From: route@monster.com
Sent: Tuesday, December 22, 2015 8:03 AM
To: hg@apeironinc.com
Subject: Please review this candidate for: osp
This resume has been forwarded to
you at the request of Monster User xapeix03
|
|||||||
|
|||||||
|
|
|
||||||
|
||||||
|
MICHAEL H. BOGNER 285 Sandcastle Aliso Viejo, CA 92656 [714] 396-0449 mhb285@cox.net OBJECTIVE:
Seeking a challenging and responsible position that fully utilizes my
experience and skills.
SUMMARY OF
QUALIFICATIONS:
A
combination of formal education, specialized training and extensive, diverse
experience has resulted in excellent qualifications as an OUTSIDE PLANT
ENGINEER / PROJECT MANAGER. Proven expertise in full project
responsibility, applying analytical and organizational skills to
initiate, develop and complete projects on time and within budget. Work
effectively independently or as part of a cooperative team effort.
Outstanding communicator, interfacing well with developers, contractors,
government officials and all levels of personnel. PROFESSIONAL EXPERIENCE: Project
Manager (Zayo
Group)
December 16, 2013 to present Responsibilities:
Single point of contact for
managing applications and relationship to ILEC and / or other conduit /
structure lease and joint build efforts. Managing relationship to
jurisdictions and ROW contacts such as cities, counties and railroad. Working
in close relationship with underlying rights group to identify and prepare
encroachment permitting, franchise agreements. Oversees timely permitting
submittal and on time performance of engineering and construction vendors.
Assists in the planning and implementation of fiber connectivity solutions
programs and projects that adhere to approved plans, budgets and
schedules. Coordinates and facilitates with internal and external
resources to effect the timely completion of projects. Designs and Implements
commercial and carrier fiber networks, infrastructure, backbone and lateral
builds. Works within a Data Center environment implementing
customer-installation projects and services. Creates and tracks project
budgets in relationship to Network Operations. Provides
direct interface with customers, subcontractors, jurisdictional authorities
and interoffice personnel. Oversees procurement of equipment and materials
related to the assigned projects. Executes Bid Process, inclusive of
budgetary requirements and the tracking thereof. Verify
and update project documentation. Timely tracking of project progress and
budget in Salesforce and manual tracker. Timely update of budget requests,
purchase orders, project close out and internal service orders in Salesforce. Commercial
Cable Services Inc. (Time Warner
Contractor) April 18
2013 to 2013 to December 16, 2013 Responsibilities:
Construction cost estimator for Time Warner Communications LA Metro area and
Orange County area. Field service requests for fiber or coaxial cable
services to commercial or multi unit dwellings. Prepare design and
construction budgets to determine if proposed project is economically
feasible for construction. Review incoming pole applications along with
wind/pole loading data from contractors prior to being issued for
construction. BAS
Construction / Tetra
Tech
April 15, 2012 to April 17,
2013 Responsibilities:
Landfill gas construction technician. Supervise construction of landfill gas
conduit systems to extract methane gas. Coordinate materials and equipment. In
training as a purchasing agent for landfill gas systems. Commercial
Cable Services Inc. (Time Warner
Contractor)
August 24, 2008 to April 15, 2012 Responsibilities:
Construction cost estimator for Time Warner Communications LA Metro area and
Orange County area. Field service requests for fiber or coaxial cable
services to commercial or multi unit dwellings. Prepare design and
construction budgets to determine if proposed project is economically
feasible for construction. Review incoming pole applications along with
wind/pole loading data from contractors prior to being issued for
construction. Verizon
Project Engineer (Wellsco
Inc.)
May 19, 2008 to August 22, 2008 Responsibilities:
Fielding commercial (MTU) and residential (MDU) services for Verizon’s FIOS
build out in the Santa Monica / West Los Angeles project. Trained on ICGS and
IDDS V8 / Micro station map and system print call-up. Prepare complete
field note package to be drafted into construction drawings. Project
Manager (Cable Engineering
Services)
February 14, 2008 to March 20, 2008 Responsibilities:
Training to be a Verizon FIOS MDU Engineer. Outside
Plant Engineer (Cascade Design Contractor)
January 3, 2004 to January 28, 2008 Outside
Plant Engineer (Golden Field Services
Contractor)
July 6, 2003 to December 30, 2004 Sprint
Global Management Group / Long Distance/PCS / Nextel, Irvine, CA Responsibilities:
Field engineer all projects requiring either forced or voluntary relocation
of aerial or underground facilities. Obtain underground substructure maps to
locate existing underground utilities in project area and determine the best
routing. Obtain project plans and analyze to determine any required
re-routing of any aerial facilities if aerial only. Coordinate with
outside AutoCAD drafting contractor to get completed design drafted for bidding.
Coordinate all outside plant bidding projects. Assemble packages for
right of way review and obtain all permits or easements that might be
required. Oversee all utility review requests for cable location
activities. Serve as the Sprint Long Distance (FON) representative on
the board of the Southern California Joint Pole Committee and Statewide
G.O.95/128 Rules Committee. Coordinate JPA fielding and JPA
submittals. Sprint field inspector on various Railroad projects
throughout Southern California area. I hold current safety training for the
following Railroad agencies; BNSF, Union Pacific and Metro link. Responsible
for disaster restorations of active facilities that are damaged by fire,
vehicular traffic or damaged by construction equipment. Direct supervision of
contractors on site during restoration activities as well as coordination
with Sprint technicians to reestablish service to sites and systems off air. Sr.
