From: route@monster.com
Sent: Tuesday, December 22, 2015 8:02 AM
To: hg@apeironinc.com
Subject: Please review this candidate for: osp
This resume has been forwarded to
you at the request of Monster User xapeix03
|
|||||||
|
|||||||
|
|
|
||||||
|
||||||
|
ADOLFO (AJ) GUTIERREZ 26046 Clemente Gardens Lane Hemet, CA 92544 Cell 626-322-6620 gutieraj@msn.com Solutions oriented individual with 25 years of experience in the
telecommunications industry. ·
Demonstrated resourcefulness, creative problem solving, with the
ability to create and build customer relations. ·
Customer-focused, organized self-starter with effective skills
and the ability to manage multiple projects. ·
Communicate solution strategies and provide technical support
for engineering and construction. ·
Motivated achiever that strives to exceed goals. PROFESSIONAL
EXPERIENCE:
Engineering Manager
Construction
Manager OSP Engineering Quality Control 3/12 to PRESENT
PROJECT MANAGER/QUALITY CONTROL FOR INFOTECH TORRANCE CA Responsible for the
engineering management of Verizon projects assigned to the Info-tech. duties
were as follows, to insure that all engineering projects met or exceeded the
client’s expectations, project scheduling, budget tracking, permits, and
engineering efforts. To maintain constant communications with the client,
engineering, and drafting to insure that all methods and procedures are being
met. To review and approve all engineering time sheets, unit invoices, and to
resolve any invoice rejections. 6/11 TO 10/11 OSP
ENGINEER FOR PCS COMMUNICATIONS NASHVILLE, TN Responsible for the
engineering and design of AT&T Aerial, Underground, and buried facilities
such as Fiber to the Cell fiber and Copper ME’s, Single Family Units, Multi
Dwelling Units, DS3, Feasibility Studies, Surveys, Green Fields and BAU
projects (Copper and Fiber) Other responsibilities included the acquisition
of Encroachment Permits, Railroad Licenses, the development of Traffic
Control Plan, the preparation of Joint Pole documentation, and construction
support. 12/10 to 6/11 ENGINEERING
MANAGER FOR PDI CONSTRUCTION PHOENIX, AZ Responsible for the
engineering management of all AT&T, Time Warner, COX, SRP, and City of
Phoenix projects assigned to Paramount Designs. Projects included
Relocations, Fiber to the Cell, Fiber to the Premise, Single Business Units,
Multi Tenant Units, Single Family Units, Multi Dwelling Units, DS3, Delayed
Order Requests, Feasibility Studies, Surveys, Green Fields, Brown Fields,
Drafting, and BAU projects (Copper and Fiber) my management duties were as follows,
to assign all projects, quality control, project scheduling, and budgets. to
maintain constant communications with the client, governmental agencies such
as Arizona Department of Transportation, City, County, and State, Utility
companies, engineering, and drafting to insure that all methods and
procedures are being met and to review and approve all engineering time
sheets, vendor invoicing, feasibility studies, and to track all projects
insuring that all deadline and budgets are met. 08/10 to 12/10 OSP
ENGINEER FOR WELLSCO INC, CA. Responsible for the
engineering and design of Verizon Aerial, Underground, and/or buried projects
such as Out of Franchise, Fiber to the Cell site, Fiber to the Premise,
Single Business Units, Multi Tenant Units, Single Family Units, Multi
Dwelling Units, DS3, Feasibility Studies, Surveys, Green Fields and BAU
projects (Copper and Fiber) Other responsibilities included the acquisition
of Encroachment Permits, Railroad Licenses, and the development of Traffic
Control Plan, the preparation of Joint Pole documentation, Wind Loading and
construction support. 5/08 to 7/10
ENGINEERING MANAGER KENTON GROUP INC Responsible for the
engineering management of all Verizon projects assigned to the Kenton Group
in California. Projects included Relocations, Out of Franchise, Fiber to the
Cell, Fiber to the Premise, Single Business Units, Multi Tenant Units, Single
Family Units, Multi Dwelling Units, DS3, Delayed Order Requests, Feasibility
Studies, Surveys, Green Fields, Brown Fields, Drafting, and BAU projects
(Copper and Fiber) my engineering management duties were as follows to insure
that all engineering projects met or exceeded the client’s expectations. To
review and approve all feasibility studies and cost estimates, to track all
budgets, permits, and engineering efforts. To maintain constant
communications with the client, governmental agencies such as Caltrans, City,
County, State, Utility companies, engineering, and drafting to insure that
all methods and procedures are being met. To review and approve all
engineering time sheets and unit invoices. To review all projects received
from Verizon, insuring project feasibility in regards to project deadlines
and project reimbursement. 01/03 to
04/08 Own and operate a custom concrete company 08/02 to 01/03
SENIOR CONSTRUCTION MANAGER; EPC GLOBAL/ BECHTEL CORP. Dallas, TX.
AT&T Wireless Services E-911 Project Responsible for
construction management of the AT&T Wireless projects in the Dallas
market ( i.e. Make-ready Site walks, GPS & LMU Antenna installations,
Coax installations, Equipment installation - WLS, DSU, PDU units.) other
duties also included the make-ready walk downs of the AT&T Cellular sites
to acquired pertinent information for the upcoming projects, such as, the
identification of existing Telco equipment, power supply units, breaker
availability, and future power. My management duties were as follows, to
reviewed and approved all engineering and construction designs, the
preparation of RFP’s, project assignment, the tracking of permits, budget,
timelines, and material acquisition. To ensure that open communication was
maintained between client, property owners, property management, and OSP
construction contractors in order to insure timely completion of site
construction. Supervise the contractors, insuring quality and timely
installations of the proposed technology and also insuring that all Bechtel and
AT&T safety and construction procedures were met. To reviewed and
approved all time sheets, vendor invoicing, final turnover packages submitted
by the contractor. To verify that all required deliverables were submitted by
general contractor on time and documentation was complete. To reviewed and
approved all construction photos, sweep test, as-built drawings, and oversaw
the final site inspections and site completion documentation. Gathered and
assembled all deliverables for each AT&T cellular site for final
submission to AT&T. 05/00 TO 04/02
PROJECT MANAGER FOR METROMEDIA FIBER NETWORK INC.
