– rgrimes271@ yahoo.com (703)283-6434 Inspector\
Staking\ Res.Engineer EXPERIENCE: Presently: OSP inspector for
RUS Project for Vantage point solutions. 6/14-4/15 Wolfpack
communications. OSP Inspector for FTTP for Google Project in KC MO. Mountain ltd 2/14-5-14 Inventorying fiber for North
Carolina broadband in selected counties. 9/13-12-13 Finley Engineering Bismark ND.
office Supervisor Gary Horner:
701-222-1500 Inspector FTTH on Crow Agency
Reservation Hardin MT. Resident Eng. For
backbone cable placement for next yrs FTTH 4/13-8/13 Mountain Ltd Aerial Inspector
for Verizon FTTT Southern WV. Supervisor Chris Smith:
207-482-7652 9/15/12-12-22-12 Resident Eng. for Fail Eng.
for TDS Place 96ct by overlashing
& onto new strand. Anchors & guys Prepare ODC locations. Place
pads & materials 6/12-8-12 RW Comm FTTH Inspector Newcastle Wy. 5/12-6-12 Staking for buried &
aerial plant for RW Comm.in UP MI. 11/25/11-4/1/12 OSP Implementation for TDS
North Anson ME. Take order from field services
for cable moves, service line extensions maintenance issues, make ready
applications for capital projects Determine units and footages
(mostly aerial) field draft, cadd Maintained & tracked using
TDS Tracking tool & clarity software Never over planned cost of job 8/15/11-11/11/11 RW Communications 866-872-2902 FTT Curb. plow, trench, bore
Inspector ST. Marys Ga. For TDS build Installing 24-864ct, HH, MST
units. 11/5/10-4/11 Resident Eng for Desert
Consulting Services A.R.R.A. Project Tucumcari
N.M.Building to Anchor locations Staked rural towns (4) for
round 2 Provide all billable no’s for
weekly production reports Provide all trouble shooting
decisions for field changes Manage inspectors Correlated construction with
state & municipal mgmt Constructed necessary
spreadsheets & redlines 9/10-11/10 RW Communications Plow Inspector for 24-144ct
direct buried (21m) 4/10-9/10 Sunbelt @727-596-1500 Backbone FOC build on Marine
Base Quantico Va. Install 2-1.25 ducts,
handholes & 144ct cable Promoted to lead inspector MID-STATE CONSULTANTS 1475 NORTH 200 WEST P.O. BOX 311 NEPHI UT.84648 435-623-8601 09-11/11-09 · Resident Engineer/Inspector
for 16.5 m Toll Cable for Century Tel ( Construction Mgr. Ken Wiles
406-253-5020) · Rock Sawed 22000ft, Bored
2030ft & Plowed in 89000 ft of 1.25hdpe. Installed 100pr, 200pr ( 2800ft
& 4800 ft 22x24 copper) and 24 ct f.o.c ( Entire Route) · Installed BDO’S , Warning
Mkrs · Splicing for all Cables · 523, Cup Forms and all
Redlines · Completed in 4.5 weeks. Prairie City Or. 05/09-09/09 · FTTH For Oregon tel. using
515 R.U.S. SPECS · Placed and proofed 4 &7
way multi-duct & .75 Hdpe Service by trench,bore,missle & plow · Installed mainline F.O.C. (
144,48 ct ) , 2ct service · Installed Conc. MH · Completed all redlines for
project under proposed contract time 01/09 -05/09 R.W. Communications in San
Perlita Tx. F.T.T.H. for Valley Telephone · 9 mile build out for the
town of San Perlita. · Bore and Install 24,48
96,144,216ct mainline feeder and distribution cable in 1.25 hdpe with pop in
C.O. to type 3,4,5 BDO peds and handholes · Bore and plow in all 2ct
service f.o.c. & mainline · Install type 2&7 Nids · All Redlines for build
under proposed completion date June 0/8 to Dec. 0/8 R.W. Communication Services
L.L.C. P.O. Box
144 Eldorado
WI.
866-872-2902 · Inspection for 3rivers
Telephone; 1.) 2.7 m of relocating and updating existing copper cable with
F.O.C. 2.) Placing new F.O.C. mainline for future FTTH. 3.) Place service
Nids and cable. 4.) Build to and into Existing C.O.’S (2). 5.) Stake for
mainline and drops. December 2006 to May 2008
Telplexus Inc. 1639
Medical Ctr Pkwy St. 305
Murfreesboro Tn. 37129 (615)-
225- 5244
Supervisor: Mike Steakley (615)-556-7665 POSITION: Inspector for fiber
optic cable construction. Engineering staking. CONSTRUCTION: · Make sure that contractor
is aware of where plant is to be placed I accordance with construction
drawings and any right of way issues that need to be complied with. · That contractor places
plant with correct construction procedures, i.e. boring, plowing, trench and
missile into place so that cable is not damaged and at proper specification
as to depth, and desired distance from a known point ( r.o.w. or e.o.p ). · Document or
“redline”auctual placement of plant and any field changes for final as-built
drawings. · Perform shield continuity
testing, power meter testing when cable is in final resting position. · Locate F.O.C. when needed Engineering:
1.) Staking out future plant. This consist of where actual
placement of cable will be, and a known offset from some reference point
2.) Showing types and sizes of pedestals, handholes and number of drops
being placed in each.
3.) Stationing if needed and providing type of RUS callout for; 1)
Method of construction and distance (bore, trench, plowing, Rock footage,
concrete or asphalt cut, placing in conduit or direct buried, building
entrance, aerial placement, warning signs etc. )
4.) Placing information on existing or created drawing for
final Cadd and Q C final dwgs
5.) Meeting with any federal, state, local entities or utilities
for their requirements and for needed information in obtaining permits.