Outside Plant Engineer (Fortune Contractor)April 2001 to July 3, 2003
SPRINT
PCS / Network Operations, Irvine,
CA Responsibilities:
Analyze the design maps to determine where underground projects and power
supply pedestals are to be required. Obtain underground substructure
maps to locate existing underground utilities in project area and determine
the best routing. Coordinate with drafting contractor to have projects
drafted and ready for submission to the various governing entities within the
project area. QC the product returned by the drafting contractor for accuracy
and any conflicts. Coordinate with the service planners at Edison Co. and the
Department of Water and Power to provide service to proposed power supply
locations. Serve as the Sprint PCS representative on the board of the
Southern California Joint Pole Committee and Statewide G.O.95/128 Rules
Committee. CONSTRUCTION
COORDINATOR July 21, 1997 to April 2001 SPRINT
PCS / CABLE INTEGRATION, Irvine, CA
Responsibilities:
Coordinate with PCS cable TV integration design department on the location of
centralized metered PCS power supplies for wireless telephone service.
Contact the Edison Co. service planner or the D.W.P. service planner for the
areas in question to determine if power service can be provided. Coordinate
with the service planner for The Gas Company to provide natural gas service
to the final power supply locations to run the stand-by generator in the
event of a prolonged power outage. Obtain city and or county permits for
excavation / electrical and plumbing for gas service. Issue the permitted
jobs to the contractor for construction. Complete final inspection of
all jobs to make sure the contractor has performed all work to company and
agency standards. POWER
SUPPLY COORDINATOR FOR REBUILD PROJECTNovember 1995 to July 18, 1997 TIME
WARNER COMMUNICATIONS, Garden Grove
CA Responsibilities:
Coordinate with system designer on location of all new /proposed power supply
locations during the rebuild project, and then go to the field to determine
the best location. Looking for power service feed point’s access to the
existing cable system and aesthetics to the local area. Taking field
notes for permanent construction drawings, submitting the drawings to the
Power Company and the city for approval. Providing the approved drawing
and reviewing it with the contractor for construction. Coordinating with the
power company, city public works and the city electrical inspectors for
sign-off after work has been completed. Verifying that the power service
meter has been placed and the unit has been fully equipped so activation of
the rebuilt system can happen on schedule. Direct supervision of
contractors during all phases of construction project. CONSTRUCTION ENGINEER, February 1990 to November 1995
PARAGON CABLE TV, Garden Grove, CA. Responsibilities:
Field all aerial and underground, railroad, flood control, highway, city and
state crossings, and get them drafted. Fill out the proper forms and submit
them, along with complete follow-up and keeping up permit log. Underground
construction drawings to be sent out for bidding. MDU engineering and
inspection. Make ready engineering, underground research. Rule 20
projects, fielding/design/layout. Coordinating with AutoCAD operator on
final product. Coordinating contractors work load for all
projects. Attend joint trench pre-bid meeting to answer
questions. Inspection and coordination with contractors in field. CONTRACT ENGINEER March 1989 to September 1990 BURKLEE ENGINEERING, Laguna Niguel, CA Responsibilities:
As-built strand mapping, underground routing, future and existing, and make
ready engineering. CONTRACT ENGINEERFebruary 1987 to March 1989 CABLE ENGINEERING, INC., Hanford, CA Responsibilities:
As-built strand mapping, underground routing, future and existing, and make
ready engineering. MAKE READY ENGINEERFebruary 1985 to February
1987 BDB ENGINEERING, Sacramento, CA Responsibilities:
Make ready engineering, underground engineering, underground substructure
research strand mapping, and joint pole research. MAKE READY ENGINEERApril 1984 to February 1985 K&B Engineering, Sacramento, CA Responsibilities:
Make ready engineering, underground engineering, underground substructure
research strand mapping, and joint pole research. MAKE READY ENGINEERJuly 1983 to April 1984 THOMAS TECHNICAL, Irvine, CA Responsibilities:
Make ready engineering on General Telephone only poles and all joint poles. CONTRACT ENGINEERMay 1982 to April 1983 K&B Engineering, Santa Ana, CA Responsibilities:
Make ready engineering, underground and aerial strand mapping. OUTSIDE PLANT ENGINEER December 1981 to
May 1982 DOUSERVE CONSULTING CORPORATION, Walnut, CA Responsibilities:
Field all aerial and underground, railroad, flood control, highway, city and
state Crossings,
and get them drafted. Fill out the proper forms and submit them, along with
complete follow-up and keeping up permit log. Underground construction
drawings to be sent out for bidding. MDU engineering and inspection. Put together
telephone and power pole applications and maintain blueprint machine. SPECIAL
PERMITS ENGINEERMarch 1981 to November 1981 CALIFORNIA CABLESYSTEMS, INC, La Mirada, CA. Responsibilities:
Field any and all aerial and underground L.A. County flood control crossings,
Southern Pacific Railroad crossings, and Caltrans crossings. Field
underground tie-ins, get them drafted, and send them out for bidding. Follow
up on all jobs that have been contracted out with inspection. MDU engineering
and inspection. Also, private right-of-ways. Put together GTE, Pacific Bell,
and Southern California Edison pole applications. UNDERGROUND
FIELD ENGINEERJanuary 1980 to March 1981
DICKINSON PACIFIC CABLESYSTEMS, Huntington
Beach, CA Responsibilities:
Full responsibility for underground routing. Fielding of pedestal locations,
power supplies, and aerial and underground flood control, railroad and state
highway crossings to be submitted to right-of-way. EDUCATION: 6/75High
School Diploma, Bishop Timon HS, Buffalo, N.Y. PERSONAL INFORMATION: Excellent HealthBirthdates:
11/01/1956 Married REFERENCES: Available Upon Request 1 |
|
|
||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Languages: |
Languages |
Proficiency Level |
|
English |
Fluent |
|
|
|