Responsible for the
engineering and construction management of ISP and OSP projects in the
Phoenix market. (I.e. backbone, laterals, collocations, P.O.P’s,
customer implementation and joint builds) my duties included the review
and/or approve all feasibility studies, joint trench agreements, bid
packages, contract awards, material ordering, OSP and ISP construction
drawings, permit applications, as-built documentation, methods of
construction, and splice engineering packages. Oversaw contracted A&E
firms, construction contractors, and maintained constant communication
governmental agencies during permitting process. Insured that all engineering
and construction activities were in accordance with Metromedia engineering
and construction guidelines, and met all governmental agency construction and
safety requirements. 07/99 TO
5/00 PLANNER II FOR SOUTHERN CALIFORNIA EDISON ALHAMBRA,
CA. Responsible for the
engineering and construction management of the fiber network, inclusive:
route feasibility studies, cost estimates, determining the type and size of
fiber cables and design the most economical type of construction i.e.
overhead and/or underground. Engineered and developed construction plans,
prepare cost estimate, developed BOM’s, ordered materials, and develop
project schedules. The position also required the coordination of plans with
governmental agencies and property owners to obtain encroachment Permits,
Caltrans Permits, Railroad Licensing, Right of way and Right of Entry. I was
also responsible for the reviewed and approve of the final construction plans
from the engineering contract firms, I was required to inspect the different
construction phases and insure compliance with the construction plans, safety
rules, governmental regulations and company’s procedures, and maintained
internal communications with Edison’s Real Estate/Right of Way Department,
Legal Department, Carrier Solutions, Information Technology, and Construction
Department 02/96 TO 07/99
OUTSIDE PLANT ENGINEER FOR ICG COMMUNICATIONS IRVINE, CA. Responsible for the
engineering and construction management of the fiber optic network
facilities, inclusive, fiber optic backbone rings, laterals, collocations,
and interconnects facilities using aerial and/or underground standard
construction methods. Which also included, the coordination with Governmental
agencies such as, Caltrans, City, state, utility companies, property
management and OSP construction contractors in order to insure proper
understanding of our company’s proposals. The design and engineer packages
including all pertaining documents and requirements i.e. encroachment
permits, request access to other utility underground systems, requisition of
leased fibers from other utilities and joint pole applications etc.. Other
activities included the development of primary fiber optic rings, fiber
collecting rings, subscriber loops, and the administration of the fiber
networks including the fiber assignments and distribution, the development of
splicing configurations, preparation of cost estimates, scheduling, and
ensuring stability by directing all splicing activities and proper record
keeping. 03/94 TO 11/95 OUTSIDE PLANT ENGINEER FOR
SKINNER INTERIOR SYSTEMS INC. CALIFORNIA /ARIZONA Engineering projects for (ICS) integrated
communications Systems. The position was responsible for the design and
detailing of projects to establish a telecommunications network system within
new and/or existing developments. Responsible for the outside plant cable
routing, cable splicing, cable pair assignments, conduit requirements, and
safety requirements, including switch-room designs and engineering. Developed
scope of work for the outside plant and switch-room build out, material list,
and engineering recommendations. 03/90 TO 02/94 CATV ENGINEER FOR VOLTELCON
INC. MENTONE, CA. Responsible for insuring that engineering
specifications and inspection of CATV work orders and construction were in
compliance with GTEC practices, General Order 95, and CAL-OSHA safety
standards. This includes, but was not limited to providing technical
assistance to the CATV companies. Reviewing planned activities and current
requirements to develop action plans to meet CATV inspection and insuring
technical integrity of CATV companies “ make ready “ drawings and work
attached to rental poles. Initiating and maintaining the descriptive database
elements for the CATV system, Cable Company reports. Initiating time frame
requirements for CATV billing work orders. 03/89 TO 03/90 DRAFTING PLANS DRAWER FOR
ATRAMENTECH, PALMS SPRINGS, CA. Planned the process of transferring a
design into working plans. Verified both incoming and outgoing working
sketches and prints for accuracy, completeness and consistency. Created
construction drawings from original sketch specifications and oral instructions.
Viewed the layout of the problem and drew to the completed detail. 07/87 TO 03/89 FIBER OPTIC CONSTRUCTION FOR
CALIFORNIA WIRE AND TELEPHONE, SAN BERNARDINO, Assisted in the underground construction of
fiber optic network EDUCATION
COLLEGE OF THE DESERT
PALM DESERT, CA. Major: Architectural
design Minor:
Psychology LANGUAGES: English and Spanish
SAFETY TRAINING: CPR & OSHA 10 INTERNAL COMPANY PROGRAMS: Verizon: IDDS, ICGS, AAIS CORE, BDMS, CCP,
V-BUILD, PAR AT&T: BSTCAD, LFACS, OPEDS, OSP-CM QWEST: OSP-FM DRAFTING PROGRAMS: AUTO CADD,
MICROSTATION, BST CADD, AND VISIO |
|
|
||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Languages: |
Languages |
Proficiency Level |
|
Spanish |
Beginner |
|
|
|