6.) Engineering or Staking aerial plant with RUS callouts · January 0/7- 0/9-0/7:
Inspector for Highland Telephone 37 mile RUS project in Oneida TN for
mainline construction both direct and innerduct buried, aerial placement,
final inspection of nido placement, spot checking depths · October 0/7-12/07
Inspector for TDS fiber to the home in Knoxville Tn. · January 0/8- Mar. 0/8
Stake out and construct drawings for RUS project phase one for Smithfield
Telephone in Bloomington IN. · Apr-May 08 RUS inspector
for FTTH Project for Goldenbelt and Rural Telephone in Hays Ks. EQUIPMENT PROFICINCY: · MIT400 Megger · EXFO PPM-350B Pon Power
Meter · EXFO Fot-300 Optical Loss
Test Set · Dynatec w/ A-Frame and
houndog Locators January 2004
to June 2006 Adesta,
L.L.C. 943 E. Hazelwood
Avenue, Bldg. 2, Rahway, NJ 07065 (732)827-0808,
ext. 115 Supervisor: G.
Ernest ~March 2003
to January 2004 Adesta -
D.C. Net Project
Construction Manager: Andy Farrell Home
(540)972-0166 Work
(703)930-6650 · Removed lead lines and installed
1.25 innerduct and F.O.C. utilizing old Verizon system. · Engineered two laterals for
Independence Airlines. Researched right of way, determined utility
conflicts, stationing and methods of construction. · Created engineering and
traffic control drawings for submittals to Fairfax County, VA, with first
time approvals. · All asbuilt and finished
drawings for client. ~March 2003
to May 2003
. Adesta -
D.R.B.A. & DE Dept. of Transportation N.J.T.K.
Project
Construction Manager: G. Ernest
(732)827-0808, ext. 115 · Eight mile build of
underground and bridge crossing (8000’ Delaware Memorial Bridge) · Installed 1.25 innerduct by
trenching and boring on I-295 and I-95. Installed handholes, 4” f.r.e. with
multicell conduit and junction boxes on Delaware River crossing. · All asbuilts and redlines
and correlation with CADD for finished product. ~May 2003 to October
2003 Adesta -
M.B.C. Project
Lynchburg, VA
· 300 mile build for
Midatlantic Broadband Corp., 80% aerial plant, 20% underground (u/g). · Did initial check of
rake-off distances to bid types of footage. · Courthouse deed and tax map
research; G.P.S. route. · Returned from New Jersey to
engineer as needed laterals up to 3 miles. ~October 2003
to June 2006 Adesta -
Rahway, NJ · Qwest regen site: excavation,
strip topsoil, building pad soil resistivity test, footer and pad rebar,
concrete pour, grounding ring and testing, building and generator placement,
security fencing. · New Jersey Turnpike
Authority and Atlantic City Expressway relocates for highway widening and new
toll plazas. · Engineered aerial and u/g
route for Conversent Communications in Hackensack, NJ; discovered route, pole
inventory, determined make ready and material list, applications to
Connective Power and Verizon entities. · All permits received on
first time application. · Engineered aerial (4.4m)
u/g (0.5m) plant for above net in Pleasantville, NJ. · Linked security cameras for
N.J.T.A Service Plazas to existing backbone. Installed pole base, 38’ poles,
cameras, jct boxes, environmental F.O.C. equipment cabinets and electrical
conduit to power source. · For inside plant:
determined core boring locations, fiber placement, materials such as conduit
types, pull box locations to terminate in communications room. October 2001
to April 2002 Telco
Technologies – (Out of Business) · Senior Inspector for all
aspects of construction for u/g F.O.C. installation for World Com in
Arlington, VA. August 2000
to June
2001
Cross Country
Land Services – (Out of
Business)
10700 Corporate
Drive, Suite 100, Stafford, TX 77477 OSP Engineer for route development for 52 mile
Montgomery County, MD inner-nodal overbuild for World Com. · Assisted in gathering all
pertinent field information for creating construction drawings. · In charge of all aerial
overlash build: power entity Pepco, stick poles and create pole inventory
sheets, correlating with CADD to construct ‘D’ size drawings. · Responsible for all traffic
control plans and permits. May 2000 to
July 2000 S.E.
Technologies Moon Township,
PA · Level III Inspector for u/g
F.O.C. install, contracted to Lightwave Spectrum of 3901 Centerview Drive,
Chantilly, VA for A.T. &T. work. Supervisor: Glenn Winninger (703)409-2970.
September 1999 to February 2000 ~S.E.
Technologies · Level III Inspector.
Stamford, CT to Providence, RI. · Route development; wetland
permitting issues, courthouse research, surveying, schematic and chaining
sheets. · Constructed 5000’ through
purchased utility ducts. Install innerduct and fiber 35000’ u/g street
and field trenching along Metro Rail right of way. Project
Manager: Glenn Winninger March
1999 to June 1999 ~S.E. Technologies -
Williams Communications, Emporia-Topeka, KS. · Level III Inspector. · Inspected for directional
drilling at river crossings, bridge overpasses, underslopes, road crossings
for innerduct and F.O.C. placement. · Plow, trenching, rock,
fiber install, restoration crews. · As built drawings for all
construction. · Project Manager:
Glenn Winninger July
1998 to March 1999 ~S.E. Technologies · Hired as a Party Chief to
survey pipeline and railroad right of ways as well as construction,
topographic and boundry surveys. Awards and Certificates *Adesta President’s Award –
presented to one regional or home office that generates twice as much revenue
as forecasted in original strategic plan; tripled the amount of cash
predicted in plan for 2004. *Certified in First Aid and CPR. *Safe Driving Training