From: route@monster.com
Sent: Tuesday, December 22, 2015 8:03 AM
To: hg@apeironinc.com
Subject: Please review this candidate for: osp
This resume has been forwarded to
you at the request of Monster User xapeix03
|
|||||||
|
|||||||
|
|
|
||||||
|
||||||
|
JOHN J. CUFF
518-461-1183 SUMMARY Nearly 32 years of experience
working as an OSP Fiber Network Engineer, most recently for Byers Engineering
Co. as a contract engineer working fiber projects for Level 3 Communications
in the Albany, NY district. My prior experiences include areas such as BAU fiber optic, DLC and
copper projects. Other projects included DOT road relocations, bridge
rebuilds, railroad crossings, river crossings, manhole and conduit
construction within highway limits and outside highway limits including all
required permits and easements as required. I assembled the cost estimates,
supporting documentation for funding approvals and tracked budgeted
expenditure levels. I am capable of providing customer consultation from
start to in service engineering. I have vast experience designing customer
fiber networks where point to point collapsed ring and ASWC service failure
redundant technology and equipment was required to meet the service
dependability issues. My FTTH experience dates back to the late 1990”s when AT&T trails
were using fiber fed ONU technology both aerially and in the buried
environments in the area of Stillwater, NY. My most recent work also involved
PON technology deployment within the buried residential environments using
new and existing infrastructure. EDUCATION 1981 – 1983STATE
UNIVERSITY OF NEW YORK INSTITUTE OF TECHNOLOGY AT
UTICA/ROME
BSEE, Digital Electronics theory and labs – Member
IEEE 1979 – 1981
HUDSON VALLEY COMMUNITY COLLEGE
AOS, Electrical Construction and Maintenance CERTIFICATIONS – A+, NET+, NYS Security Officer - Licensed SKILLS · FTTH experience in the areas of reading splitter data sheets, terminal
naming, hand hole fiber inner duct capacity limitations and fiber drop
limitations per conduit inner duct,
ONU powering using composite and non-composite cables for drops only,
grounding at power enclosure locations and non-enclosure locations · Visio (Microsoft) drafting, Familiar with Microstation BST Cad
Drafting System using GIS mapping as a basis for FTTX Engineering · GIS mapping technology used for drafting and measurement · Customer advisor planning entrance routes, UPS vs Battery backup
equipment setup and CSU service handoff recommendations · Supervising manager to drafters, clerks, OSP Engineers, contract OSP
Engineers, field installation techs, Construction Splicers, Lineman and
Maintenance personnel during numerous periods of time during my career · Copper cable engineering, buried and pole line construction, pole line
make ready surveys with joint utility companies, copper and fiber count
throws, conducted CTAP meetings, outside construction contractor bid meetings
and provided the documentation required for input to the OSS to assign
customer services through the network including the Digital Switching systems
and Remote Digital Loop Carrier systems required for service assignment
through the network WORK
EXPERIENCE 06 / 2013 –
8/2015BYERS
ENGINEERING – Upstate New York OSP Network Design Engineer
· Designed Outside Plant and Inter/Intra Building Fiber Optic cable
routes · Aerial make ready work on joint utility poles, pole line construction
while providing cost estimating and estimate preparation for capital,
maintenance and retirement expenditures · Underground manhole and conduit work, placing new fiber optic cables · Make ready activities including permits and easements · Liaison between engineering and construction sub-contract crews · Organized the associated documentation for client billing · Directed a group of drafters utilizing AutoCAD for preparation of the
prints for client presentation 02 / 2010 - 07 / 2012TEK SYSTEMS / FRONTIER
COMMUNICATIONS Outside Plant
Network Design Engineer, Fiber Optic route design, BAU, Project Management ·
Network Engineer preforming all
aspects of daily BAU field design. ·
Designed and engineered a new 15 mile
long fiber optic distribution/feeder route along an existing copper cable
route correcting substandard and hazardous conditions
by replacing existing pole line structure, obtaining easements and highway
permits for new aerial and buried equipment. ·
Corrected deficiencies in existing
local and New York State DOT cable road crossing height standards. ·
Held joint make ready utility meetings
