “verb” facility to include all Safety Significant equipment.

·            Work package management to emphasis all current DOE/NNSA safety requirements.

·            Throughout my employment with Nstec and Bechtel Nevada at the site, there were many projects that design, coordination with Engineers and safety personnel was imperative in the completion of critical projects.

·            I have thorough knowledge of NEC / NFPA codes and requirements.

 

Rosedin Electric

City Center “Veer Towers”

Las Vegas, NV 

General Foreman / PROJECT MANAGER

·            This was a design-build construction project to consist of Fire Alarm, Lightning Protection, Distribution Power, Temporary Power and Material Procurement.

·            Effectively worked with several local and state agencies to provide construction drawings to field personnel.

·            My efforts were focused on Fire Alarm design and distribution power for the towers. Perini Constructors worked under violation with approved construction drawings  not available which made it important to coordinate efforts to provide a quality design to Electrical Installation teams and keep project schedules.

Northstar Communications Inc. 2-05 to 9-05

Contract Turf Engineer for EMBARQ / FT Walton Beach, Florida

·   Complete all Telecom request for design from Held orders to new construction projects as well as Retrofit, Road improvements, and Facility Upgrades.

Ameriss Telecom:  3-04 to 2-05

R.O.W. Manager (Riverside office) FTTP Project for Verizon.

·   All Phases of Right of Way acquisition and permitting efforts.

·   Effectively managed Engineering group of 40. Directed group on permitting requirements, quality control and aggressive customer completion deadlines.

·   Conducted bi - daily conference calls for completion reporting with Verizon management.

·   Completed permits in areas from: San Bernardino County to San Diego. Approx 700 Permits in 60 days. 10 Agencies

·   Our group was instrumental in the success of the Verizon Southern California construction efforts and investor confidence.

MJ Electric. 2003-2004

Start up Foreman

Silver Hawk Power Plant

Las Vegas, NV

·   Direct subordinates to complete loop verification and repair.

·   Coordinate start up process as needed for the turn up of the facility.

 

Mountain LTD. 2001 Several Times during 2000, 2001, 2007, 2012

Contract turf Engineer for Ameritech Chicago ILL

Complete all Telecom request for design from Held orders to new construction projects as well as Retrofit, Road improvements, and Facility Upgrades.

 

OSP Consultants 6-98 to 4-00

Project Manager, FPL Fiber-Net LLC. (Various Cities in Florida)

Long haul fiber backbone and distribution design project.

·   Complete turn - key design and Construction Management.

·   Logistic Support

·   Design engineering Aerial and Underground

·   Quality control

·   Permitting

·   Provide customer with RFQ, estimate review and sub contractor awards.

·   Produce and provide ATP as well as close out submittals

·   This was a cradle to grave operation completed on schedule and under budget under the most UN - realistic schedule ever requested.

·   Acquired Georgia Low Voltage Contractors License while employed.

Education:

DOE/NNSA @ Nevada National Security Site

Site Training Over 300 Hours

 

Phoenix Institute of Technology

Associates of Electronics degree obtained.

4.0 GPA Directors award received

 

IBEW Local 357 Las Vegas, NV / NECA / NJATC

Journeyman Wireman

8000 hrs OJT and 1280 hr classroom

5 yr program

4.0 GPA Achieved

 

The following is a list of my relevant experience as a Design Build Wireman, Project Manager, Estimation and Coordinator of major projects.  All of the projects required input with the design, completion of the work package and implementation of NSTEC and BECHTEL NV “Core” safety principals. Projects were done under VPP Status and ISO 9001 company guidelines.

 

Job Specific Experience: (Journeyman, Foreman or Management Level)

·            SCADA Installation and Upgrade (4) Substations Nevada National Security Site

·            SCIF Top Secret Facility Construction

·            U1A/U1H Shaft Mining Support and Sub critical Experiment set-up and Maintenance.

·            Big Explosive Experimental Facility (BEEF) event set-up and support.

·            OST Camp restoration project.

·            Nuclear Waste Re-packaging Facility (VERB) construction, start-up and support.

·            DEEP Well - Water drilling power set-up and support.

·            Fiber-optic, Cat 6e, security and Fire Alarm System design and installation.

·            Work package development and implementation.

·            QG3, Safety Significant System, ATS, Backup/UPS design, install and as-built record keeping.

·            Data Center Construction.

·            High Voltage splicing, distribution voltage level install, low-voltage installs.

·            Solar Facility Installation.

·            MCC, DCS, Instrumentation installation.

·            Loop Verification, troubleshooting and repair.

·            Cell Site construction, set-up and turnover.

·            Main Power distribution.

·            Central Plant Construction.

·            (2) 3000 Amp Electric Boiler/ Feed-water facility construction.

·            Air Handler Upgrade and installation.

·            Lightning / grounding and Cathode protection.

·            Start-up procedures.

·            Commercial Electrical

·            Temporary Power

Certifications:

      Georgia Low Voltage Contractor 1998 to 2004 (expired)

OSHA: 10, 30

OSHA 40 (HAZARDOUS COMMUNICATION, TRANSPORT AND EMERGENCY RESPONSE)

First Aid/CPR/ AED

Fork Lift -- All Terrain

Aerial Lift, Boom, Scissor

LYNCOLLE XIT Grounding certification.

Fall Protection

Rigging

CONFINED SPACE Certified

Respirator Trained and Fit

Fire Prevention

Hot Work Permit

 

 



Experience

BACK TO TOP

 

Job Title

Company

Experience

Backhaul Market Manager

Alcatel-Lucent Telecom Ltd

- Present

 

Additional Info

BACK TO TOP

 

Current Career Level:

Manager (Manager/Supervisor of Staff)

Date of Availability:

Within 2 weeks

Work Status:

US - I am authorized to work in this country for any employer.

Active Security Clearance:

Inactive Clearance

US Military Service:

Citizenship:

US citizen

 

 

Target Job:

Target Job Title:

OSP Engineer

Desired Job Type:

Employee
Temporary/Contract/Project
Seasonal

Desired Status:

Full-Time
Part-Time
Per Diem

 

Target Company:

Company Size:

Industry:

Construction - Industrial Facilities and Infrastructure
Engineering Services

Occupation:

IT/Software Development

·         Telecommunications Administration/Management

Project/Program Management

·         Project Management

 

Target Locations:

Selected Locations:

US-FL
US-NV-Las Vegas

Relocate:

Yes

Willingness to travel:

Up to 100%

 

Languages:

Languages

Proficiency Level

English

Fluent