with the local franchised power, CATV, and third party telecom carriers
attached to existing poles correcting separation
violations. ·
Work included seeding dark fibers at
existing copper DLC sites targeted for conversion to fiber optic
transmission equipment requiring eliminating and reversing an existing fiber optic feeder route through an existing bridge that was
scheduled to be replaced. ·
CAD drafted and submitted all drawings using the MAPCOM M4 Cad Drafting system , ·
Priced all Routine, Estimate level
projects, prepared associated documentation for proper capital approvals ·
Provided guidance to the line and
splicing construction crews throughout the project life. ·
Designed, staked and established new fiber optic routes along local public, NYS DOT highways, private property
and within Federal Park Lands of the
Adirondacks Mountains National Park in Upstate New York establishing a
multicarrier cellular network along the mountain passes ·
Conducted BAU routine work for
delayed orders, special service circuits, routine pole replacement and
retired plant capital recovery efforts ·
Designed solutions for new services,
planned and implemented copper distribution and feeder relief jobs for new
business and housing developments 08 / 1983 - 02 / 2009VERIZON TELECOMMUNICATIONS -
UPSTATE NY ISP
Circuit Design Engineer, OSP Design Engineer, Project Manager, Scheduling
Engineer, NE Division Staff Budgets, Special Project Initiative Coordinator –
All functions were in office, on Premise employee ·
Worked on as many as 50 small and
large projects at any given time as a Project Manager, Budget Coordinator,
customer contact for all activities from a customer complaint to FCC mandated
infrastructure improvement in the Copper Network and Broadband Fiber Network
Design Engineer, ·
Liaison to internal and external
customers outside Verizon as well as departments within Verizon. Corporate
level budget coordinator for the Upstate New York analog to Digital Broadband
conversions of all the central office entities in the Upstate New York
region. ·
Served on the Division Staff as the
Budget Coordinator for the Capital and Expense programs. ·
Oversaw reporting for a $230M Capital
program and a $60M Expense program. ·
Turf engineer responsible for all in
turf Project Estimates, Budgeting in the correct timeframes and estimate
accuracy. ·
Organized Contract Bid packages, arranged the bid meetings in the office and in
the field locations. Served as Turf Administrator and Single Point of Contact
for internal and external customers concerns. ·
Represented Verizon in numerous Legal
Depositions and Court proceedings as a Subject Matter Expert in the field of
OSP Engineering and current standards. ·
Capital Investment Recovery by
retiring old embedded plant through use of fiber feed digital remote terminal
sites, including the AT&T trial of FTTC in Stillwater, NY back in the
1990’s. ·
Extensive work with copper plant, MDU
Buildings engineering Fiber and Copper feeder/distribution pole line design,
underground manhole and conduit systems, air pressure, building cabling- BICS
trained ·
Trained / Mentored new employees in
the field of OSP ·
OSP subject matter expert - Capital
recovery by retirement and removal of outdated, abandon and damaged equipment effectively lowering the corporate capital investment base
for reduction of corporate tax liabilities ·
Broadband design of SONET Fiber Optic
networks, OC-1, OC-3, DS-1, DS-3, VOIP, DSL, PRI DSL and POTS services. ·
Managed the Upstate NY Division Staff as the Executive coordinating input data for an Expense budget
of $56M and Capital budget of $230M, ·
Reporting result variations with explanations based on district input variations. ·
Conducted monthly meetings allocating and prioritizing project workload to each turf managers
construction crews as well as providing completion dates to meet customer service dates ·
Supervising manager to drafters,
clerks, OSP Engineers, contract OSP Engineers, field installation techs,
Construction Splicers, Lineman and Maintenance personnel ·
Scheduled Construction crews to meet
Corporate PUC/ PSC required mandates. ·
DOT Road reconstruction utility
relocation expert. ·
Familiar with all OSS- operational
support systems for turn up and deployment of Central Office and Remote
Terminal electronics for digital, SONET and PON networks |
|
|
||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Languages: |
Languages |
Proficiency Level |
|
English |
Fluent |
|
|
|